ML12058A570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12058A570
| number = ML12058A570
| issue date = 02/24/2012
| issue date = 02/24/2012
| title = ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
| title = NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
| author name = Feintuch K
| author name = Feintuch K
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:Feintuch, Karl Sent: Friday, February 24, 2012 4:13 PM To: Fields, Leslie; Lain, Paul
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Feintuch, Karl Sent:                     Friday, February 24, 2012 4:13 PM To:                       Fields, Leslie; Lain, Paul


==Subject:==
==Subject:==
ME6818 record of Duane Arnold RAI Clarific ation Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).  
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).
 
Attending the 2/22/2012 call for the NRC were:
Attending the 2/22/2012 call for the NRC were: Name                         NRC/NRR affiliation Karl Feintuch               DORL/LPL3-1 Alayna Pearson          DRA/AFPB Dan O'Neal                            DRA/APLA  
Name                   NRC/NRR affiliation Karl Feintuch           DORL/LPL3-1 Alayna Pearson          DRA/AFPB Dan ONeal                      DRA/APLA Stephen Dinsmore       DRA/APLA Jay Robinson           DRA/AFPB Paul Lain                       DRA/AFPB Harry Barrett                   DRA/AFPB Bernard Litkett                 DRA/AFPB Duane Arnold will provide a corresponding list of its attendees.
 
The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC responses.
Stephen Dinsmore     DRA/APLA Jay Robinson             DRA/AFPB Paul Lain                                 DRA/AFPB Harry Barrett                           DRA/AFPB Bernard Litkett                       DRA/AFPB  
 
Duane Arnold will provide a corresponding list of its attendees.
The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC  
 
responses.
 
The NRC staff clarified:
The NRC staff clarified:
Fire Protection RAI 9 PRA RAI 2                 PRA RAI 3                 PRA RAI 12 PRA RAI 36               PRA RAI 60  
Fire Protection RAI 9 PRA RAI 2               PRA RAI 3               PRA RAI 12 PRA RAI 36             PRA RAI 60 Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60 are in both the lists above and below.
Monitoring Program RAI 1 Safe Shutdown Analysis RAI 6            Safe Shutdown Analysis RAI 7 PRA RAI 6              PRA RAI 12              PRA RAI 28 PRA RAI 35              PRA RAI 38              PRA RAI 43 PRA RAI 50              PRA RAI 60              PRA RAI 61 Fire Modeling RAI 1                      Fire Modeling RAI 2 Radioactive Release RAI 1              Radioactive Release RAI 2 Radioactive Release RAI 3 Fire Protection RAI 9 In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.
Karl Feintuch 1


Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60  are in both the lists above and below. 
USNRC 301-415-3079 2


Monitoring Program RAI 1
Hearing Identifier:       NRR_PMDA Email Number:             274 Mail Envelope Properties       (Karl.Feintuch@nrc.gov20120224161300)
 
Safe Shutdown Analysis RAI 6          Safe Shutdown Analysis RAI 7 PRA RAI 6                  PRA RAI 12                PRA RAI 28                PRA RAI 35                PRA RAI 38                PRA RAI 43 PRA RAI 50                PRA RAI 60                PRA RAI 61 Fire Modeling RAI 1                            Fire Modeling RAI 2 Radioactive Release RAI 1                Radioactive Release RAI 2               
 
Radioactive Release RAI 3 Fire Protection RAI 9
 
In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.
 
Karl Feintuch 2USNRC 301-415-3079
 
Hearing Identifier: NRR_PMDA Email Number: 274   Mail Envelope Properties   (Karl.Feintuch@nrc.gov20120224161300)


==Subject:==
==Subject:==
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date:   2/24/2012 4:13:03 PM Received Date: 2/24/2012 4:13:00 PM From:   Feintuch, Karl Created By:   Karl.Feintuch@nrc.gov Recipients:     "Fields, Leslie" <Leslie.Fields@nrc.gov> Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2515     2/24/2012 4:13:00 PM
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date:               2/24/2012 4:13:03 PM Received Date:           2/24/2012 4:13:00 PM From:                     Feintuch, Karl Created By:               Karl.Feintuch@nrc.gov Recipients:
 
"Fields, Leslie" <Leslie.Fields@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>
Tracking Status: None Post Office:
Files                             Size                   Date & Time MESSAGE                           2515                   2/24/2012 4:13:00 PM Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:34, 5 December 2019

NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
ML12058A570
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/24/2012
From: Feintuch K
Plant Licensing Branch III
To: Leslie Fields, Laine P
Office of Nuclear Reactor Regulation
References
TAC ME6818
Download: ML12058A570 (3)


Text

NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Friday, February 24, 2012 4:13 PM To: Fields, Leslie; Lain, Paul

Subject:

ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).

Attending the 2/22/2012 call for the NRC were:

Name NRC/NRR affiliation Karl Feintuch DORL/LPL3-1 Alayna Pearson DRA/AFPB Dan ONeal DRA/APLA Stephen Dinsmore DRA/APLA Jay Robinson DRA/AFPB Paul Lain DRA/AFPB Harry Barrett DRA/AFPB Bernard Litkett DRA/AFPB Duane Arnold will provide a corresponding list of its attendees.

The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC responses.

The NRC staff clarified:

Fire Protection RAI 9 PRA RAI 2 PRA RAI 3 PRA RAI 12 PRA RAI 36 PRA RAI 60 Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60 are in both the lists above and below.

Monitoring Program RAI 1 Safe Shutdown Analysis RAI 6 Safe Shutdown Analysis RAI 7 PRA RAI 6 PRA RAI 12 PRA RAI 28 PRA RAI 35 PRA RAI 38 PRA RAI 43 PRA RAI 50 PRA RAI 60 PRA RAI 61 Fire Modeling RAI 1 Fire Modeling RAI 2 Radioactive Release RAI 1 Radioactive Release RAI 2 Radioactive Release RAI 3 Fire Protection RAI 9 In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.

Karl Feintuch 1

USNRC 301-415-3079 2

Hearing Identifier: NRR_PMDA Email Number: 274 Mail Envelope Properties (Karl.Feintuch@nrc.gov20120224161300)

Subject:

ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date: 2/24/2012 4:13:03 PM Received Date: 2/24/2012 4:13:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:

"Fields, Leslie" <Leslie.Fields@nrc.gov>

Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2515 2/24/2012 4:13:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: