(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17135A032 | | | number = ML17135A032 |
| | issue date = 05/12/2017 | | | issue date = 05/12/2017 |
| | title = 2017/05/12 NRR E-mail Capture - Request for Additional Information - McGuire TSTF-197 | | | title = NRR E-mail Capture - Request for Additional Information - McGuire TSTF-197 |
| | author name = Mahoney M | | | author name = Mahoney M |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Mahoney, MichaelSent:Friday, May 12, 2017 9:07 AMTo:Art ZarembaCc:'Edwards, Nicole D' | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Mahoney, Michael Sent: Friday, May 12, 2017 9:07 AM To: Art Zaremba Cc: 'Edwards, Nicole D' |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Request for Additional Information - McGuire TSTF-197Art, By letter dated January 11, 2017 (Agencywide Documents Access Management System (ADAMS) Accession No. ML17025A069), Duke Energy (the licensee), submitted an application to revise McGuire Nuclear Station, Units 1 and 2 (MNS) Technical Specifications (TS) to adopt multiple Technical Specification Task Force (TSTF) Travelers, specifically TSTF-197-A, Revision 2, "Require containment closure when shutdown cooling requirements are not met," (CAC Nos. MF9110 and MF9111). | | Request for Additional Information - McGuire TSTF-197 |
| | : Art, By letter dated January 11, 2017 (Agencywide Documents Access Management System (ADAMS) Accession No. ML17025A069), Duke Energy (the licensee), submitted an application to revise McGuire Nuclear Station, Units 1 and 2 (MNS) Technical Specifications (TS) to adopt multiple Technical Specification Task Force (TSTF) Travelers, specifically TSTF-197-A, Revision 2, Require containment closure when shutdown cooling requirements are not met, (CAC Nos. MF9110 and MF9111). |
| | In order to complete its review, the U.S. Nuclear Regulatory Commission staff requests the following additional information. Please provide your response to the attached request for additional information within 30 days of the date of this correspondence. |
|
| |
|
| In order to complete its review, the U.S. Nuclear Regulatory Commission staff requests the following additional information. Please provide your response to the attached request for additional information within 30 days of the date of this correspondence. RAI-1 The Improved Standard TS markups for TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2, as included in TSTF-197-A for NUREG-1431, are proposed to read: "Verify each penetration is capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System." The LAR proposes the new MNS TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2 to deviate from the TSTF-197-A language, as follows: "Verify each penetration is capable of being closed on a high containment radiation signal." It is stated, in part, in your application, "MNS does not have a Containment Purge Exhaust Isolation System." However, section 9.4.5.2 of MNS's Updated Final Safety Analysis Report (USFAR) describes the "Containment Purge and Ventilation System."
| | ===RAI-1=== |
| | The Improved Standard TS markups for TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2, as included in TSTF-197-A for NUREG-1431, are proposed to read: Verify each penetration is capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System. The LAR proposes the new MNS TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2 to deviate from the TSTF-197-A language, as follows: Verify each penetration is capable of being closed on a high containment radiation signal. It is stated, in part, in your application, MNS does not have a Containment Purge Exhaust Isolation System. However, section 9.4.5.2 of MNSs Updated Final Safety Analysis Report (USFAR) describes the Containment Purge and Ventilation System. |
| | A. Explain why your application states that MNS does not have a Containment Purge and Exhaust System Isolation System when USFAR 9.4.5.2 suggests such a system exists. |
| | B. Does MNS have a system that performs the function of containment purge and exhaust isolation? |
| | C. If so, please explain why the proposed new MNS Required Actions A.6.2 and B.5.2 require verification that each penetration is capable of being closed on a high containment radiation signal, and not by the system that performs the function of containment purge and exhaust isolation. |
|
| |
|
| A. Explain why your application states that MNS does not have a Containment Purge and Exhaust System Isolation System when USFAR 9.4.5.2 suggests such a system exists. B. Does MNS have a system that performs the function of containment purge and exhaust isolation? C. If so, please explain why the proposed new MNS Required Actions A.6.2 and B.5.2 require verification that each penetration is capable of being closed on a high containment radiation signal, and not by the system that performs the function of containment purge and exhaust isolation. RAI-2 TS 3.9.5, Condition A, Required Action A.4 and TS 3.9.6, Condition B, Required Action B.3 are proposed to be revised. Part of the proposed changes are to add new Required Actions A.6.2 and B.5.2. Required Actions A.6.2 and B.5.2 are proposed to state, "Verify each penetration is capable of being closed on a high containment radiation signal," with a Completion Time of 4 hours. Further, according to the licensee, the containment high radiation monitor is addressed in Selected Licensee Commitment (SLC) 16.7.10, "Radiation Monitoring for Plant Operations", but not in TS.
| | ===RAI-2=== |
| | TS 3.9.5, Condition A, Required Action A.4 and TS 3.9.6, Condition B, Required Action B.3 are proposed to be revised. Part of the proposed changes are to add new Required Actions A.6.2 and B.5.2. Required Actions A.6.2 and B.5.2 are proposed to state, Verify each penetration is capable of being closed on a high containment radiation signal, with a Completion Time of 4 hours. Further, according to the licensee, the containment high radiation monitor is addressed in Selected Licensee Commitment (SLC) 16.7.10, Radiation Monitoring for Plant Operations, but not in TS. |
| | Once this email is added to ADAMS, I will provide you with the accession number for your reference. |
| | Mike 1 |
|
| |
|
| Once this email is added to ADAMS, I will provide you with the accession number for your reference. Mike 2Michael Mahoney McGuire and Catawba Project Manager, LPLII-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV Hearing Identifier: NRR_PMDA Email Number: 3510 Mail Envelope Properties (a689bad6017c49f088f07865951b5926)
| | Michael Mahoney McGuire and Catawba Project Manager, LPLII-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV 2 |
| | |
| | Hearing Identifier: NRR_PMDA Email Number: 3510 Mail Envelope Properties (a689bad6017c49f088f07865951b5926) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Request for Additional Information - McGuire TSTF-197 Sent Date: 5/12/2017 9:06:46 AM Received Date: 5/12/2017 9:06:47 AM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients: "'Edwards, Nicole D'" <Nicole.Edwards@duke-energy.com> | | Request for Additional Information - McGuire TSTF-197 Sent Date: 5/12/2017 9:06:46 AM Received Date: 5/12/2017 9:06:47 AM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients: |
| Tracking Status: None "Art Zaremba" <Arthur.Zaremba@duke-energy.com> Tracking Status: None Post Office: R4PWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3032 5/12/2017 9:06:47 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | "'Edwards, Nicole D'" <Nicole.Edwards@duke-energy.com> |
| | Tracking Status: None "Art Zaremba" <Arthur.Zaremba@duke-energy.com> |
| | Tracking Status: None Post Office: R4PWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3032 5/12/2017 9:06:47 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
|
---|
Category:E-Mail
MONTHYEARML24207A0862024-07-24024 July 2024 Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps ML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24033A2372024-02-0202 February 2024 Acceptance of Requested Licensing Action Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations (Epids L-2024-LLR-0002 and L-2024-LLR-0003) ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds ML22242A1602022-08-30030 August 2022 Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22049B0152022-02-17017 February 2022 NRC RP Inspection Document Request Letter ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22024A3952022-01-24024 January 2022 Acceptance of Requested Licensing Action Amendment McGuire RCS PT Limits Change TS 3.4.3 and EFPY Changes ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21195A2022021-07-14014 July 2021 NRR E-mail Capture - McGuire Relief Request Acceptance Review Results; McGuire Unit 1 RR, Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask ML21096A2512021-04-0505 April 2021 NRR E-mail Capture - McGuire Emergency Plan Submittal, Letter Dated March 31 2021 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20177A3792020-06-23023 June 2020 Email from L. Cox, North Carolina Department of Health and Human Services to NRC Regarding Exemption Request for Duke Energy'S McGuire Nuclear Station ML20140A0852020-05-19019 May 2020 ADAMS 2D ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information 2024-07-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information ML20071D0962020-03-0505 March 2020 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station Unit 1 Delay in Update of the Code of Record for in Service Inspections ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18352A8052018-12-18018 December 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - MRP-227 Review ML18306A9372018-11-0202 November 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Esps LAR ML18285A0812018-10-11011 October 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18138A4662018-05-18018 May 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR ML18088B2822018-03-29029 March 2018 Requalification Program Inspection - McGuire Nuclear Station ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17331B1492017-11-21021 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Nsws One-Time LAR (CACs MG0242 and MG0243, EPID L-2017-LLA-0299) ML17317B0932017-11-13013 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Irlt (CACs MF9020 and MF9021; EPID L-2016-LLA-0032) ML17230A1512017-08-15015 August 2017 Notification of Inspection of Inspection and Request for Information ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17135A0322017-05-12012 May 2017 NRR E-mail Capture - Request for Additional Information - McGuire TSTF-197 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information ML16302A1122016-11-0404 November 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (CAC Nos. MF2934 and MF2935) MNS-16-077, Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program2016-09-29029 September 2016 Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program ML16228A2612016-08-15015 August 2016 Email - McGuire Unit No. 1: Request for Additional Informati- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. ML16194A2862016-07-12012 July 2016 E-Mail - Mcguirai Ice Condenser Door Position Alternate Verification, (ML16089A228) CAC Nos. MF7526 and MF7527 ML16175A0222016-07-12012 July 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program ML16014A6882016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme ML15348A2602015-12-17017 December 2015 Request for Additional Information Regarding License Amendment Request to Use an Alternative Fission Gas Gap Release Fraction ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15289A5552015-10-26026 October 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension 2024-07-15
[Table view] |
Text
NRR-PMDAPEm Resource From: Mahoney, Michael Sent: Friday, May 12, 2017 9:07 AM To: Art Zaremba Cc: 'Edwards, Nicole D'
Subject:
Request for Additional Information - McGuire TSTF-197
- Art, By letter dated January 11, 2017 (Agencywide Documents Access Management System (ADAMS) Accession No. ML17025A069), Duke Energy (the licensee), submitted an application to revise McGuire Nuclear Station, Units 1 and 2 (MNS) Technical Specifications (TS) to adopt multiple Technical Specification Task Force (TSTF) Travelers, specifically TSTF-197-A, Revision 2, Require containment closure when shutdown cooling requirements are not met, (CAC Nos. MF9110 and MF9111).
In order to complete its review, the U.S. Nuclear Regulatory Commission staff requests the following additional information. Please provide your response to the attached request for additional information within 30 days of the date of this correspondence.
RAI-1
The Improved Standard TS markups for TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2, as included in TSTF-197-A for NUREG-1431, are proposed to read: Verify each penetration is capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System. The LAR proposes the new MNS TS 3.9.5 Required Action A.6.2 and TS 3.9.6 Required Action B.5.2 to deviate from the TSTF-197-A language, as follows: Verify each penetration is capable of being closed on a high containment radiation signal. It is stated, in part, in your application, MNS does not have a Containment Purge Exhaust Isolation System. However, section 9.4.5.2 of MNSs Updated Final Safety Analysis Report (USFAR) describes the Containment Purge and Ventilation System.
A. Explain why your application states that MNS does not have a Containment Purge and Exhaust System Isolation System when USFAR 9.4.5.2 suggests such a system exists.
B. Does MNS have a system that performs the function of containment purge and exhaust isolation?
C. If so, please explain why the proposed new MNS Required Actions A.6.2 and B.5.2 require verification that each penetration is capable of being closed on a high containment radiation signal, and not by the system that performs the function of containment purge and exhaust isolation.
RAI-2
TS 3.9.5, Condition A, Required Action A.4 and TS 3.9.6, Condition B, Required Action B.3 are proposed to be revised. Part of the proposed changes are to add new Required Actions A.6.2 and B.5.2. Required Actions A.6.2 and B.5.2 are proposed to state, Verify each penetration is capable of being closed on a high containment radiation signal, with a Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Further, according to the licensee, the containment high radiation monitor is addressed in Selected Licensee Commitment (SLC) 16.7.10, Radiation Monitoring for Plant Operations, but not in TS.
Once this email is added to ADAMS, I will provide you with the accession number for your reference.
Mike 1
Michael Mahoney McGuire and Catawba Project Manager, LPLII-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV 2
Hearing Identifier: NRR_PMDA Email Number: 3510 Mail Envelope Properties (a689bad6017c49f088f07865951b5926)
Subject:
Request for Additional Information - McGuire TSTF-197 Sent Date: 5/12/2017 9:06:46 AM Received Date: 5/12/2017 9:06:47 AM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:
"'Edwards, Nicole D'" <Nicole.Edwards@duke-energy.com>
Tracking Status: None "Art Zaremba" <Arthur.Zaremba@duke-energy.com>
Tracking Status: None Post Office: R4PWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3032 5/12/2017 9:06:47 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: