IR 05000424/2015301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML15239B452
| number = ML15331A267
| issue date = 08/26/2015
| issue date = 11/24/2015
| title = Vogtle Nuclear Plant - Operator Licensing Examination Approval 05000424/2015301 and 05000425/2015301
| title = NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS/OLB
| author affiliation = NRC/RGN-II/DRS
| addressee name = Stiles D C
| addressee name = Taber B
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
| license number = NPF-068, NPF-081
| license number = NPF-068, NPF-081
| contact person =  
| contact person =  
| document report number = IR 2015301
| document report number = 50-424/15-301, 50-425/15-301
| document type = Letter
| document type = Letter, License-Operator Examination Report
| page count = 3
| page count = 8
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 26, 2015 Southern Nuclear Operating Company, Inc.
{{#Wiki_filter:UNITED STATES ber 24, 2015


ATTN: Mr. Darren Training Manager Vogtle Electric Generating Plant
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2015301 AND 05000425/2015301


7821 River Road Bin 63030 Waynesboro, GA 30830-2965
==Dear Mr. Taber:==
During the period August 31 - September 4 and September 14 - 18, 2015, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating test and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on September 25, 2015.


SUBJECT: VOGTLE NUCLEAR POWER PLANT - OPERATOR LICENSING EXAMINATION APPROVAL 05000424/2015301 AND 05000425/2015301
All applicants passed both the operating test and written examination. There were no post-administration comments concerning the written examination or operating test. A Simulator Fidelity Report is included in Enclosure 2.


==Dear Mr. Stiles:==
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examination at the Vogtle Nuclear Power Plant.


The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable, the weeks of August 31, 2015, and September 14, 2015. Note that any examination waivers and applicati on denials have been addressed in separate correspondence.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662.


The NRC has approved the subject written examination and hereby authorizes you to
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-424, 50-425 License Nos: NPF-68, NPF-81


administer the written examination in accordance with Revision 10, Supplement 1, of NUREG-
===Enclosures:===
1021, "Operator Licensing Examination Standards for Power Reactors," the week of September 21, 2015.
1. Report Details 2. Simulator Fidelity Report


This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4662. Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642, if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (written examination) specified for each applicant on the list of approved applicants.
REGION II==
Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 Report No.: 05000424/2015301 and 05000425/2015301 Licensee: Southern Nuclear Operating Company, Inc.


Sincerely,/RA/
Facility: Vogtle Electric Generating Plant Units 1 and 2 Location: Waynesboro, GA 30830 Dates: Operating Test - August 31 - September - 4, 2015 and September 14 - 18, 2015 2015 Written Examination - September 25, 2015 Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer E. Lea, Regional Governmental Liaison Officer A. Goldau, Operations Engineer N. Lacy, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
Eugene F. Guthrie, Chief Operations Branch 2  


Division of Reactor Safety
SUMMARY ER 05000424/2015301, 05000425/2015301, Operating Test August 31 - September - 4, 2015 and September 14 - 18, 2015 & Written Exam September 25, 2015; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations. Nuclear Regulatory Commission (NRC)
examiners conducted an initial examination in accordance with the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41,
§55.43, and §55.45, as applicable. Members of the Vogtle Electric Generating Plant Units 1 and 2 staff developed both the operating test and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021. The NRC administered the operating test during the period of August 31 - September - 4, 2015 and September 14 - 18, 2015. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015. All applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.


Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
There were no post-examination comments.


ML15239B452  X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE RSB EFG NAME RBALDWIN EGUTHRIE DATE 8/25/2015 8/26/2015 E-MAIL COPY? YES NO YES NO
No findings were identified.
 
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC administered the operating test during the period August 31 - September - 4, 2015 and September 14 - 18, 2015. The NRC examiners evaluated nine Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015 to nine RO and seven SRO applicants. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate Vogtle Electric Generating Plant Units 1 and 2, met the requirements specified in 10 CFR Part 55, Operators Licenses.
 
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A)
statement. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
 
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
 
The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.
 
b. Findings No findings were identified.
 
The NRC developed the written examination sample plan outline. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff developed both the operating test and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 10, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
 
Using NUREG-1021, the NRC determined that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
 
Nine RO applicants and seven SRO applicants passed both the operating test and written examination. All applicants were issued licenses.
 
Copies of all individual examination reports were sent to the facility Training Director for evaluation of weaknesses and determination of appropriate remedial training. A copy of the final RO and SRO written examinations and answer keys may be accessed not earlier than September 25, 2017 in the ADAMS system (ADAMS Accession Numbers ML15300A490, ML15300A485).
 
4OA6 Meetings, Including Exit Exit Meeting Summary On September 18, 2015, the NRC examination team discussed generic issues associated with the operating test with Mr. Keith Tabor, Site - Vice President, and members of the Vogtle Electric Generating Plant Units 1 and 2 staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
 
KEY POINTS OF CONTACT Licensee personnel K. Tabor, Site - Vice President D. Myers, Plant Manager S. Briggs, Operations Director D. Stiles, Training Director M. Henson, Operations Training Director K. Jenkins, Examination Development Lead A. Lowe, Initial Licensed Training Lead K. Lewis, Licensed Operator Requalification Training Lead G. Gunn, Regulator Affairs Manager K. Morrow, Senior Engineer, Regulator Affairs
 
SIMULATOR FIDELITY REPORT Facility Licensee: Vogtle Nuclear Generating Plant, Unit Nos. 1 & 2 Facility Docket No.: 50-424, 50-425 Operating Test Administered: August 31 - September - 4, 2015 and September 14 - 18 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
 
While conducting the simulator portion of the operating test, examiners observed the following:
There were NO simulator fidelity issues identified.
 
Enclosure 2
}}
}}

Latest revision as of 20:56, 4 December 2019

NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301
ML15331A267
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/24/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Taber B
Southern Nuclear Operating Co
References
50-424/15-301, 50-425/15-301
Download: ML15331A267 (8)


Text

UNITED STATES ber 24, 2015

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2015301 AND 05000425/2015301

Dear Mr. Taber:

During the period August 31 - September 4 and September 14 - 18, 2015, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating test and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on September 25, 2015.

All applicants passed both the operating test and written examination. There were no post-administration comments concerning the written examination or operating test. A Simulator Fidelity Report is included in Enclosure 2.

The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-424, 50-425 License Nos: NPF-68, NPF-81

Enclosures:

1. Report Details 2. Simulator Fidelity Report

REGION II==

Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 Report No.: 05000424/2015301 and 05000425/2015301 Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Electric Generating Plant Units 1 and 2 Location: Waynesboro, GA 30830 Dates: Operating Test - August 31 - September - 4, 2015 and September 14 - 18, 2015 2015 Written Examination - September 25, 2015 Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer E. Lea, Regional Governmental Liaison Officer A. Goldau, Operations Engineer N. Lacy, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1

SUMMARY ER 05000424/2015301, 05000425/2015301, Operating Test August 31 - September - 4, 2015 and September 14 - 18, 2015 & Written Exam September 25, 2015; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations. Nuclear Regulatory Commission (NRC)

examiners conducted an initial examination in accordance with the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41,

§55.43, and §55.45, as applicable. Members of the Vogtle Electric Generating Plant Units 1 and 2 staff developed both the operating test and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021. The NRC administered the operating test during the period of August 31 - September - 4, 2015 and September 14 - 18, 2015. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015. All applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.

There were no post-examination comments.

No findings were identified.

REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC administered the operating test during the period August 31 - September - 4, 2015 and September 14 - 18, 2015. The NRC examiners evaluated nine Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015 to nine RO and seven SRO applicants. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate Vogtle Electric Generating Plant Units 1 and 2, met the requirements specified in 10 CFR Part 55, Operators Licenses.

The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A)

statement. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.

The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.

The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.

b. Findings No findings were identified.

The NRC developed the written examination sample plan outline. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff developed both the operating test and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 10, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.

Using NUREG-1021, the NRC determined that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.

Nine RO applicants and seven SRO applicants passed both the operating test and written examination. All applicants were issued licenses.

Copies of all individual examination reports were sent to the facility Training Director for evaluation of weaknesses and determination of appropriate remedial training. A copy of the final RO and SRO written examinations and answer keys may be accessed not earlier than September 25, 2017 in the ADAMS system (ADAMS Accession Numbers ML15300A490, ML15300A485).

4OA6 Meetings, Including Exit Exit Meeting Summary On September 18, 2015, the NRC examination team discussed generic issues associated with the operating test with Mr. Keith Tabor, Site - Vice President, and members of the Vogtle Electric Generating Plant Units 1 and 2 staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.

KEY POINTS OF CONTACT Licensee personnel K. Tabor, Site - Vice President D. Myers, Plant Manager S. Briggs, Operations Director D. Stiles, Training Director M. Henson, Operations Training Director K. Jenkins, Examination Development Lead A. Lowe, Initial Licensed Training Lead K. Lewis, Licensed Operator Requalification Training Lead G. Gunn, Regulator Affairs Manager K. Morrow, Senior Engineer, Regulator Affairs

SIMULATOR FIDELITY REPORT Facility Licensee: Vogtle Nuclear Generating Plant, Unit Nos. 1 & 2 Facility Docket No.: 50-424, 50-425 Operating Test Administered: August 31 - September - 4, 2015 and September 14 - 18 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

While conducting the simulator portion of the operating test, examiners observed the following:

There were NO simulator fidelity issues identified.

Enclosure 2