ML15265A272: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML15265A272
| number = ML15265A272
| issue date = 09/22/2015
| issue date = 09/22/2015
| title = Acceptance Review (TAC Nos. MF6651-53)
| title = NRR E-mail Capture - Acceptance Review (TAC Nos. MF6651-53)
| author name = Lyon F
| author name = Lyon F
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lyon, Fred Sent: Tuesday, September 22, 2015 6:49 AM To: 'bhansher@oppd.com' Cc: 'medwards@oppd.com'; Burkhardt, Janet
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Lyon, Fred Sent:                       Tuesday, September 22, 2015 6:49 AM To:                         'bhansher@oppd.com' Cc:                         'medwards@oppd.com'; Burkhardt, Janet


==Subject:==
==Subject:==
Acceptance Review (TAC Nos. MF6651-53)By letter dated August 27, 2015, OPPD submitted relief requests G-1, P-1, and P-2 associated with the 5th IST interval.  
Acceptance Review (TAC Nos. MF6651-53)
By letter dated August 27, 2015, OPPD submitted relief requests G-1, P-1, and P-2 associated with the 5th IST interval.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
1


The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. 
Hearing Identifier:   NRR_PMDA Email Number:         2397 Mail Envelope Properties     (Fred.Lyon@nrc.gov20150922064900)
 
The NRC staff has reviewed your application and concluded t hat it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Hearing Identifier: NRR_PMDA Email Number: 2397   Mail Envelope Properties   (Fred.Lyon@nrc.gov20150922064900)


==Subject:==
==Subject:==
Acceptance Review (TAC Nos. MF6651-53) Sent Date:   9/22/2015 6:49:06 AM Received Date: 9/22/2015 6:49:00 AM From:   Lyon, Fred Created By:   Fred.Lyon@nrc.gov Recipients:     "'medwards@oppd.com'" <medwards@oppd.com>
Acceptance Review (TAC Nos. MF6651-53)
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov> Tracking Status: None "'bhansher@oppd.com'" <bhansher@oppd.com> Tracking Status: None  
Sent Date:             9/22/2015 6:49:06 AM Received Date:         9/22/2015 6:49:00 AM From:                 Lyon, Fred Created By:           Fred.Lyon@nrc.gov Recipients:
 
"'medwards@oppd.com'" <medwards@oppd.com>
Post Office:     Files     Size     Date & Time MESSAGE   1182     9/22/2015 6:49:00 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>
Tracking Status: None
"'bhansher@oppd.com'" <bhansher@oppd.com>
Tracking Status: None Post Office:
Files                           Size                 Date & Time MESSAGE                         1182                 9/22/2015 6:49:00 AM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 22:23, 4 December 2019

NRR E-mail Capture - Acceptance Review (TAC Nos. MF6651-53)
ML15265A272
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/22/2015
From: Lyon F
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
References
TAC MF6651, TAC MF6652, TAC MF6653
Download: ML15265A272 (2)


Text

NRR-PMDAPEm Resource From: Lyon, Fred Sent: Tuesday, September 22, 2015 6:49 AM To: 'bhansher@oppd.com' Cc: 'medwards@oppd.com'; Burkhardt, Janet

Subject:

Acceptance Review (TAC Nos. MF6651-53)

By letter dated August 27, 2015, OPPD submitted relief requests G-1, P-1, and P-2 associated with the 5th IST interval.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

1

Hearing Identifier: NRR_PMDA Email Number: 2397 Mail Envelope Properties (Fred.Lyon@nrc.gov20150922064900)

Subject:

Acceptance Review (TAC Nos. MF6651-53)

Sent Date: 9/22/2015 6:49:06 AM Received Date: 9/22/2015 6:49:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

"'medwards@oppd.com'" <medwards@oppd.com>

Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None

"'bhansher@oppd.com'" <bhansher@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1182 9/22/2015 6:49:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: