ML12058A570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12058A570
| number = ML12058A570
| issue date = 02/24/2012
| issue date = 02/24/2012
| title = 2012/02/24 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
| title = NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
| author name = Feintuch K
| author name = Feintuch K
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Fields L C, Laine P A
| addressee name = Fields L, Laine P
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000331
| docket = 05000331
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:ME6818
| project = TAC:ME6818
| stage = Other
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRR-PMDAPEm Resource From:                      Feintuch, Karl Sent:                      Friday, February 24, 2012 4:13 PM To:                        Fields, Leslie; Lain, Paul
 
==Subject:==
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).
Attending the 2/22/2012 call for the NRC were:
Name                    NRC/NRR affiliation Karl Feintuch            DORL/LPL3-1 Alayna Pearson          DRA/AFPB Dan ONeal                      DRA/APLA Stephen Dinsmore        DRA/APLA Jay Robinson            DRA/AFPB Paul Lain                      DRA/AFPB Harry Barrett                  DRA/AFPB Bernard Litkett                DRA/AFPB Duane Arnold will provide a corresponding list of its attendees.
The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC responses.
The NRC staff clarified:
Fire Protection RAI 9 PRA RAI 2              PRA RAI 3                PRA RAI 12 PRA RAI 36              PRA RAI 60 Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60 are in both the lists above and below.
Monitoring Program RAI 1 Safe Shutdown Analysis RAI 6            Safe Shutdown Analysis RAI 7 PRA RAI 6              PRA RAI 12              PRA RAI 28 PRA RAI 35              PRA RAI 38              PRA RAI 43 PRA RAI 50              PRA RAI 60              PRA RAI 61 Fire Modeling RAI 1                      Fire Modeling RAI 2 Radioactive Release RAI 1              Radioactive Release RAI 2 Radioactive Release RAI 3 Fire Protection RAI 9 In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.
Karl Feintuch 1
 
USNRC 301-415-3079 2
 
Hearing Identifier:      NRR_PMDA Email Number:            274 Mail Envelope Properties        (Karl.Feintuch@nrc.gov20120224161300)
 
==Subject:==
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date:                2/24/2012 4:13:03 PM Received Date:            2/24/2012 4:13:00 PM From:                    Feintuch, Karl Created By:              Karl.Feintuch@nrc.gov Recipients:
"Fields, Leslie" <Leslie.Fields@nrc.gov>
Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>
Tracking Status: None Post Office:
Files                            Size                    Date & Time MESSAGE                          2515                    2/24/2012 4:13:00 PM Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:34, 5 December 2019

NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
ML12058A570
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/24/2012
From: Feintuch K
Plant Licensing Branch III
To: Leslie Fields, Laine P
Office of Nuclear Reactor Regulation
References
TAC ME6818
Download: ML12058A570 (3)


Text

NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Friday, February 24, 2012 4:13 PM To: Fields, Leslie; Lain, Paul

Subject:

ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).

Attending the 2/22/2012 call for the NRC were:

Name NRC/NRR affiliation Karl Feintuch DORL/LPL3-1 Alayna Pearson DRA/AFPB Dan ONeal DRA/APLA Stephen Dinsmore DRA/APLA Jay Robinson DRA/AFPB Paul Lain DRA/AFPB Harry Barrett DRA/AFPB Bernard Litkett DRA/AFPB Duane Arnold will provide a corresponding list of its attendees.

The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC responses.

The NRC staff clarified:

Fire Protection RAI 9 PRA RAI 2 PRA RAI 3 PRA RAI 12 PRA RAI 36 PRA RAI 60 Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60 are in both the lists above and below.

Monitoring Program RAI 1 Safe Shutdown Analysis RAI 6 Safe Shutdown Analysis RAI 7 PRA RAI 6 PRA RAI 12 PRA RAI 28 PRA RAI 35 PRA RAI 38 PRA RAI 43 PRA RAI 50 PRA RAI 60 PRA RAI 61 Fire Modeling RAI 1 Fire Modeling RAI 2 Radioactive Release RAI 1 Radioactive Release RAI 2 Radioactive Release RAI 3 Fire Protection RAI 9 In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.

Karl Feintuch 1

USNRC 301-415-3079 2

Hearing Identifier: NRR_PMDA Email Number: 274 Mail Envelope Properties (Karl.Feintuch@nrc.gov20120224161300)

Subject:

ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date: 2/24/2012 4:13:03 PM Received Date: 2/24/2012 4:13:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:

"Fields, Leslie" <Leslie.Fields@nrc.gov>

Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2515 2/24/2012 4:13:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: