ML060230432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060230432
| number = ML060230432
| issue date = 11/29/2005
| issue date = 11/29/2005
| title = Monticello ITS Conversion Beyond Scope Issue 8 (TAC No. MC7611)
| title = ITS Conversion Beyond Scope Issue 8
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CeD NRC ITS TRACKING NRC Reviewer II 200510281133                                              Conference Call Requested? No Categoryl Discussion ITS Section:                DOC Numhgr:                Jv FNallner:                      agtNm1!wr(s):                l ITS Information  5.0                          L.5                        None                          55 ITS lITS~ cr:                                            Balscsl lJ)uNumberl BSI 8                                                    None This is a Beyond Scope Issue (TAC No. MC7611)
CTS 6.8.B.2 specifies that the integrated leak test requirements for each system outside containment that could contain highly radioactive fluids; during a serious transient or accident must be performed at a refueling cycle interval or less. CTS 6.8.B also states that CTS 4.0.B is applicable (25% grace period is Comment    allowed).
ITS 5.5.2.b specifies that the same test must be performed at least once per 24 months and also states that the provisions of ITS SR 3.0.2 are applicable.
You request increasing the CTS surveillance frequency from 18 months to 24 months, with a maximum of 30 months accounting for the allowable grace period.
There were no questions or comments by NRC staff regarding this issue.
Issue Datel10/28/2005 Resolution requires change to:
N~one Close Date DockeLResponseReiquired'' No W Rcsponses Date Created: 10/28/2005 11:33 AM by Terry Beltz Last Modified: 11/29/2005 01:37 PM http://www.excelservices.com/exceldbs/itstrackmontice] lo.nsf/l fddcea 1Od3bdbb585256e85000 138e4/7b ... 1/23/2006
 
lsl  rt\iewVl  B3v\NRC OwNn rl 3:elr \Z-y~lte    -Numllbe LICE'NSEIE COMMENTS II) l200510281133                                          Validation Required? No RespqnseSubmitted      11/03/2005                                                                                                      l
[Cornmer'tj  Monticello acknowledges that there are no questions or comments concerning this Beyond Scope Issue.
Date Created: 11/03/2005 03:20 PM by Jerry Jones Last Modified: 11/03/2005 03:20 PM 1
http://www.excelservices.com/exceldbs/itstrack-montice~llo.nsf/I fddcea I0d3bdbb585256e85000 13 8e4/Oc ... 1/23/2006}}

Latest revision as of 00:04, 24 November 2019

ITS Conversion Beyond Scope Issue 8
ML060230432
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/29/2005
From:
Office of Nuclear Reactor Regulation
To:
References
TAC MC7611
Download: ML060230432 (2)


Text

CeD NRC ITS TRACKING NRC Reviewer II 200510281133 Conference Call Requested? No Categoryl Discussion ITS Section: DOC Numhgr: Jv FNallner: agtNm1!wr(s): l ITS Information 5.0 L.5 None 55 ITS lITS~ cr: Balscsl lJ)uNumberl BSI 8 None This is a Beyond Scope Issue (TAC No. MC7611)

CTS 6.8.B.2 specifies that the integrated leak test requirements for each system outside containment that could contain highly radioactive fluids; during a serious transient or accident must be performed at a refueling cycle interval or less. CTS 6.8.B also states that CTS 4.0.B is applicable (25% grace period is Comment allowed).

ITS 5.5.2.b specifies that the same test must be performed at least once per 24 months and also states that the provisions of ITS SR 3.0.2 are applicable.

You request increasing the CTS surveillance frequency from 18 months to 24 months, with a maximum of 30 months accounting for the allowable grace period.

There were no questions or comments by NRC staff regarding this issue.

Issue Datel10/28/2005 Resolution requires change to:

N~one Close Date DockeLResponseReiquired No W Rcsponses Date Created: 10/28/2005 11:33 AM by Terry Beltz Last Modified: 11/29/2005 01:37 PM http://www.excelservices.com/exceldbs/itstrackmontice] lo.nsf/l fddcea 1Od3bdbb585256e85000 138e4/7b ... 1/23/2006

lsl rt\iewVl B3v\NRC OwNn rl 3:elr \Z-y~lte -Numllbe LICE'NSEIE COMMENTS II) l200510281133 Validation Required? No RespqnseSubmitted 11/03/2005 l

[Cornmer'tj Monticello acknowledges that there are no questions or comments concerning this Beyond Scope Issue.

Date Created: 11/03/2005 03:20 PM by Jerry Jones Last Modified: 11/03/2005 03:20 PM 1

http://www.excelservices.com/exceldbs/itstrack-montice~llo.nsf/I fddcea I0d3bdbb585256e85000 13 8e4/Oc ... 1/23/2006