Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML1017602192010-06-22022 June 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 1 Project stage: Request ML1026401142010-09-16016 September 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030906022010-11-0404 November 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 5 Project stage: Request ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions Project stage: Request L-2011-312, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal2011-08-0505 August 2011 Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal Project stage: Request NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-08-0505 August 2011 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11277A2852011-10-0303 October 2011 NRR E-mail Capture - FW: ME6818 - NFPA 805 Adoption Acceptance Review RAIs and Clarification Conference Call of 9/30/2011 Project stage: RAI NG-11-0384, Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-10-14014 October 2011 Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11304A1242011-10-27027 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold - LIC-109 Acceptance Review Results - Transition to 10 CFR 50.48(c) - Adoption of NFPA 805 Performance-Based Fire Protection Standard Project stage: Acceptance Review ML11304A1482011-10-28028 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold Adoption of NFPA-805 - Generic List of Documents Requested for the Sharepoint Portal Project stage: Other ML11334A1502011-11-30030 November 2011 NRR E-mail Capture - ME6818 - DAEC NFPA-805 Adoption - Pre-Audit Discussion - 29 Nov 2011 Conference Call Project stage: Other ML12031A1122012-01-31031 January 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Afpb, Ihpb, Apla Request for Additional Information (RAI) Project stage: RAI 05000331/LER-2012-001, Regarding Inoperability of Low Pressure Coolant Injection Due to Discharge Line Voiding2012-01-31031 January 2012 Regarding Inoperability of Low Pressure Coolant Injection Due to Discharge Line Voiding Project stage: Request ML12058A5702012-02-24024 February 2012 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Project stage: RAI ML12058A5722012-02-27027 February 2012 NRR E-mail Capture - ME6818 - Clarification Conference Call of 2/22/2012 - Licensee and NRC Attendance - Supplemental Record Project stage: Approval ML12079A2322012-03-19019 March 2012 NRR E-mail Capture - ME6818 DAEC 60/90 Day Matrix - RAI Processing Identifier Syntax Project stage: RAI NG-12-0177, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants2012-04-23023 April 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants Project stage: Response to RAI ML12115A0782012-04-24024 April 2012 NRR E-mail Capture - FW: ACRS July 2012 NFPA-805 Subcommittee Meeting - Invitation for DAEC Participation Project stage: Meeting ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 Project stage: Request ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 Project stage: Other NG-12-0225, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-05-23023 May 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML12284A0212012-10-0808 October 2012 NRR E-mail Capture - ME6818 Duane Arnold NFPA-805 - Second Audit Visit Questions (Retrieved Copy) Project stage: Other NG-12-0419, Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-10-15015 October 2012 Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML12304A0692012-10-26026 October 2012 NRR E-mail Capture - ME6818, Additional RAIs for Duane Arnold Energy Center, LAR to Adopt NFPA 805 Project stage: RAI ML12318A3942012-11-0808 November 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Record of RAI Clarification Conference Call Conducted on 11/08/2012 Project stage: RAI ML12340A4502012-12-0505 December 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA 805 - Request for Additional Information (RAI) Items - Round 2 (More) Project stage: RAI ML12355A0722012-12-19019 December 2012 NRR E-mail Capture - FW: ME6818 - DAEC NFPA-805 Adoption - Record of Revisions to RAI Items, Expected Response Schedule, Participants List for Meetings on 17-18 December 2012 Project stage: RAI ML12361A0192012-12-23023 December 2012 NRR E-mail Capture - Supplement to ML12355A072 (RAI Issed as an Email on 12/19/2012, at 4:08 PM ET) Project stage: RAI NG-12-0502, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-01-11011 January 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0056, Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-02-12012 February 2013 Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0102, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-03-0606 March 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13070A0352013-03-0808 March 2013 NRR E-mail Capture - ME6818 - DA - NFPA-805 Adoption - Request for Portal Locations to Selected RAI Responses Project stage: RAI ML13084A0042013-03-22022 March 2013 NRR E-mail Capture - ME6818 DAEC Adoption of NFPA-805 - Request for Additional Information Project stage: RAI ML13098B0722013-04-0707 April 2013 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Request for Additional Information (Revised) Project stage: RAI ML13119A2202013-04-26026 April 2013 NRR E-mail Capture - FW: ME6818-DAEC-Adoption of NFPA-805- RAI Dated 4/7/2013 - Record of Clarification Call of April 11, 2013 Project stage: RAI NG-13-0182, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-0101 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13129A0742013-05-0808 May 2013 NRR E-mail Capture - ME6818 - DAEC - Adoption of NFPA 805 - Request for Additional Information (RAI) Project stage: RAI NG-13-0240, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-29029 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI NG-13-0281, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0287, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13210A4582013-07-30030 July 2013 Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Other NG-13-0318, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants2013-08-0505 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants Project stage: Request NG-13-0341, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-08-28028 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML13210A4492013-09-10010 September 2013 Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) Project stage: Approval 2012-03-19
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 30, 2013 Mr. Richard L. Anderson Vice President NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - REVISED LICENSE CONDITION FOR THE LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" (TAC NO. ME6818)
Dear Mr. Anderson:
By letter dated August 5,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11221A280), as supplemented by letters dated October 14,2011, April 23, 2012, May 23, 2012, July 9, 2012, October 15, 2012, January 11, 2013, February 12, 2013, March 6, 2013, May 1, 2013, May 29, 2013, and July 2, 2013, NextEra Energy Duane Arnold, LLC submitted an application for a license amendment to transition the Duane Arnold Energy Center (DAEC) fire protection program from Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48(b), to 10 CFR 50.48(c), National Fire Protection Association Standard (NFPA) 805, "Performance-Based Standard for Fire Protection For Light Water Reactor Electric Generating Plants," 2001 Edition.
The proposed amendment would transition the DAEC fire protection program to a performance-based, risk-informed program based on NFPA 805, in accordance with 10 CFR 50.48(c). NFPA 805 allows the use of performance-based methods such as fire modeling and risk-informed methods such as fire probabilistic risk assessment to demonstrate compliance with the nuclear safety performance criteria.
The U.S. Nuclear Regulatory Commission (NRC) staff is nearing completion of its review of the DAEC license amendment request to transition to NFPA 805. However, during the course of the staff's evaluation of this request, subsequent conversations with members of the DAEC staff, and incorporation of lessons learned during the NFPA 805 pilot process into the associated guidance documents, several clarifying changes have been made to the proposed license condition provided in the original submittal.
Accordingly, the enclosure to this letter contains the revised fire protection license condition, with the specificities added to clarify and expand on the originally submitted language, which have already been discussed with members of the DAEC staff during a conference call on July 29, 2013. Incorporation of this information has been found acceptable by the staff as a means of meeting the guidance and requirements associated with NFPA 805.
R. Anderson
- 2 The NRC staff requests that you review the information contained in the enclosure for accuracy, and provide assurance via a formal letter to the NRC Document Control Desk that DAEC is prepared to implement the fire protection license condition as stated within the timeframe specified, as well as, prepare the needed clean-typed license page.
Please contact Carolyn Farra at 301-415-4050 if you have any questions regarding this issue.
Sincerely, Karl D. Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
As stated cc w/enclosure: Distribution via ListServ
REVISED FIRE PROTECTION LICENSE CONDITION RELATED TO THE DUANE ARNOLD ENERGY CENTER LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805), "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-331 The following license condition will be included in the revised license for the Duane Arnold Energy Center and will replace Renewed Operating License No. DPR-49 Condition 2 and 3 (note: the date of implementation will be filled in upon issuance of the U.S. Nuclear Regulatory Commission (NRC) safety evaluation):
(2) The licensee shall implement the modifications to its facility, as described in, Attachment S, Table S-1, "Plant Modifications Committed," of DAEC letter NG-13-0287, dated July 2,2013, to complete the transition to full compliance with 10 CFR 50.48(c) by December 31,2014. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
(3) The licensee shall implement the items listed in Enclosure 2, Attachment S, Table S-2, "Implementation Items," of DAEC letter NG-13-0287, dated July 2, 2013, by
,2014.
-2 requests that you review information contained in the and provide assurance via a formal letter Document Control Desk to implement the fire protection condition as stated within the
, as well as, prepare the needed (,.:In._H/"",n license page.
contact Carolyn Faria at 301-41 if you have any questions regarding IRA!
Project Manager Licensing Branch 111-1 of Operating Reactor of Reactor Regulation
......,..".,,\\ No. 50-331 As stated cc w/enclosure: Distribution via ListServ RidsAcrsAcnw MailCTR RidsNrrDorlDpr Resource Resource RidsNrrPMDuaneArnold Resource Resource RldsOgcMailCenter RidsRgn3MailCenter Resource ADAMS Accession No.: ML13210A458
-1/PM lPl3-1/PM KFeintuch 07/29113 lPl3-1/PM KFeintuch