NRR E-mail Capture - ME6818 - Duane Arnold Adoption of NFPA-805 - Generic List of Documents Requested for the Sharepoint Portal
ML11304A148
Person / Time
Site: Duane Arnold 
Issue date: 10/28/2011
From: Feintuch K
Division of Operating Reactor Licensing
To: Cross W
Florida Power & Light Co
References
TAC ME6818
Download: ML11304A148 (4)


Text

1 NRR-PMDAPEm Resource From:

Feintuch, Karl Sent:

Friday, October 28, 2011 3:24 PM To:

WILLIAM.CROSS@fpl.com Cc:

Swenzinski, Laura; Fields, Leslie; Lain, Paul; Pickett, Douglas

Subject:

ME6818 - Duane Arnold adoption of NFPA-805 - Generic List of documents requested for the SharePoint Portal Attachments:

Generic List of Sharepoint Portal Documents.docx I am the Licensing Project Manager for Duane Arnold at the NRC. For the NFPA-805 adoption amendment application, Laura provided your name as the primary point of contact (POC) for the SharePoint Portal. Your NRC SharePoint primary POC is Leslie Fields (see Cc, her telephone number is 410-415-1186).

Our NFPA-805 project team (via message from Leslie) asked me to convey to you a generic list (generic in the sense that the items have generally descriptive names, but are applicable to DAEC) of documents that need to be available on the SharePoint Portal.

Our reviewers presently are organizing for your effort. My current guidance is to ask for deployment of the documents early next week. From Doug I know that you are following this effort closely.

I/Leslie would need to know if any of the requested items are long lead relative to your acquisition and deployment to the Portal, and if deployment is phased, the timeline you anticipate to completely implement document availability.

Besides Laura, I Ccd other key project personnel from the NRC for the NFPA-805 adoption. Please reply all, which will ensure that your address is acquired on Outlook by the other NRC people on Cc.

I left a brief message on your phone to introduce myself. Please call with any questions.

Karl Feintuch 301-415-3079 (forwards to cell phone)

Hearing Identifier:

NRR_PMDA Email Number:

188 Mail Envelope Properties (Karl.Feintuch@nrc.gov20111028152300)

Subject:

ME6818 - Duane Arnold adoption of NFPA-805 - Generic List of documents requested for the SharePoint Portal Sent Date:

10/28/2011 3:23:31 PM Received Date:

10/28/2011 3:23:00 PM From:

Feintuch, Karl Created By:

Karl.Feintuch@nrc.gov Recipients:

"Swenzinski, Laura" <Laura.Swenzinski@nexteraenergy.com>

Tracking Status: None "Fields, Leslie" <Leslie.Fields@nrc.gov>

Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>

Tracking Status: None "Pickett, Douglas" <Douglas.Pickett@nrc.gov>

Tracking Status: None "WILLIAM.CROSS@fpl.com" <WILLIAM.CROSS@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1420 10/28/2011 3:23:00 PM Generic List of Sharepoint Portal Documents.docx 29482 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Generic List of Sharepoint Portal Documents 2011-10-2712:26 ET-DAEC Page 1

1. NFPA Code Deviations and Justifications
2. All applicable PRA Peer Review Reports
3. All site calculations reference in the LAR
4. Credited Fire Protection (FP) System and Feature Drawings
a. Layout Drawings: fire barriers, installed fire detection and suppression systems, fire areas, fire zones, stairwells, fire doors, fire dampers, etc.
b. P&IDs: FP Water System Piping and Instrumentation Diagrams
c. System Descriptions for Fire Suppression, Water Supply, and Detection (including incipient or VEWFS detection).
d. Hydraulic Calculations for Fire Service and Fire Suppression System Water Demand (if used to support non-fire water use in (c)(2)(vii))
5. Drawings related to systems credited in the Nuclear Safety Capability Assessment (NSCA) as well as those required to fully understand plant response:
a. P&IDs: Reactor Coolant System, Main Steam, Main Feedwater, Circulating Water, Service Water, etc.
b. Safe Shutdown/NSCA Logic Diagrams (if used)
c. Electrical Distribution System One-Lines (AC and DC)
6. Those documents that fulfill the NFPA 805 requirement for Design Basis Document
a. Fire Area Calculations (e.g. Fire Safety Analyses, Fire Risk Analyses, Plant Change Evaluations, Fire Risk Evaluations, etc.)
b. NSCA Calculation (Safe Shutdown/Circuit Analysis)
c. MSO Expert Panel Report
d. Thermo-Hydraulic Analysis serving as the basis for VFDR and recovery action timing
e. Evaluation of Recovery Actions for feasibility
f.

Fire Hazards Analysis (if separate from the fire area calculations)

g. Non-Power Operation Calculation(s)
h. Radioactive Release Calculation(s)
i.

Pre-Fire Plans

7. Fire PRA Calculations
a.

Plant Boundary/Partitioning Methods and Results (TASK 1)

b.

Component Selection Calculation (TASK 2)

c.

Cable Selection and Circuit Analysis (TASK 3, 9, and 10)

d.

Ignition Frequency Calculation (TASK 6)

Generic List of Sharepoint Portal Documents 2011-10-2712:26 ET-DAEC Page 2

e.

Fire PRA Quantification Calculations (TASK 5) including:

i. Seismic Fire Interactions (TASK 13) Methodologies and results (including assumptions) ii. Screening Methodologies and Results (TASK 4 and 7) (including assumptions) iii. Fire Risk Quantifications (TASK 14) Methodologies and Rresults (including assumptions) iv.Multi-Compartment Screening and Analysis
v. Post-Fire HRA Analysis Methodologies and Results (including assumptions) (TASK 12) vi. Detailed proposed modification descriptions (Engineering Change Requests/ Records) sufficient to comprehend potential impact/improvement to Fire PRA
f.

NFPA 805 Application Calculation (provides all the delta risk calculations for VFDRs)

g.

Control Room Risk Calculation

h.

Uncertainty and Sensitivity Calculations (TASK 15)

i.

Fire Modeling Calculations used to support the Fire PRA (zone of influence (ZOI), hot gas layer, bounding, detailed fire modeling, etc.)

i.

Plant Specific V&V Analysis ii.

Non-Public V&V References (e.g.; EPRI Fire Modeling, Generic Treatment) iii.

Fire Modeling Assumptions and Calculations performed to support target selection (e.g.; ZOI, secondary fires, transient combustible/ignition sources) including those that deviate from NUREG/CR-6850. (TASKS 8 and 11)

8.

Fire Modeling used in the Fire Modeling Performance-Based Approach

a.

Plant Specific V&V Analysis performed

b.

Non-Public V&V References (e.g.; EPRI Fire Modeling, Generic Treatments)

c.

Fire Modeling Assumptions and Calculations performed to support Performance-Based Evaluations (e.g.; ZOI, secondary fires, transient combustible/ignition sources) considered outside NUREG/CR 6850 Assumptions and Parameters (TASKS 8 and 11)

d.

Hot Gas Layer Determination Calculations (including Assumptions)

9.

Fire Protection Program Manual

10.

Fire Protection Quality Assurance (QA) Program (including FP SSCs and FP Features)

11.

NFPA 805 Monitoring Program Calculations and Procedures

12.

Technical Requirements Manual

13.

UFSAR Changes (including current UFSAR 9.5.1 Fire Protection and Section 7.4 Alternate Shutdown / Instrumentation)