Line 2: Line 2:
| number = ML18138A143
| number = ML18138A143
| issue date = 05/18/2018
| issue date = 05/18/2018
| title = 2018/05/18 Vogtle COL Docs - Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 Acceptance Letter.Pdf
| title = COL Docs - Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 Acceptance Letter.Pdf
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 18, 2018 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc. 42 Inverness Center Parkway BIN B237 Birmingham, AL 35242
{{#Wiki_filter:Vogtle PEmails From:                                    Gleaves, Bill Sent:                                    Friday, May 18, 2018 7:41 AM To:                                      Vogtle PEmails Cc:                                      Dixon-Herrity, Jennifer; Patel, Chandu


==SUBJECT:==
==Subject:==
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANY'S REQUEST FOR LICENSE AMENDMENTS FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4: UNQUALIFIED SERVICE LEVEL 1 COATINGS PROGRAM (LAR-17-039) (EPID NO. L-2017-LLA-0376)  
Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Attachments:                             Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Attached is the acceptance letter for LAR-18-015. This letter is being sent to be formally added into NRCs ADAMS system. It will be sent separately to SNC by email due to NRC security policy.
Billy William (Billy) Gleaves Senior Project Manager Licensing Branch 4 Office OWFN 8H17 US NRC, Office of New Reactors The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author are not binding on The Commission.
1
 
Hearing Identifier:      Vogtle_COL_Docs_Public Email Number:            277 Mail Envelope Properties        (CY1PR09MB0908806F93587548DEB1A8AD9F900)


==Dear Mr. Whitley:==
==Subject:==
Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Sent Date:                5/18/2018 7:41:13 AM Received Date:            5/18/2018 7:41:16 AM From:                    Gleaves, Bill Created By:              Bill.Gleaves@nrc.gov Recipients:
"Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:              CY1PR09MB0908.namprd09.prod.outlook.com Files                              Size                    Date & Time MESSAGE                            711                    5/18/2018 7:41:16 AM Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf                        157400 Options Priority:                          Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:


By letter dated April 27, 2018, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18117A464), the Southern Nuclear Operating Company (SNC/licensee) submitted a license amendment request (LAR) for the Vogtle Electric Generating Plant (VEGP) Combined License (COL) Numbers NPF-91 and NPF-92. The requested amendment proposes to depart from Tier 2 information in the Updated Final Safety Analysis Report (UFSAR) (which includes the plant-specific Design Control Document (DCD) Tier 2 information) and involves related changes to plant-specific Tier 1 information, with corresponding changes to the associated COL Appendix C information. Specifically, the amendment, if approved, would revise the Tier 2 information in the UFSAR and associated changes to Tier and the associated COL Appendix C to remove the fire protection system (FPS)  non-safety related containment cable spray and installing passive fire stops and radiant energy  shields. The changes to Tier 1 require and exemption, which is included in the LAR.
May 18, 2018 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the LAR. The acceptance review is a staff process to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
42 Inverness Center Parkway BIN B237 Birmingham, AL 35242


Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, an amendment to the license must fully describe the changes requested and follow, as closely as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.  
==SUBJECT:==
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENTS FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4: UNQUALIFIED SERVICE LEVEL 1 COATINGS PROGRAM (LAR-17-039) (EPID NO. L-2017-LLA-0376)


The NRC staff has reviewed your application against the regulatory requirements and has concluded that it provides sufficient technical detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment.  
==Dear Mr. Whitley:==


Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.  
By letter dated April 27, 2018, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18117A464), the Southern Nuclear Operating Company (SNC/licensee) submitted a license amendment request (LAR) for the Vogtle Electric Generating Plant (VEGP) Combined License (COL) Numbers NPF-91 and NPF-92. The requested amendment proposes to depart from Tier 2 information in the Updated Final Safety Analysis Report (UFSAR) (which includes the plant-specific Design Control Document (DCD)
Tier 2 information) and involves related changes to plant-specific Tier 1 information, with corresponding changes to the associated COL Appendix C information. Specifically, the amendment, if approved, would revise the Tier 2 information in the UFSAR and associated changes to Tier and the associated COL Appendix C to remove the fire protection system (FPS) non-safety related containment cable spray and installing passive fire stops and radiant energy shields. The changes to Tier 1 require and exemption, which is included in the LAR.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the LAR. The acceptance review is a staff process to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, an amendment to the license must fully describe the changes requested and follow, as closely as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.


B. Whitley                                      The NRC staff has reviewed your application against the regulatory requirements and has concluded that it provides sufficient technical detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
You have requested an amendment issuance date of October 15, 2018. We will attempt to support that date but it will depend on whether supplements to your request are required. If the change is needed to support construction, please consider submitting a request for a PAR.
You have requested an amendment issuance date of October 15, 2018. We will attempt to support that date but it will depend on whether supplements to your request are required. If the change is needed to support construction, please consider submitting a request for a PAR.
If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.
If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.
Sincerely,               /RA/
Sincerely,
William (Billy) Gleaves, Senior Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors  
                                                  /RA/
 
William (Billy) Gleaves, Senior Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Docket Nos.: 52-025 52-026 cc: Chandu Patel Jennifer Dixon-Herrity Neil Haggerty Wes Sparkman}}
Docket Nos.: 52-025     52-026 cc: Chandu Patel Jennifer Dixon-Herrity Neil Haggerty Wes Sparkman}}

Latest revision as of 07:39, 2 December 2019

COL Docs - Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 Acceptance Letter.Pdf
ML18138A143
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/18/2018
From:
NRC
To:
NRC/NRO/DNRL/LB4
References
Download: ML18138A143 (4)


Text

Vogtle PEmails From: Gleaves, Bill Sent: Friday, May 18, 2018 7:41 AM To: Vogtle PEmails Cc: Dixon-Herrity, Jennifer; Patel, Chandu

Subject:

Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Attachments: Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Attached is the acceptance letter for LAR-18-015. This letter is being sent to be formally added into NRCs ADAMS system. It will be sent separately to SNC by email due to NRC security policy.

Billy William (Billy) Gleaves Senior Project Manager Licensing Branch 4 Office OWFN 8H17 US NRC, Office of New Reactors The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author are not binding on The Commission.

1

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 277 Mail Envelope Properties (CY1PR09MB0908806F93587548DEB1A8AD9F900)

Subject:

Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf Sent Date: 5/18/2018 7:41:13 AM Received Date: 5/18/2018 7:41:16 AM From: Gleaves, Bill Created By: Bill.Gleaves@nrc.gov Recipients:

"Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Patel, Chandu" <Chandu.Patel@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: CY1PR09MB0908.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 711 5/18/2018 7:41:16 AM Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 ACCEPTANCE LETTER.pdf 157400 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

May 18, 2018 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

42 Inverness Center Parkway BIN B237 Birmingham, AL 35242

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENTS FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4: UNQUALIFIED SERVICE LEVEL 1 COATINGS PROGRAM (LAR-17-039) (EPID NO. L-2017-LLA-0376)

Dear Mr. Whitley:

By letter dated April 27, 2018, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18117A464), the Southern Nuclear Operating Company (SNC/licensee) submitted a license amendment request (LAR) for the Vogtle Electric Generating Plant (VEGP) Combined License (COL) Numbers NPF-91 and NPF-92. The requested amendment proposes to depart from Tier 2 information in the Updated Final Safety Analysis Report (UFSAR) (which includes the plant-specific Design Control Document (DCD)

Tier 2 information) and involves related changes to plant-specific Tier 1 information, with corresponding changes to the associated COL Appendix C information. Specifically, the amendment, if approved, would revise the Tier 2 information in the UFSAR and associated changes to Tier and the associated COL Appendix C to remove the fire protection system (FPS) non-safety related containment cable spray and installing passive fire stops and radiant energy shields. The changes to Tier 1 require and exemption, which is included in the LAR.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the LAR. The acceptance review is a staff process to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, an amendment to the license must fully describe the changes requested and follow, as closely as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

B. Whitley The NRC staff has reviewed your application against the regulatory requirements and has concluded that it provides sufficient technical detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

You have requested an amendment issuance date of October 15, 2018. We will attempt to support that date but it will depend on whether supplements to your request are required. If the change is needed to support construction, please consider submitting a request for a PAR.

If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.

Sincerely,

/RA/

William (Billy) Gleaves, Senior Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Docket Nos.: 52-025 52-026 cc: Chandu Patel Jennifer Dixon-Herrity Neil Haggerty Wes Sparkman