ML18108A302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18108A302
| number = ML18108A302
| issue date = 04/18/2018
| issue date = 04/18/2018
| title = 2018/04/18 NRR E-mail Capture - Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization (EPID No. L-2018-LLA-0066)
| title = NRR E-mail Capture - Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization
| author name = Hon A L
| author name = Hon A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Hess T A
| addressee name = Hess T
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| page count = 2
| page count = 2
| project = EPID:L-2018-LLA-0066
| project = EPID:L-2018-LLA-0066
| stage = Other
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:, PE Project Manager (Sequoyah Nuclear Plant and TVA Fleet) Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8E06
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Hon, Andrew Sent:                            Wednesday, April 18, 2018 9:23 AM To:                              Hess, Thomas A Cc:                              Tindell, Brian


Mail Stop O8B1A  
==Subject:==
Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization (EPID No. L-2018-LLA-0066)
By letter dated March 16, 2018 (ADAMS NO. ML18075A365), TVA submitted the subject license amendment request Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::950 hours]] to complete. The NRC staff expects to complete this review in about 15 months.
If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
If you have any questions, please contact me.
Andy Hon, PE Project Manager (Sequoyah Nuclear Plant and TVA Fleet)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8E06 Mail Stop O8B1A andrew.hon@nrc.gov 1


andrew.hon@nrc.gov}}
Hearing Identifier:      NRR_DMPS Email Number:            301 Mail Envelope Properties      (Andrew.Hon@nrc.gov20180418092300)
 
==Subject:==
Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization (EPID No. L-2018-LLA-0066)
Sent Date:                4/18/2018 9:23:07 AM Received Date:            4/18/2018 9:23:00 AM From:                    Hon, Andrew Created By:              Andrew.Hon@nrc.gov Recipients:
"Tindell, Brian" <Brian.Tindell@nrc.gov>
Tracking Status: None "Hess, Thomas A" <tahess@tva.gov>
Tracking Status: None Post Office:
Files                            Size                    Date & Time MESSAGE                          2417                    4/18/2018 9:23:00 AM Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:}}

Latest revision as of 09:00, 2 December 2019

NRR E-mail Capture - Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization
ML18108A302
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/18/2018
From: Andrew Hon
Plant Licensing Branch II
To: Hess T
Tennessee Valley Authority
References
L-2018-LLA-0066
Download: ML18108A302 (2)


Text

NRR-DMPSPEm Resource From: Hon, Andrew Sent: Wednesday, April 18, 2018 9:23 AM To: Hess, Thomas A Cc: Tindell, Brian

Subject:

Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization (EPID No. L-2018-LLA-0066)

By letter dated March 16, 2018 (ADAMS NO. ML18075A365), TVA submitted the subject license amendment request Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 950 hours39.583 days <br />5.655 weeks <br />1.301 months <br /> to complete. The NRC staff expects to complete this review in about 15 months.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me.

Andy Hon, PE Project Manager (Sequoyah Nuclear Plant and TVA Fleet)

Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8E06 Mail Stop O8B1A andrew.hon@nrc.gov 1

Hearing Identifier: NRR_DMPS Email Number: 301 Mail Envelope Properties (Andrew.Hon@nrc.gov20180418092300)

Subject:

Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization (EPID No. L-2018-LLA-0066)

Sent Date: 4/18/2018 9:23:07 AM Received Date: 4/18/2018 9:23:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:

"Tindell, Brian" <Brian.Tindell@nrc.gov>

Tracking Status: None "Hess, Thomas A" <tahess@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2417 4/18/2018 9:23:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: