ML15114A042: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15114A042 | | number = ML15114A042 | ||
| issue date = 04/22/2015 | | issue date = 04/22/2015 | ||
| title = | | title = NRR E-mail Capture - Acceptance Review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827) | ||
| author name = Saba F | | author name = Saba F | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Schrull E | | addressee name = Schrull E, Williams G | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000259, 05000260 | | docket = 05000259, 05000260 | ||
Line 12: | Line 12: | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 3 | | page count = 3 | ||
| project = | |||
| stage = Acceptance Review | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, April 22, 2015 2:45 PM To: Schrull, Edward Dustin (edschrull@tva.gov); Williams, Gordon Robert (grwilliams1@tva.gov) | |||
Cc: Chernoff, Margaret | |||
==Subject:== | |||
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827) | |||
Importance: High Ed and Gordon, By letter dated March 9, 2015 (ML15111A396), Tennessee Valley Authority (the licensee, TVA) submitted a license amendment request (LAR) for Unit 1 of the Browns Ferry Nuclear Plant (BFN). The proposed LAR would revise the Technical Specification (TS) testing frequency for the surveillance requirement (SR) in TS 3.1.4, Control Rod Scram Times. The proposed change would be consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency, which was approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, would be changed from 120 days cumulative operation in MODE 1 to 200 days cumulative operation in MODE 1. | |||
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | |||
The NRC staff has reviewed TVAs application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. The licensee will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. | |||
: Thanks, Farideh Farideh E. Saba, P.E. | |||
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1 | |||
2 Hearing Identifier: NRR_PMDA Email Number: 2024 Mail Envelope Properties (Farideh.Saba@nrc.gov20150422144500) | |||
==Subject:== | |||
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827) | |||
Sent Date: 4/22/2015 2:45:06 PM Received Date: 4/22/2015 2:45:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: | |||
"Chernoff, Margaret" <Margaret.Chernoff@nrc.gov> | |||
Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov> | |||
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 2899 4/22/2015 2:45:00 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 00:15, 5 December 2019
ML15114A042 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 04/22/2015 |
From: | Farideh Saba Plant Licensing Branch II |
To: | Schrull E, Gerald Williams Tennessee Valley Authority |
References | |
Download: ML15114A042 (3) | |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, April 22, 2015 2:45 PM To: Schrull, Edward Dustin (edschrull@tva.gov); Williams, Gordon Robert (grwilliams1@tva.gov)
Cc: Chernoff, Margaret
Subject:
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827)
Importance: High Ed and Gordon, By letter dated March 9, 2015 (ML15111A396), Tennessee Valley Authority (the licensee, TVA) submitted a license amendment request (LAR) for Unit 1 of the Browns Ferry Nuclear Plant (BFN). The proposed LAR would revise the Technical Specification (TS) testing frequency for the surveillance requirement (SR) in TS 3.1.4, Control Rod Scram Times. The proposed change would be consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency, which was approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, would be changed from 120 days cumulative operation in MODE 1 to 200 days cumulative operation in MODE 1.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed TVAs application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. The licensee will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
- Thanks, Farideh Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1
2 Hearing Identifier: NRR_PMDA Email Number: 2024 Mail Envelope Properties (Farideh.Saba@nrc.gov20150422144500)
Subject:
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827)
Sent Date: 4/22/2015 2:45:06 PM Received Date: 4/22/2015 2:45:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Chernoff, Margaret" <Margaret.Chernoff@nrc.gov>
Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2899 4/22/2015 2:45:00 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: