| | number = ML14057A713 | | | number = ML14057A713 |
| | issue date = 02/14/2014 | | | issue date = 02/14/2014 |
| | title = 2014/02/26 NRR E-mail Capture - Constellation License Transfer Tq RAI Responses (MF2584-88) | | | title = NRR E-mail Capture - Constellation License Transfer Tq RAI Responses (MF2584-88) |
| | author name = Tyler E M | | | author name = Tyler E |
| | author affiliation = Constellation Energy Nuclear Group, LLC | | | author affiliation = Constellation Energy Nuclear Group, LLC |
| | addressee name = Morgan N S | | | addressee name = Morgan N |
| | addressee affiliation = NRC/NRR/DORL | | | addressee affiliation = NRC/NRR/DORL |
| | docket = 05000220, 05000244, 05000317, 05000318, 05000410 | | | docket = 05000220, 05000244, 05000317, 05000318, 05000410 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Morgan, Nadiyah Sent: Wednesday, February 26, 2014 2:19 PM To: NRR-PMDA-ECapture Resource Cc: Lee, Erika | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Morgan, Nadiyah Sent: Wednesday, February 26, 2014 2:19 PM To: NRR-PMDA-ECapture Resource Cc: Lee, Erika |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Constellation License Transfer TQ RAI and Responses (MF2584-88) | | Constellation License Transfer TQ RAI and Responses (MF2584-88) |
| Attachments: | | Attachments: License Transfer Response.docx; Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 1 |
| License Transfer Response.docx; Technical Qua lifications RAI re: Constellation License Transfer (MF2584-88) | |
|
| |
|
| Hearing Identifier: NRR_PMDA Email Number: 1117 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF7E8A72827) | | Hearing Identifier: NRR_PMDA Email Number: 1117 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF7E8A72827) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Constellation License Transfer TQ RAI and Responses (MF2584-88) Sent Date: 2/26/2014 2:19:20 PM Received Date: 2/26/2014 2:19:21 PM From: Morgan, Nadiyah Created By: Nadiyah.Morgan@nrc.gov Recipients: "Lee, Erika" <Erika.Lee@nrc.gov> | | Constellation License Transfer TQ RAI and Responses (MF2584-88) |
| Tracking Status: None "NRR-PMDA-ECapture Resource" <NRR-PMDA-ECapture.Resource@nrc.gov> Tracking Status: None Post Office: HQCLSTR02.nrc.gov | | Sent Date: 2/26/2014 2:19:20 PM Received Date: 2/26/2014 2:19:21 PM From: Morgan, Nadiyah Created By: Nadiyah.Morgan@nrc.gov Recipients: |
| | "Lee, Erika" <Erika.Lee@nrc.gov> |
| | Tracking Status: None "NRR-PMDA-ECapture Resource" <NRR-PMDA-ECapture.Resource@nrc.gov> |
| | Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 4 2/26/2014 2:19:21 PM License Transfer Response.docx 40966 Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 8214 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
| | |
| | 1. |
| | With the proposed license transfer of the Facilities, the CENG entities will contract Exelon Generation to operate the Facilities under a Nuclear Operating Services Agreement (NOSA). The CENG entity will remain the owner of the Facilities but will not have a functioning organization or staff. The current CENG corporate organization is planned to be absorbed into the Exelon Generation nuclear corporate organization. The Exelon Generation nuclear corporate organization consists of senior executives and support staff responsible for governance and oversight of the existing Exelon fleet. The organization includes Nuclear Oversight, Licensing and Regulatory Affairs, Engineering, Fuels, Outage Services and functional area managers in all the areas of plant operations. In addition, administrative and support functional leaders reside in the nuclear corporate organization, such as human resources, communications, IT, finance and procurement. |
| | The Exelon Generation nuclear organization is governed by a Management Model based upon an overriding philosophy of an engaged management team that establishes and enforces high standards and clear accountabilities. The Management Model involves: disciplined processes to assure day-to-day safety and operating rigor; standard templates for outage planning, preparation and execution; consistent performance reporting, monitoring and metrics; effective human performance tools; and appropriate financial controls. The CENG Facilities will transition to the Management Model after the proposed transfers. The nuclear corporate support technical functions that currently provide the governance and oversight in the existing Exelon fleet will provide same to the CENG Facilities. |
| | 2. |
| | The plant staff at the Facilities will remain essentially unchanged as a result of the license transfers, including senior managers and key operational and technical staff. The site organizations will be transitioned to the Exelon Nuclear Management Model organization structure, which supports achieving and sustaining high levels of performance and safety. The transition will involve adaption of processes, programs and policies of the Exelon Nuclear Management Model and the alignment of the staff to support their safe and efficient execution. Except for realignment of administrative and support functions (such as IT, procurement and finance) to offsite corporate functional departments, the lines of authority and communication for site operations and technical staff will remain the same, reporting up through the Site Vice President. The Site Vice Presidents of each of the CENG-owned sites will continue to report to the CENG Chief Nuclear Officer (CNO), who will also be an executive of Exelon Generation after the license transfers. |
| | The CENG CNO will report up through the Exelon Generation Chief Nuclear Officer. The Exelon Generation CNO will be the senior corporate officer with all the necessary authority and full responsibility for the safe and reliable operation of the Exelon Generation nuclear fleet, including the CENG-owned sites. Exelon Generation will interface with EDF through CENG Board interactions. |
| | These interactions will primarily be a function of the senior executives who will hold dual officer positions in Exelon and CENG, including the CENG Chief Executive Officer, Chief Nuclear Officer, Chief Financial Officer, Secretary and Treasurer. The Exelon Generation staff organization(s) responsible for the technical support/plant staff day-to-day operation and maintenance of the Facilities will have minimal interaction with EDF, i.e., EDF will not ordinarily interface with the onsite operating organization. |
|
| |
|
| Files Size Date & Time MESSAGE 4 2/26/2014 2:19:21 PM License Transfer Response.docx 40966 Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 8214 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
| | SVP Exelon Generation President & CNO Exelon Nuclear SVP Operations CENG CNO Plant Manager, Site VP, Site VP, Site VP, Operations Calvert Cliffs R.E. Ginna Nine Mile Point}} |
| : 1. With the proposed license transfer of the Facilities, the CENG entities will contract Exelon Generation to operate the Facilities under a Nuclear Operating Services Agreement (NOSA). The CENG entity will remain the owner of the Facilities but will not have a functioning organization or staff. The current CENG corporate organization is planned to be absorbed into the Exelon Generation nuclear corporate organization. The Exelon Generation nuclear corpor ate organization consists of senior executives and support staff responsible for governance and oversight of the existing Exelon fleet. The organization includes Nuclear Oversight, Licensing and Regulatory A ffairs, Engineering, Fuels, Outage Services and functional area managers in all the areas of plant operations. In addition, administrative and support functional leaders reside in the nuclear corporate organization, such as human resources, communications, IT, finance and procurement. The Exelon Generation nuclear organization is governed by a Management Model based upon an overriding philosophy of an engaged management team that establishes and enforces high standards and clear accountabilities. The Management Model involves: disciplined processes to assure day-to-day safety and operating rigor; standard templates for outage planning, preparation and execution; consistent performance reporting, monitoring and metrics; effective human performance tools; and appropriate financial controls. The CENG Facilities will transition to the Management Model after the proposed transfers. The nuclear corporate support technical functions that currently provide the governance and oversight in the existing Exelon fleet will provide same to the CENG Facilities. 2.
| |
| The plant staff at the Facilities will remain essentially unchanged as a result of the license transfers, including senior managers and key operational and technical staff. The site organizations will be transitioned to the Exelon Nuclear Management Model organization structure, which supports achieving and sustaining high levels of performance and safety.
| |
| The transition will involve adaption of processes, programs and policies of the Exelon Nuclear Management Model and the alignment of the staff to support their safe and efficient execution. Except for realignment of administrative and support functions (such as IT, procurement and finance) to offsite corporate functional departments, the lines of authority and communication for site operations and technical staff will remain the same, reporting up through the Site Vice President. The Site Vice Presidents of each of the CENG-owned sites will continue to report to the CENG Chief Nuclear Officer (CNO), who will also be an executive of Exelon Generation after the license transfers. The CENG CNO will report up through the Exelon Generation Chief Nuclear Officer. The Exelon Generation CNO will be the senior corporate officer with all the necessary authority and full responsibility for the safe and reliable operation of the Exelon Generation nuclear fleet, including the CENG-owned sites. Exelon Generation will interf ace with EDF through CENG Board interactions. These interactions will primarily be a function of the senior executives who will hold dual officer positions in Exelon and CENG, including the CENG Chief Executive Officer, Chief Nuclear Officer, Chief Financial Officer, Secretary and Treasurer. The Exelon Generation staff organization(s) responsible for the technical support/plant staff day-to-day operation and maintenance of the Facilities will have minimal interaction with EDF, i.e., EDF will not ordinarily interface with the onsite operating organization.
| |
| SVP Operations CENG CNOPlant Manager,OperationsSite VP,Calvert CliffsSite VP, R.E. GinnaSite VP,Nine Mile PointSVP Exelon Generation President & CNO Exelon Nuclear}} | |
Letter Sequence Request |
---|
TAC:MF2584, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML1235500402012-12-17017 December 2012 ISFSI Decommissioning Funding Plan Project stage: Request ML13098A0842013-03-27027 March 2013 Decommissioning Funding Status Report Project stage: Request ML13141A4082013-05-0909 May 2013 Submittal of Corporate Restructuring Project stage: Request ML13232A1562013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2 Project stage: Request ML13232A1572013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 2 of 2 Project stage: Request ML13228A1862013-08-14014 August 2013 Supplement to Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Supplement ML13256A3642013-09-17017 September 2013 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant - Acceptance of Requested Licensing Action Regarding Direct License Transfer (TAC MF2584 - MF2588) Project stage: Acceptance Review ML13269A3122013-10-0202 October 2013 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant (TAC Nos. MF2584, MF2585, MF2586, M Project stage: Withholding Request Acceptance ML13294A0392013-11-0707 November 2013 Notice of Consideration of Approval of Transfer of Renewed Facility Operating Licenses and Conforming Amendments,.. Project stage: Other ML13337A3902013-12-0505 December 2013 Request for Additional Information Regarding Order Approving Direct Transfer of Renewed Facility Operating License and Conforming Amendments Project stage: RAI ML13360A2002013-12-17017 December 2013 Response to Nrc'S Request for Additional Information Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Request ML13294A0702013-12-18018 December 2013 Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses, and Conforming Amendments Containing SUNSI Project stage: Request ML14057A8492014-01-0909 January 2014 NRR E-mail Capture - January 09, 2014 - Report of the Nuclear Advisory Committee (MF2584-88) Project stage: Request ML14057A7132014-02-14014 February 2014 NRR E-mail Capture - Constellation License Transfer Tq RAI Responses (MF2584-88) Project stage: Request ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Request ML14063A1252014-03-24024 March 2014 Order Approving Direct Transfer of Licenses and Conforming Amendment, Independent Spent Fuel Storage Installation License, (Tacs. MF2584 and MF2585) Project stage: Other ML14078A6432014-03-24024 March 2014 MF2584-85 Calvert Cliffs Conforming Amendments Project stage: Other ML14078A6492014-03-24024 March 2014 Draft License Pgs Project stage: Draft Other ML14105A4722014-03-24024 March 2014 Order Approving Direct Transfer of Renewed Operating Licenses, Independent Spent Fuel Storage Installation License, and Conforming Amendments (TAC Nos. MF2584, MF2585, and L24780) Project stage: Other NRC-2013-0252, R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment2014-03-25025 March 2014 R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14078A5842014-03-25025 March 2014 Draft License Pgs Project stage: Draft Other ML14078A5782014-03-25025 March 2014 Conforming Amendment Page Project stage: Other ML14063A2112014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14106A1192014-03-25025 March 2014 R. E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14091A2972014-04-0101 April 2014 Issuance of Amendments to Conform the Renewed Facility Operating Licenses and Materials License to Reflect the Direct Transfer of Operating Authority (TAC Nos. MF2584, MF2585, and L24780) Project stage: Approval ML14091A3662014-04-0101 April 2014 Issuance of Amendment to Conform the Renewed Facility Operating License to Reflect the Direct Transfer of Operating Authority Project stage: Approval ML14105A1362014-05-0808 May 2014 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant Project stage: Withholding Request Acceptance ML14149A1112014-05-30030 May 2014 Correction Letter to the Direct Transfer of Operating Authority (Tac Nos. MF2584, MF2585 and MF2588) Project stage: Other 2013-08-06
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24312A1662024-11-0707 November 2024 Request for Additional Information (11/7/2024 E-mail) - LAR to Revise TSs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3 ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24240A1902024-08-12012 August 2024 E-mail (8/12/2024) from R. Reynolds (CEG) to R. Guzman (NRC) - Corrected TS Pages for LAR TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24213A2202024-07-31031 July 2024 Updated Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24197A0092024-07-15015 July 2024 Acceptance Review Determination for LAR to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24108A1352024-05-20020 May 2024 Email to Christian Williams Re Decision on the Exemption Request for Calvert Cliffs ML24108A1312024-05-15015 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Calvert Cliffs Exemption ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) NRC-2024-0085, Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request2024-05-0909 May 2024 Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24131A1212024-04-29029 April 2024 Email to State of MD Requesting Review of the EA for Calvert Cliffs Exemption Request ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation – R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Morgan, Nadiyah Sent: Wednesday, February 26, 2014 2:19 PM To: NRR-PMDA-ECapture Resource Cc: Lee, Erika
Subject:
Constellation License Transfer TQ RAI and Responses (MF2584-88)
Attachments: License Transfer Response.docx; Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 1
Hearing Identifier: NRR_PMDA Email Number: 1117 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF7E8A72827)
Subject:
Constellation License Transfer TQ RAI and Responses (MF2584-88)
Sent Date: 2/26/2014 2:19:20 PM Received Date: 2/26/2014 2:19:21 PM From: Morgan, Nadiyah Created By: Nadiyah.Morgan@nrc.gov Recipients:
"Lee, Erika" <Erika.Lee@nrc.gov>
Tracking Status: None "NRR-PMDA-ECapture Resource" <NRR-PMDA-ECapture.Resource@nrc.gov>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 4 2/26/2014 2:19:21 PM License Transfer Response.docx 40966 Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 8214 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
1.
With the proposed license transfer of the Facilities, the CENG entities will contract Exelon Generation to operate the Facilities under a Nuclear Operating Services Agreement (NOSA). The CENG entity will remain the owner of the Facilities but will not have a functioning organization or staff. The current CENG corporate organization is planned to be absorbed into the Exelon Generation nuclear corporate organization. The Exelon Generation nuclear corporate organization consists of senior executives and support staff responsible for governance and oversight of the existing Exelon fleet. The organization includes Nuclear Oversight, Licensing and Regulatory Affairs, Engineering, Fuels, Outage Services and functional area managers in all the areas of plant operations. In addition, administrative and support functional leaders reside in the nuclear corporate organization, such as human resources, communications, IT, finance and procurement.
The Exelon Generation nuclear organization is governed by a Management Model based upon an overriding philosophy of an engaged management team that establishes and enforces high standards and clear accountabilities. The Management Model involves: disciplined processes to assure day-to-day safety and operating rigor; standard templates for outage planning, preparation and execution; consistent performance reporting, monitoring and metrics; effective human performance tools; and appropriate financial controls. The CENG Facilities will transition to the Management Model after the proposed transfers. The nuclear corporate support technical functions that currently provide the governance and oversight in the existing Exelon fleet will provide same to the CENG Facilities.
2.
The plant staff at the Facilities will remain essentially unchanged as a result of the license transfers, including senior managers and key operational and technical staff. The site organizations will be transitioned to the Exelon Nuclear Management Model organization structure, which supports achieving and sustaining high levels of performance and safety. The transition will involve adaption of processes, programs and policies of the Exelon Nuclear Management Model and the alignment of the staff to support their safe and efficient execution. Except for realignment of administrative and support functions (such as IT, procurement and finance) to offsite corporate functional departments, the lines of authority and communication for site operations and technical staff will remain the same, reporting up through the Site Vice President. The Site Vice Presidents of each of the CENG-owned sites will continue to report to the CENG Chief Nuclear Officer (CNO), who will also be an executive of Exelon Generation after the license transfers.
The CENG CNO will report up through the Exelon Generation Chief Nuclear Officer. The Exelon Generation CNO will be the senior corporate officer with all the necessary authority and full responsibility for the safe and reliable operation of the Exelon Generation nuclear fleet, including the CENG-owned sites. Exelon Generation will interface with EDF through CENG Board interactions.
These interactions will primarily be a function of the senior executives who will hold dual officer positions in Exelon and CENG, including the CENG Chief Executive Officer, Chief Nuclear Officer, Chief Financial Officer, Secretary and Treasurer. The Exelon Generation staff organization(s) responsible for the technical support/plant staff day-to-day operation and maintenance of the Facilities will have minimal interaction with EDF, i.e., EDF will not ordinarily interface with the onsite operating organization.
SVP Exelon Generation President & CNO Exelon Nuclear SVP Operations CENG CNO Plant Manager, Site VP, Site VP, Site VP, Operations Calvert Cliffs R.E. Ginna Nine Mile Point