|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17270A366 | | | number = ML17270A366 |
| | issue date = 09/27/2017 | | | issue date = 09/27/2017 |
| | title = 2017/09/27 NRR E-mail Capture - State Consultation: Request for Comments on Amendment to Watts Bar Operating Licenses the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System (CAC MF9 | | | title = NRR E-mail Capture - State Consultation: Request for Comments on Amendment to Watts Bar Operating Licenses the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System |
| | author name = Saba F E | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Crosslin R | | | addressee name = Crosslin R |
Line 13: |
Line 13: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 4 | | | page count = 4 |
| | | project = CAC:MF9574 |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, September 27, 2017 12:13 PM To:Ruben Crosslin Cc: Anthony Hogan; Andrew Holcomb; Schaaf, Robert; Clayton, Beverly; Ronewicz, Lynn; Shoop, Undine | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, September 27, 2017 12:13 PM To: Ruben Crosslin Cc: Anthony Hogan; Andrew Holcomb; Schaaf, Robert; Clayton, Beverly; Ronewicz, Lynn; Shoop, Undine |
|
| |
|
| ==Subject:== | | ==Subject:== |
| State Consultation: Request for Comment s on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, "Design Vulnerability to Elec trical Power System" (CAC NO. MF9574) | | State Consultation: Request for Comments on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System (CAC NO. MF9574) |
| Attachments: | | Attachments: 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf Importance: High Mr. Crosslin, The NRC is finalizing license amendment for Watts Bar Nuclear Plant (Watts Bar), Unit 2. We are notifying you of the proposed issuance in accordance with 10 CFR 50.91(b), 10 CFR 50.91(b)(3) and (b)(4). The amendment revises the completion date for License Condition 2.C.(5) for Watts Bar, Unit 2, regarding completion of the actions to resolve the issues identified in Bulletin 2012-01, Design Vulnerability in Electrical Power System, from December 31, 2017, to December 31, 2018, to align with the remainder of TVA fleet and with the nuclear industry. |
| 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf Importance:High Mr. Crosslin, The NRC is finalizing license amendment for Watts Bar Nuclear Plant (Watts Bar), Unit 2. We are notifying you of the proposed issuance in accordance with 10 CFR 50.91(b), 10 CFR 50.91(b)(3) and (b)(4). The amendment revises the completion date for License Condition 2.C.(5) for Watts Bar, Unit 2, regarding completion of the actions to resolve the issues identified in Bulletin 2012-01, "Design Vulnerability in Electrical Power System," from December 31, 2017, to December 31, 2018, to align with the remainder of TVA fleet and | | The licensees submittal dated March 28, 2017, is available in ADAMS under Accession No. ML17093A608. |
| | The amendment was noticed in the Federal Register on July 5, 2017 (82 FR 31103). Please see the attachment to this email. No public comments were received. |
| | Please provide any comments regarding this license amendment to me by September 29, 2017. Please contact me by e-mail or at 301-415-1447, if you have any questions or comments. |
| | : Regards, Farideh Farideh E. Saba, P.E. |
| | Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8B01A Farideh.Saba@NRC.GOV 1 |
|
| |
|
| with the nuclear industry.
| | Hearing Identifier: NRR_PMDA Email Number: 3742 Mail Envelope Properties (b9c95af3b3154a16abefa1673a4525ee) |
| The licensee's submittal dated March 28, 2017, is available in ADAMS under Accession No. ML17093A608. The amendment was noticed in the Federal Register on July 5, 2017 (82 FR 31103). Please see the attachment to this email. No public comments were received.
| |
| | |
| Please provide any comments regarding this license amendment to me by September 29, 2017. Please contact me by e-mail or at 301-415-1447, if you have any questions or comments.
| |
| | |
| Regards, Farideh Farideh E. Saba, P.E.
| |
| Senior Project Manager NRC/ADRO/NRR/DORL
| |
| | |
| 301-415-1447 Mail Stop O-8B01A Farideh.Saba@NRC.GOV
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 3742 Mail Envelope Properties (b9c95af3b3154a16abefa1673a4525ee) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| State Consultation: Request for Comments on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, "Design Vulnerability to Electrical Power System" (CAC NO. MF9574) | | State Consultation: Request for Comments on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System (CAC NO. MF9574) |
| Sent Date: 9/27/2017 12:13:24 PM Received Date: 9/27/2017 12:13:26 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov | | Sent Date: 9/27/2017 12:13:24 PM Received Date: 9/27/2017 12:13:26 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: |
| | | "Anthony Hogan" <Anthony.Hogan@tn.gov> |
| Recipients: "Anthony Hogan" <Anthony.Hogan@tn.gov> Tracking Status: None "Andrew Holcomb" <Andrew.Holcomb@tn.gov> Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov> Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov> | | Tracking Status: None "Andrew Holcomb" <Andrew.Holcomb@tn.gov> |
| Tracking Status: None "Ronewicz, Lynn" <Lynn.Ronewicz@nrc.gov> Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> Tracking Status: None "Ruben Crosslin" <Ruben.Crosslin@tn.gov> | | Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov> |
| Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 1204 9/27/2017 12:13:26 PM 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf 1498686 Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov> |
| | Tracking Status: None "Ronewicz, Lynn" <Lynn.Ronewicz@nrc.gov> |
| | Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> |
| | Tracking Status: None "Ruben Crosslin" <Ruben.Crosslin@tn.gov> |
| | Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 1204 9/27/2017 12:13:26 PM 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf 1498686 Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
|
---|
Category:E-Mail
MONTHYEARML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22081A2222022-03-22022 March 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 1, License Amendment Request to Revise Allowable Value for TS Table 3.3.2-1, Function 6.e(1) ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML22131A1902022-02-23023 February 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Request to Revise the Reactor Vessel Surveillance Capsule Withdrawal Schedule ML22046A0392022-02-15015 February 2022 NRR E-mail Capture - Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22011A0382022-01-10010 January 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A ML21306A2452021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21252A0912021-09-0909 September 2021 NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level ML21223A2592021-08-11011 August 2021 Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21215A1152021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21215A1142021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21197A0452021-07-15015 July 2021 WBN U1 Isi/Sgisi Request for Information (RFI) Letter ML21193A2422021-07-12012 July 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 2 Technical Specifications Related to Steam Generator Inspection/Repair Program Provisions ML21189A0202021-06-29029 June 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specifications 3.3.6 and 3.3.7 Re Radiation Monitor Redundant Unit of Measure 2024-01-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, September 27, 2017 12:13 PM To: Ruben Crosslin Cc: Anthony Hogan; Andrew Holcomb; Schaaf, Robert; Clayton, Beverly; Ronewicz, Lynn; Shoop, Undine
Subject:
State Consultation: Request for Comments on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System (CAC NO. MF9574)
Attachments: 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf Importance: High Mr. Crosslin, The NRC is finalizing license amendment for Watts Bar Nuclear Plant (Watts Bar), Unit 2. We are notifying you of the proposed issuance in accordance with 10 CFR 50.91(b), 10 CFR 50.91(b)(3) and (b)(4). The amendment revises the completion date for License Condition 2.C.(5) for Watts Bar, Unit 2, regarding completion of the actions to resolve the issues identified in Bulletin 2012-01, Design Vulnerability in Electrical Power System, from December 31, 2017, to December 31, 2018, to align with the remainder of TVA fleet and with the nuclear industry.
The licensees submittal dated March 28, 2017, is available in ADAMS under Accession No. ML17093A608.
The amendment was noticed in the Federal Register on July 5, 2017 (82 FR 31103). Please see the attachment to this email. No public comments were received.
Please provide any comments regarding this license amendment to me by September 29, 2017. Please contact me by e-mail or at 301-415-1447, if you have any questions or comments.
- Regards, Farideh Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8B01A Farideh.Saba@NRC.GOV 1
Hearing Identifier: NRR_PMDA Email Number: 3742 Mail Envelope Properties (b9c95af3b3154a16abefa1673a4525ee)
Subject:
State Consultation: Request for Comments on Amendment to Watts Bar Unit 2 Operating Licenses Regarding the Actions to Resolve Issues Identified in NRC Bulletin 2012-01, Design Vulnerability to Electrical Power System (CAC NO. MF9574)
Sent Date: 9/27/2017 12:13:24 PM Received Date: 9/27/2017 12:13:26 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Anthony Hogan" <Anthony.Hogan@tn.gov>
Tracking Status: None "Andrew Holcomb" <Andrew.Holcomb@tn.gov>
Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov>
Tracking Status: None "Clayton, Beverly" <Beverly.Clayton@nrc.gov>
Tracking Status: None "Ronewicz, Lynn" <Lynn.Ronewicz@nrc.gov>
Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>
Tracking Status: None "Ruben Crosslin" <Ruben.Crosslin@tn.gov>
Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 1204 9/27/2017 12:13:26 PM 82 FR 31103 - Watts Bar 7-5-17.onsecondpage.pdf 1498686 Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: