ML062430233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Sequoyah Inspection / Activity Plan 09/01/2006
{{#Wiki_filter:Page 1 of 2                                                                                    Sequoyah 08/30/2006    12:34:12                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                    No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                  on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                     1 1, 2           IP 2515/169             Mitigating Systems Performance Index Verification                                               08/01/2006 12/31/2006 Safety Issues EB3-MR        - MR EFFECTIVENESS                                                                                    1 1, 2           IP 7111112B             Maintenance Effectiveness                                                                       08/28/2006 09/01/2006 Baseline Inspections PS2-EP        - EP EXERCISE                                                                                          3 1, 2           IP 7111401               Exercise Evaluation                                                                             08/28/2006 09/01/2006 Baseline Inspections 1, 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                                               08/28/2006 09/01/2006 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                             08/28/2006 09/01/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                   3 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                      10/16/2006 10/20/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59                                                                                   4 1, 2           IP 7111102               Evaluation of Changes, Tests, or Experiments                                                   11/13/2006 11/17/2006 Baseline Inspections EB3-ISI       - U2-INSERVICE INSPECTION                                                                             1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                          12/04/2006 12/08/2006 Baseline Inspections EB3TI150       - 2515/150 U-2: RPV & VHP NOZZLES                                                                     2 2           IP 2515/150             Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA             12/04/2006 12/08/2006 Safety Issues EB3SGISI      - U2 STEAM GENERATOR ISI                                                                              1 2           IP 7111108P             Inservice Inspection Activities - PWR                                                           12/11/2006 12/15/2006 Baseline Inspections PSB1-RP        - ACCESS CONTROL                                                                                      1 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                             12/11/2006 12/15/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                     3 2           IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]               12/17/2006 12/22/2006 Safety Issues OL PREP       - INITIAL EXAM PREP                                                                                   5 1                V23243                SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES                                                    03/19/2007 03/23/2007 Not Applicable EB3-HS         - HEAT SINK                                                                                           2 1, 2          IP 7111107B              Heat Sink Performance                                                                          03/26/2007 03/30/2007 Baseline Inspections OL EXAM       - INITIAL EXAM WEEK 1                                                                                 5 1                V23243                SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES                                                    04/09/2007 04/13/2007 Not Applicable EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                   5 1, 2          IP 7111121              Component Design Bases Inspection                                                              05/14/2007 05/18/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                               06/04/2007 06/08/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                               06/18/2007 06/22/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                               07/09/2007 07/13/2007 Baseline Inspections PS2-EP         - EP INSP                                                                                             1 1, 2          IP 7111402              Alert and Notification System Testing                                                          05/21/2007 05/25/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:34:12 Report 22 1 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2   2515/169 IP Mitigating Systems Performance Index Verification 1 EB3-MR-MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 1, 2   7111112B IP Maintenance Effectiveness 3 PS2-EP-EP EXERCISE Baseline Inspections 08/28/2006 09/01/2006 1, 2   7111401 IP Exercise Evaluation Baseline Inspections 08/28/2006 09/01/2006 1, 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/28/2006 09/01/2006 1, 2   71151 IP Performance Indicator Verification 3 OL RQ-REQUAL INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1, 2  7111111B IP Licensed Operator Requalification Program 4 EB1-MODS-MODIFICATIONS/10CFR50.59 Baseline Inspections 11/13/2006 11/17/2006 1, 2   7111102 IP Evaluation of Changes, Tests, or Experiments 1 EB3-ISI-U2-INSERVICE INSPECTION Baseline Inspections 12/04/2006 12/08/2006 2  7111108P IP Inservice Inspection Activities - PWR 2 EB3TI150-2515/150 U-2: RPV & VHP NOZZLES Safety Issues 12/04/2006 12/08/2006 2   2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 12/11/2006 12/15/2006 2   7111108P IP Inservice Inspection Activities - PWR 1 PSB1-RP-ACCESS CONTROL Baseline Inspections 12/11/2006 12/15/2006 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas 3 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 12/17/2006 12/22/2006 2   2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]5 OL PREP-INITIAL EXAM PREP Not Applicable 03/19/2007 03/23/2007 1    V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 2 EB3-HS-HEAT SINK Baseline Inspections 03/26/2007 03/30/2007 1, 2  7111107B IP Heat Sink Performance 5 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable 04/09/2007 04/13/2007 1    V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 5 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 06/04/2007 06/08/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 06/18/2007 06/22/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/09/2007 07/13/2007 1, 2  7111121 IP Component Design Bases Inspection 1 PS2-EP-EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2  7111402 IP A lert and Notification System Testing This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Sequoyah Inspection / Activity Plan 09/01/2006
Enclosure
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:34:12 Report 22 1 PS2-EP-EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2   7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/21/2007 05/25/2007 1, 2   7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/21/2007 05/25/2007 1, 2   71151 IP Performance Indicator Verification 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1     60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 3 RPB6-PIR-BIENNIAL PI&R INSPECTION Baseline Inspections 07/23/2007 07/27/2007 1, 2   71152B IP Identification and Resolution of Problems Baseline Inspections 08/06/2007 08/10/2007 1, 2  71152B IP Identification and Resolution of Problems 1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/04/2007 09/06/2007 1, 2  7112101 IP A ccess Control to Radiologically Significant Areas 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 10/01/2007 10/05/2007 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1, 2   7112102 IP A LARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1, 2   7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/01/2007 10/05/2007 1, 2   71151 IP Performance Indicator Verification 1 EB3TI150-2515/150 U-1: RPV & VHP NOZZLES Safety Issues 10/15/2007 10/19/2007 1     2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
 
Safety Issues 10/21/2007 10/26/2007 1     2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
Page 2 of 2                                                                                    Sequoyah 08/30/2006    12:34:12                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                    No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                  on Site       Start    End              Type PS2-EP         - EP INSP                                                                                             1 1, 2           IP 7111403               Emergency Response Organization Augmentation Testing                                           05/21/2007 05/25/2007 Baseline Inspections 1, 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                                               05/21/2007 05/25/2007 Baseline Inspections 1, 2           IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                               05/21/2007 05/25/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                             05/21/2007 05/25/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI INSPECTION BY RESIDENT                                                             1 1             IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                 07/09/2007 07/13/2007 Other Routine RPB6-PIR       - BIENNIAL PI&R INSPECTION                                                                             3 1, 2          IP 71152B                Identification and Resolution of Problems                                                      07/23/2007 07/27/2007 Baseline Inspections 1, 2           IP 71152B               Identification and Resolution of Problems                                                       08/06/2007 08/10/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI                                                                 1 1, 2          IP 7112101              Access Control to Radiologically Significant Areas                                              09/04/2007 09/06/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP WK1                                                                   2 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                             10/01/2007 10/05/2007 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                                     10/01/2007 10/05/2007 Baseline Inspections 1, 2           IP 7112202               Radioactive Material Processing and Transportation                                             10/01/2007 10/05/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                             10/01/2007 10/05/2007 Baseline Inspections EB3TI150       - 2515/150 U-1: RPV & VHP NOZZLES                                                                     1 1             IP 2515/150             Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA             10/15/2007 10/19/2007 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)                                                                     1 1             IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]               10/21/2007 10/26/2007 Safety Issues EB3ISI        - U1 ISI                                                                                              1 1              IP 7111108P             Inservice Inspection Activities - PWR                                                           10/22/2007 10/26/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP WK 2                                                                   3 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                             10/22/2007 10/26/2007 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                                     10/22/2007 10/26/2007 Baseline Inspections 1, 2           IP 7112202               Radioactive Material Processing and Transportation                                             10/22/2007 10/26/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                             10/22/2007 10/26/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                   2 1                V23276                SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES                                                  01/07/2008 01/11/2008 Not Applicable OL EXAM        - INITIAL EXAM                                                                                        2 1                 V23276               SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES                                                 01/28/2008 02/01/2008 Not Applicable This report does not include INPO and OUTAGE activities.
]1 EB3ISI-U1 ISI Baseline Inspections 10/22/2007 10/26/2007 1     7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 10/22/2007 10/26/2007 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1, 2   7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1, 2   7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/22/2007 10/26/2007 1, 2   71151 IP Performance Indicator Verification 2 OL PREP-INITIAL EXAM PREP Not Applicable 01/07/2008 01/11/2008 1     V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM Not Applicable 01/28/2008 02/01/2008 1    V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:34, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430233
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/31/2006
From: Widmann M
Reactor Projects Region 2 Branch 6
To: Singer K
Tennessee Valley Authority
Shared Package
ML062430225 List:
References
Download: ML062430233 (2)


Text

Page 1 of 2 Sequoyah 08/30/2006 12:34:12 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/28/2006 09/01/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 10/16/2006 10/20/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/13/2006 11/17/2006 Baseline Inspections EB3-ISI - U2-INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 12/04/2006 12/08/2006 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 2 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 12/04/2006 12/08/2006 Safety Issues EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 12/11/2006 12/15/2006 Baseline Inspections PSB1-RP - ACCESS CONTROL 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 12/11/2006 12/15/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 3 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 12/17/2006 12/22/2006 Safety Issues OL PREP - INITIAL EXAM PREP 5 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 03/19/2007 03/23/2007 Not Applicable EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 03/26/2007 03/30/2007 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 5 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 04/09/2007 04/13/2007 Not Applicable EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1, 2 IP 7111121 Component Design Bases Inspection 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/04/2007 06/08/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/18/2007 06/22/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/09/2007 07/13/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 05/21/2007 05/25/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Sequoyah 08/30/2006 12:34:12 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP INSP 1 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 05/21/2007 05/25/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/21/2007 05/25/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/21/2007 05/25/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/21/2007 05/25/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine RPB6-PIR - BIENNIAL PI&R INSPECTION 3 1, 2 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/04/2007 09/06/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/01/2007 10/05/2007 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/15/2007 10/19/2007 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/21/2007 10/26/2007 Safety Issues EB3ISI - U1 ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/22/2007 10/26/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK 2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/22/2007 10/26/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 01/07/2008 01/11/2008 Not Applicable OL EXAM - INITIAL EXAM 2 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 01/28/2008 02/01/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.