{{#Wiki_filter:* I 1 -I. I Page: Job Performance Measure Exam  
{{#Wiki_filter:*
-- 30-May-2006 JF'M NO JR015.004 Perform a Plant Calorimetric per 0-6.3 Revision #: 4 Review Date:
I                                                                               1 30-May-2006 Job Performance Measure Exam Page:
5/30/2006 Location:
                                                                            -- -I. I JFM NO JR015.004 Perform a Plant Calorimetric per 0-6.3 Revision #:     4 Review Date:     5/30/2006 Location:     In Plant Estimated Time (minutes):           20.00 Candidate:
In Plant Estimated Time (minutes):
20.00 Candidate:
Evaluator:
Evaluator:
Actual Time: .d Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
. d Actual Time:
Submitted By Date Reviewed By Date Page: 2 Job Performance Measure Exam -- 30-MUY-2006
Trainee Performance:       Satisfactory             Unsatisfactory Trainee:
~ 'L/ NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS.
Instructor:
MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Submitted By                                           Date Reviewed By                                             Date
 
30-MUY-2006                                                                              Page:     2 Job Performance Measure Exam                                                 -- ~
L/
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
The PPCS calorimetric calculation is not operable and the LEFM is not being used. Initiating Cues : The Control Room Foreman has directed you to perform a maximum unit power calculation per 0-6.3. For this JPM an Auxiliary Operator will collect field data collect and provide it to you. Although the PPCS calorimetric calculation function is not operable, the PPCS is operable and may be used as necessary.  
The PPCS calorimetric calculation is not operable and the LEFM is not being used.
'W' Page: Job Perfurmanee Measure Exam -- 30-May-2006
Initiating Cues :
'-
The Control Room Foreman has directed you to perform a maximum unit power calculation per 0-6.3. For this JPM an Auxiliary Operator will collect field data collect and provide it to you.
Although the PPCS calorimetric calculation function is not operable, the PPCS is operable and may be used as necessary.
W
 
30-May-2006                                                            Page:
Job Perfurmanee Measure Exam                         --
'-  


== Description:==
== Description:==
Perform a Plant Calorimetric per 0-6.3 (JR015.004)
JPM Tasks Task ID: 193-001-01-01B Task Standards :
In accordance with the procedure Tools :
Calculator Safety Glasses Hard Hat Hearing Protection Terminating Cues
--. Task Completion References :
      -ID                                Description                Review Date Ref Flag PRO            0-6.3              MAXIMUM UNIT POWER PRO            0-6.3.1            STEAM GENERATOR BLOWDOWN CORRECTION FACTOR Safety Considerations Consequences of Inadequate Performance:
Thermal design limit challenge General Comments :
Provide a copy of 0-6.3 and 0-6.3.1
  .--


Perform a Plant Calorimetric per 0-6.3 (JR015.004)
3 0-May-2 006                                                                        Page:       4 Job Performance Measure Exam                                           _- . -
JPM Tasks Task ID: 193-001-01-01B Task Standards
Performance Checklist Element :                         Conditions :                       Standards :
: In accordance with the procedure Tools : Calculator Safety Glasses Hard Hat Hearing Protection Terminating Cues
Obtain current 0-6.3 and 0-6.3.1. NOTE: It is permissible to only     Same as element.
--. Task Completion References
obtain Attachment I and I1 of 0-6.3 and Attachment I of 0-6.3.1.
: ID - PRO 0-6.3 PRO 0-6.3.1 Description Review Date Ref Flag MAXIMUM UNIT POWER STEAM GENERATOR BLOWDOWN CORRECTION FACTOR Safety Considerations Consequences of Inadequate Performance:
Comments :
Thermal design limit challenge General Comments : Provide a copy of 0-6.3 and 0-6.3.1 .--
Satisfactory                   Unsatisfactory Element :       CRITICAL           Conditions :                       Standards :
Page: 4 Job Performance Measure Exam _- . - 3 0-May-2 006 Performance Checklist Element : Conditions
Properly collect and record data   NOTE: If either RTD is unreliable Obtains data from:
: Standards
required by 0-6.3 Attachments I   (S/G RTD feedwater temperature      -PPCS if available and 11.                           deviation high alarm on PPCS) do -MCB not use RTD data, instead use the   -NIS average T/C feedwater temperature and apply for both loops.
: Obtain current 0-6.3 and 0-6.3.1. NOTE: It is permissible to only obtain Attachment I and I1 of 0-6.3 and Attachment I of 0-6.3.1. Same as element.
Note: Provide Barton Data obtained by the A 0 to the examinee Comments :
Comments : Satisfactory Unsatisfactory Element : CRITICAL Conditions
Satisfactory   n               Unsatisfactory   0 Element :       CRITICAL         Conditions :                       Standards :
: Standards
Properly collect and record data CUE: When Data Properly            Obtain the S/G blowdown for Blowdown Correction Factor   Collected the hand out per          flow, temperature and per 0-6.3.1, Attachment I.       collected data for calculations. pressure +/- 20 psig for each S/G from the blowdown panel.
: Properly collect and record data required by 0-6.3 Attachments I and 11. deviation high alarm on PPCS) do -MCB NOTE: If either RTD is unreliable (S/G RTD feedwater temperature not use RTD data, instead use the average T/C feedwater temperature and apply for both loops. Obtains data from: -PPCS if available -NIS Note: Provide Barton Data obtained by the A0 to the examinee Comments : Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions
Comments :
: Standards
Satisfactory                   Unsatisfactory   [7 Element :       CRITICAL         Conditions :                       Standards :
: Properly collect and record data for Blowdown Correction Factor per 0-6.3.1, Attachment I.
Properly perform calculations per                                     1) Same as element.
CUE: When Data Properly Collected the hand out per collected data for calculations. Obtain the S/G blowdown flow, temperature and pressure +/- 20 psig for each S/G from the blowdown panel. Comments : Satisfactory Unsatisfactory
0-6.3.1, Attachment I.                                               2) If interpolate any value between selected rows.
[7 Element : CRITICAL Conditions
: 3) Fq +/- .05.
: Standards
Comments :
: Properly perform calculations per 0-6.3.1, Attachment I. 1) Same as element. 2) If interpolate any value between selected rows.
Satisfactory                   Unsatisfactory   0
: 3) Fq +/- .05. Comments : Satisfactory Unsatisfactory 0
 
I 1 - .- 5. I Page: Job Performance Measure Exam 30-May-2006 w Element: CRITICAL Conditions
I                                                                                                   1 30-May-2006 Job Performance Measure Exam                                   Page:
: Standards
                                                                                              -   . -5. I w     Element:       CRITICAL             Conditions :                     Standards :
: Properly perform calculations per 0-6.3, Attachment I and 11. NOTE: If action is required per step 5.3.2, DO NOT take action. Advise the Shift Supervisor or CRF of any problems noted. Same as element.
Properly perform calculations per NOTE: If action is required per    Same as element.
+/- 0.5% of calculated answer. Comments : Satisfactory n Unsatisfactory 0 6 Element : Conditions
0-6.3, Attachment I and 11.         step 5.3.2, DO NOT take action.
: Recommends appropriate action if Comments : 100% power. Satisfactory 0 Standards
Advise the Shift Supervisor or   +/- 0.5% of calculated CRF of any problems noted.        answer.
: Same as element. Unsatisfactory 0 7 Element : Conditions
Comments :
: Standards
Satisfactory     n               Unsatisfactory 0 6     Element :                           Conditions :                      Standards :
: Compares calorimetric to NIS, recommends action if action. disagreement exists.
Recommends appropriate action if                                     Same as element.
TERMINATING CUE: No further Same as element. NOTE: Attach completed 0-6.3 and 0-6.3.1 to this JPM. Comments : Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag
100% power.
Comments :
Satisfactory     0               Unsatisfactory 0 7     Element :                           Conditions :                     Standards :
Compares calorimetric to NIS,       TERMINATING CUE: No further      Same as element.
recommends action if               action.
disagreement exists.
NOTE: Attach completed 0-6.3 and 0-6.3.1 to this JPM.
Comments :
Satisfactory     0               Unsatisfactory 0 JPM Questions Question Answer References Reference Type   Reference ID         Description                                         Ref Flag


Page: 1 I 25-May-2006 Job Performance Measure Exam  
I 25-May-2006       Job Performance Measure Exam Page:
-- - - JPMNO JR341.002 0-6.13 Daily Performance Log Attachment I Revision #: 0 Review Date: 4/28/2006 Location:
                                                                          -- -
Simulator Estimated Time (minutes):
1
15.00 Candidate:
-                                   JPMNO   JR341.002 0-6.13 Daily Performance Log Attachment I Revision #:     0 Review Date:       4/28/2006 Location:     Simulator Estimated Time (minutes):           15.00 Candidate:
Evaluator:
Evaluator:
Actual Time: - Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
-
Submitted By Reviewed By Date Date Page: -2 Performame Measure Exam -- 2 5-M~ry-2 0 06 ~ I I '.d NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
Actual Time:
THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
Trainee Performance:       Satisfactory             Unsatisfactory Trainee:
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Instructor:
Submitted By                                             Date Reviewed By                                             Date
 
2 5-M~ry-2 006                                                          Page: - 2 I
Performame Measure Exam                         --   ~
I
'.d NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
Normal plant monitoring in progress.
Normal plant monitoring in progress.
Initiating Cues : Perform 0-6.13 Attachment I Channel Checks and Instrument Verification 25-May-2006 Job Performance Measure Exam Page: -- . -3. I
Initiating Cues :
Perform 0-6.13 Attachment I Channel Checks and Instrument Verification
 
25-May-2006 Job Performance Measure Exam                                 Page:
                                                                                            --   .
                                                                                                    -3. I


== Description:==
== Description:==
0-6.13 Daily Performance Logs Attachment (JR341.002)
0-6.13 Daily Performance Logs Attachment (JR341.002)
JPM Tasks Task ID: 119-009-03-01B Task Standards
JPM Tasks Task ID: 119-009-03-01B Task Standards :
: Identify switch, meter or component out of required position or band. Tools : Terminating Cues Task Completion References
Identify switch, meter or component out of required position or band.
: ID - PRO 0-6.13 -, -- Description DAILY SURVEILLANCE LOG Safetv Considerations Consequences of Inadequate Performance: Tech Spec Violation General Comments : Review Date Ref Flag 0 1) Setup the Simulator at any 100% power IC 2) Insert MALF PZR3A, 43% 3) Verify >5% deviation between LT-426 and the other channels
Tools :
Terminating Cues Task Completion References :
      -ID                                 Description                          Review Date  Ref Flag
--
-  ,
PRO           0-6.13               DAILY SURVEILLANCE LOG                               0 Safetv Considerations Consequences of Inadequate Performance:
Tech Spec Violation General Comments :
: 1) Setup the Simulator at any 100% power IC
: 2) Insert MALF PZR3A, 43%
: 3) Verify >5% deviation between LT-426 and the other channels
: 4) Fill out 0-6.13 Attachment I for the last RWST visual check 7/16/06 92%
: 4) Fill out 0-6.13 Attachment I for the last RWST visual check 7/16/06 92%
I 1 P I Page: Job Performance Measure Exam -- 25-May-20 0 6 -' Performance Checklist 1 Element : Conditions
 
: Standards
I                                                                                                 1 25-May-20 06 Job Performance Measure Exam Page:
: Review 0-6.13 Attachment I CUE: give attachment to examinee Same as element Comments : Satisfactory 0 Unsatisfactory 0 2 Element : Conditions
                                                                                              --   PI
: Perform Attachment I per procedure Standards
-'
: Locates meters verify parameters are within operability bands and complete Attachment I signoffs Comments : Satisfactory 0 Unsatisfactory Element : CRITICAL Conditions
Performance Checklist 1   Element :                       Conditions :                         Standards :
: Recognize that LT-426 is outside the acceptance band Standards
Review 0-6.13 Attachment I       CUE: give attachment to examinee     Same as element Comments :
: Locates LT-426. Determines that the instrument is inoperable per 0-6.13 and SR3.3.1.1 Comments : Satisfactory Unsatisfactory 4 Element : Notify the CRS or SM ~~~ Conditions
Satisfactory 0               Unsatisfactory     0 2   Element :                       Conditions :                        Standards :
: Standards
Perform Attachment I per                                             Locates meters verify procedure                                                            parameters are within operability bands and complete Attachment I signoffs Comments :
: CUE: No Further Actions Same as Element Comments : Satisfactory Unsatisfactory 0
Satisfactory 0               Unsatisfactory Element :     CRITICAL         Conditions :                        Standards :
I , Page: 5 I 25-May-2006 Job Performance Measure Exum -- I ..-l)M Ouestions Question Answer References Reference Type Reference ID Description Ref Flag I 1 -l. I Page: Job Performance Measure Exam _- 25-May-2006
Recognize that LT-426 is outside                                     Locates LT-426. Determines the acceptance band                                                  that the instrument is inoperable per 0-6.13 and SR3.3.1.1 Comments :
.-..../' JPM NO JR343.005 Control of LCO's for Equipment Out of Service Revision #: 0 Review Date: 4/28/2006 Location:
Satisfactory                 Unsatisfactory
Simulator Estimated Time (minutes):
                                                                      ~~~
10.00 Candidate:
4   Element :                       Conditions :                        Standards :
Notify the CRS or SM             CUE: No Further Actions             Same as Element Comments :
Satisfactory                 Unsatisfactory       0
 
I
,
I I
25-May-2006     Job Performance Measure Exum Page:    5
                                                              - -
  ..-l)M Ouestions Question Answer References Reference Type Reference ID Description           Ref Flag
 
I                                                                                 1 25-May-2006 Job Performance Measure Exam Page:
_-
                                                                                        -l. I
.-..../
JPM NO     JR343.005 Control of LCOs for Equipment Out of Service Revision #:     0 Review Date:     4/28/2006 Location:     Simulator Estimated Time (minutes):         10.00 Candidate:
Evaluator:
Evaluator:
Actual Time: -4 Trainee Performance:
    -4 Actual Time:
Satisfactory Unsatisfactory Trainee: Instructor:
Trainee Performance:       Satisfactory               Unsatisfactory Trainee:
Submitted By Date Reviewed By Date P I I 25-May-2006 Job Performame Measure Exam -- Page: I 1 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
Instructor:
THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS.
Submitted By                                             Date Reviewed By                                             Date
MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
 
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
I I
25-May-2006         Job Performame Measure Exam Page:
                                                                                                  -- PI 1
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
Plant is at 55% power, Mini-Purge is not in service, no other equipment has an A-52.4 submitted on it. Initiating Cues : Shift Supervisor requests MOV-852A be deemed inoperable and asks you to fill out an A-52.4 to declare the component inoperable.
Plant is at 55% power, Mini-Purge is not in service, no other equipment has an A-52.4 submitted on it.
The equipment will be inoperable due to the breaker being found tripped and cannot be reset. Required testing for operability will be determined after investigation of the problem. Use present date and time for when the component is to be deemed - inoperable.
Initiating Cues :
3 I Page: Job Performance Measure Exam
Shift Supervisor requests MOV-852A be deemed inoperable and asks you to fill out an A-52.4 to declare the component inoperable. The equipment will be inoperable due to the breaker being found tripped and cannot be reset. Required testing for operability will be determined after investigation of the problem. Use present date and time for when the component is to be deemed
-- 25-M~~~-2006  
-   inoperable.
-'
 
25-M~~~-2006 Job Performance Measure Exam Page:
                                                                                              --    3I
-


== Description:==
== Description:==
Complete a A-52.4 Limiting Conditions for Operablity Evaluation (JR343.005)
Complete a A-52.4 Limiting Conditions for Operablity Evaluation (JR343.005)
JPM Tasks Task ID: 300-003-01-01A Task Standards
JPM Tasks Task ID: 300-003-01-01A Task Standards :
: Correctly determine the allowable time out of service for a single component.
Correctly determine the allowable time out of service for a single component.
Tools : Terminating Cues Task Completion Trainee Says Task is Completed References
Tools :
: ID - I PRA A-52.4 TECHSP ITS 3.5.2 DescriDtion Review Date Ref Flag CONTROL OF LIMITING CONDITIONS OF OPERATIONS ECCS - MODES 1,2, and 3 0 Safetv Considerations Consequences of Inadequate Performance:
Terminating Cues Task Completion Trainee Says Task is Completed References :
Tech Spec Violation General Comments
  -ID                                 DescriDtion                              Review Date Ref Flag I
: Component Inoperable is the B train of ECCS Tech Spec. 3.5.2 I I 4 I Page: Job Performance Measure Exam -- 25-May-2006 v' Performance Checklist 1 Element : Obtain a controlled copy of A-52.4 Conditions
PRA           A-52.4               CONTROL OF LIMITING CONDITIONS OF                        0 OPERATIONS TECHSP       ITS 3.5.2           ECCS - MODES 1,2, and 3 Safetv Considerations Consequences of Inadequate Performance:
: Standards
Tech Spec Violation General Comments :
: CUE: Give Examinee copy of the procedure Same as Element Comments : Satisfactory 0 Unsatisfactory 0 2 Element : Conditions
Component Inoperable is the B train of ECCS Tech Spec. 3.5.2
: Fill in EIN, Date, and Time complete step 3.2.1 Comments : Standards
 
: Same as element Satisfactory Unsatisfactory 0 3 Element : Conditions
I                                                                                                 I 25-May-2006 Job Performance Measure Exam Page:
: Determine Plant mode and complete step 3.2.2 - Comments:
                                                                                            --     4I v
Satisfactory Standards
Performance Checklist 1     Element :                           Conditions :                    Standards :
: Plant Mode is Mode 1 Unsatisfactory u *4 Element: CRITICAL Conditions
Obtain a controlled copy of         CUE: Give Examinee copy of the Same as Element A-52.4                              procedure Comments :
: Determine Tech Spec Section and fill in step 3.2.3 Comments : Satisfactory u Standards
Satisfactory     0             Unsatisfactory 0 2     Element :                           Conditions :                    Standards :
: Enter corect T.S. in 3.2.3. Tech Spec Section 3.5.2 ECCS Modes 1-3 Unsatisfactory 5 Element : Conditions
Fill in EIN, Date, and Time                                         Same as element complete step 3.2.1 Comments :
: Perform Loss of Safety Function Screening per Attachment I1 fill in step 3.2.4 Comments : Satisfactory Standards
Satisfactory                   Unsatisfactory 0 3     Element :                           Conditions :                    Standards :
: Determines that no loss of safety function exists Unsatisfactory 0 u - Element : Conditions
Determine Plant mode and                                           Plant Mode is Mode 1 complete step 3.2.2
: Standards
-   Comments:
: Records EOOS PFS and System Colors complete step 3.2.5 CUE: Colors are both Green Records Colors 
Satisfactory                   Unsatisfactory u
-- 5. I Page: Job Performance Measure Exam 25-May-2 006 Comments : u- Satisfactory 0 Unsatisfactory 0 *7 Element: CRITICAL Conditions
*4   Element:         CRITICAL         Conditions :                    Standards :
: Standards
Determine Tech Spec Section and                                     Enter corect T.S. in 3.2.3.
: Determines Required Action time from T.S. 3.5.2 complete step 3.2.6 operable (Table 3.5.2-1) Go To T.S. 3.5.2 Determine that A Train is Determine Reqired action time from 3.5.2A 72 hours to restore Record in step 3.2.6 Comments : Satisfactory 0 Unsatisfactory  
fill in step 3.2.3                                                 Tech Spec Section 3.5.2 ECCS Modes 1-3 Comments :
*8 Element: CRITICAL Conditions
Satisfactory    u              Unsatisfactory 5     Element :                           Conditions :                    Standards :
: Determines Required Action time not met from T.S. 3.5.2 complete step 3.2.13 CUE: No further actions Standards
Perform Loss of Safety Function                                     Determines that no loss of Screening per Attachment I1 fill in                                 safety function exists step 3.2.4 Comments :
: Go to 3.5.2B record time in step 3.2.13 Mode 3 in 6 hours Mode 4 in 12 hours Comments : Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag I 1 -l. I Page: Job Performance Measure Exam -- 25-May-2006 I 1 v JPM NO JC119.001 Complete EPIP 1-5 Status Report (PPCS no avalible)
Satisfactory                   Unsatisfactory 0 u -   Element :                           Conditions :                   Standards :
Revision #: 0 Review Date: 5/22/2006 Location:
Records EOOS PFS and System         CUE: Colors are both Green      Records Colors Colors complete step 3.2.5
Simulator Estimated Time (minutes):
 
10.00 Candidate:
25-May-2 006 Job Performance Measure Exam                                 Page:
Evaluator:  
                                                                                                - 5.- I u-Comments :
-.- Actual Time: Trainee Performance:
Satisfactory   0               Unsatisfactory 0
Satisfactory Unsatisfactory Trainee: Instructor:
*7   Element:       CRITICAL           Conditions :                   Standards :
Submitted By Date Reviewed By Date Page: 2 Job Performance Measure Exam -- 25-May-2006
Determines Required Action time                                   Go To T.S. 3.5.2 from T.S. 3.5.2 complete step                                     Determine that A Train is 3.2.6                                                             operable (Table 3.5.2-1)
~ .--' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
Determine Reqired action time from 3.5.2A 72 hours to restore Record in step 3.2.6 Comments :
THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
Satisfactory     0             Unsatisfactory
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE. Initial Conditions:
*8   Element:       CRITICAL           Conditions :                    Standards :
The Plant was at 100% power when a LOCA occured. An Alert was declared and the Initial notification has been made per EPIP 1-5. The PPCS has failed and the TSC is unable to complete status reports for transmittal.
Determines Required Action time   CUE: No further actions        Go to 3.5.2B record time in not met from T.S. 3.5.2 complete                                   step 3.2.13 step 3.2.13                                                       Mode 3 in 6 hours Mode 4 in 12 hours Comments :
The communicator is currently busy making followup notifications.
Satisfactory     0             Unsatisfactory 0 JPM Questions Question Answer References Reference Type   Reference ID       Description                                       Ref Flag
Initiating Cues : The Shift Manager directs you to complete and transmit the plant status report per EPIP 1-5 Attachment 3e.
 
r 1 -- - - 3.1 Page: Job Performance Measure Exam 25-May-2 006 L-
I                                                                                 1 I
25-May-2006 Job Performance Measure Exam Page:
                                                                              --
I
                                                                                  -l. 1 v
JPM NO     JC119.001 Complete EPIP 1-5 Status Report (PPCS no avalible)
Revision #:     0 Review Date:     5/22/2006 Location:   Simulator Estimated Time (minutes):         10.00 Candidate:
Evaluator:
-.-
Actual Time:
Trainee Performance:       Satisfactory               Unsatisfactory Trainee:
Instructor:
Submitted By                                             Date Reviewed By                                             Date
 
25-May-2006                                                                            Page:     2 Job Performance Measure Exam                                           -- ~
.--'
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
The Plant was at 100% power when a LOCA occured. An Alert was declared and the Initial notification has been made per EPIP 1-5. The PPCS has failed and the TSC is unable to complete status reports for transmittal. The communicator is currently busy making followup notifications.
Initiating Cues :
The Shift Manager directs you to complete and transmit the plant status report per EPIP 1-5 Attachment 3e.
 
r                                                                                                             1 25-May-2006                                                                                Page:
Job Performance Measure Exam                                               --  - -3.1 L-


== Description:==
== Description:==
Complete EPIP 1-5 Status Report (PPCS 00s) (JC119.001)
Complete EPIP 1-5 Status Report (PPCS 00s) (JC119.001)
JPM Tasks Task ID: 1 19-007-03-0 1A Task Standards
JPM Tasks Task ID: 119-007-03-01A Task Standards :
: Correctly complete EPIP 1-5 Attachment 3e data sheet. Tools : Terminating Cues The Data sheet is correctly completed References
Correctly complete EPIP 1-5 Attachment 3e data sheet.
: - ID Description PREPIP EPIP 1-5 NOTIFICATIONS Review Date Ref Flag CI Safety Considerations Consequences of Inadequate Performance:
Tools :
Failure to correctly complete the required data sheet will result in the TSC & EOF being unable to assess plant conditions. This results in an inability of those organization to provide the need support the the Control Room and to protect the public. General Comments
Terminating Cues The Data sheet is correctly completed References :
: Setup the Simulator to any at Power IC. Insert a 5000 gpm LOCA and complete E-0. Freeze simulator and record EPIP 1-5 Attachment 3e data for the key.
    -ID                                 Description                                   Review Date  Ref Flag PREPIP         EPIP 1-5             NOTIFICATIONS                                                 CI Safety Considerations Consequences of Inadequate Performance:
-- . - 41 Page: Job Performance Measure Exam 25-May-2006
Failure to correctly complete the required data sheet will result in the TSC & EOF being unable to assess plant conditions. This results in an inability of those organization to provide the need support the the Control Room and to protect the public.
: u. Performance Checklist 1 Element : Conditions
General Comments :
: Obtain EPIP 1-5 Procedure and review attachment 3e Comments : Satisfactory 0 Standards
Setup the Simulator to any at Power IC. Insert a 5000 gpm LOCA and complete E-0. Freeze simulator and record EPIP 1-5 Attachment 3e data for the key.
: Obtain Procedure Determine that Attachment 3e must be performed Unsatisfactory 0 *2 Element: CRITICAL Conditions
 
: Obtain Data for Attachment 3e from the Control Room indications.
25-May-2006                                                                      Page:
~ Standards
Job Performance Measure Exam                                     -- . -4 1 u.
: Locates MCB indicators and records Data on the attachment Comments : Satisfactory Unsatisfactory  
Performance Checklist 1     Element :                           Conditions :                    Standards :
** Element: CRITICAL Conditions
Obtain EPIP 1-5 Procedure and                                       Obtain Procedure review attachment 3e                                               Determine that Attachment 3e must be performed Comments :
: Standards
Satisfactory    0              Unsatisfactory 0
: Transmitts the attachment to the TSC or telephone Comments : CUE: No further actions Transmits to the TSC via Fax L Satisfactory 0 Unsatisfactory c] JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag I I -l. I Page: Job Performance Measure Exam -- 25-May-2006
                                                                                                    ~
\- JPM NO JS345.001 Respond to a Hazardous Chemical Spill Revision #: 0 Review Date: 5/22/2006 Location:
*2   Element:       CRITICAL             Conditions :                    Standards :
In Plant Estimated Time (minutes):
Obtain Data for Attachment 3e                                       Locates MCB indicators and from the Control Room                                               records Data on the indications.                                                        attachment Comments :
15.00 Candidate:
Satisfactory                   Unsatisfactory
Evaluator:  
**   Element:       CRITICAL             Conditions :                   Standards :
.. ---- Actual Time: Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
Transmitts the attachment to the   CUE: No further actions         Transmits to the TSC via Fax L
Submitted By Date Reviewed By Date I I Page: Performance Measure Exam -- 25-iMry-2006 I J d' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
TSC                                                                or telephone Comments :
THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
Satisfactory     0             Unsatisfactory c]
THE EVALUATOR WILL BE TAKING NOTES, ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
JPM Questions Question Answer References Reference Type     Reference ID       Description                                       Ref Flag
 
I                                                                             I 25-May-2006 Job Performance Measure Exam Page:
                                                                              -- -l. I
\-
JPM NO JS345.001 Respond to a Hazardous Chemical Spill Revision #:   0 Review Date:     5/22/2006 Location:   In Plant Estimated Time (minutes):         15.00 Candidate:
Evaluator:
.---- .
Actual Time:
Trainee Performance:       Satisfactory           Unsatisfactory Trainee:
Instructor:
Submitted By                                         Date Reviewed By                                         Date
 
I                                                                                               I 25-iMry-2006                                                                          Page:
I Performance Measure Exam                                     --
J d'
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES, ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
The plant is operating durring normal conditions 100% power. Dayshift Midweek. You are the Shift ,Manager.
The plant is operating durring normal conditions 100% power. Dayshift Midweek. You are the Shift ,Manager.
Initiating Cues : The Stockroom notifies you that they were transporting 2 barrels of Hydrazine from the Warehouse to the Turbine Building. While decending the hill near the Outside Condensate Storage tank one of the barrels fell off the pallet and is leaking.
Initiating Cues :
I I -3. I Page: Job Performance Measure Exam -- 25-May-2006
The Stockroom notifies you that they were transporting 2 barrels of Hydrazine from the Warehouse to the Turbine Building. While decending the hill near the Outside Condensate Storage tank one of the barrels fell off the pallet and is leaking.
 
I                                                                                                             I 25-May-2006 Job Performance Measure Exam Page:
                                                                                                        --
                                                                                                              -3. I
'y
'y


== Description:==
== Description:==
Respond to a Hazardous Chemical spill JPM Tasks Task ID: 345-001-05-03A Task Standards :
Implement IP-ENV-3 to contain the spill and notify appropriate responders.
Tools :
TerminatinE Cues Task Completion References :
      -ID                                  Descrbtion                                    Review Date Ref Flag PRIP          IP-ENV-3              RESPONSE TO A SPILL OF HAZARDOUS L-MATERIAL/WASTE Safetv Considerations Consequences of Inadequate Performance:
Failure to mitigate the effects of a Chemical Spill result in an increase in risk to plant personnel and the public.
General Comments :


Respond to a Hazardous Chemical spill JPM Tasks Task ID: 345-001-05-03A Task Standards
25-May-2006                                                                            Page:       4 Job Performance Measure Exam                                           --   ~
: Implement IP-ENV-3 to contain the spill and notify appropriate responders.
W-Performance Checklist 1    Element :                         Conditions :                          Standards :
Tools : TerminatinE Cues Task Completion References
Obtain Copy of IP-ENV-3. Go to                                           Same as Element the spill response section Comments :
: ID - PRIP IP-ENV-3 L- Descrbtion Review Date Ref Flag RESPONSE TO A SPILL OF HAZARDOUS MATERIAL/WASTE Safetv Considerations Consequences of Inadequate Performance:
Satisfactory                     Unsatisfactory   Iz]
Failure to mitigate the effects of a Chemical Spill result in an increase in risk to plant personnel and the public. General Comments
*2    Element :        CRITICAL         Conditions :                         Standards :
:
Announce spill over PA system    CUE: Announcement is made.           Makes the announcement or direct operator to make the annoucement Comments :
Page: 4 Job Performance Measure Exam  
Satisfactory   0                 Unsatisfactory   0
-- 25-May-2006
*3    Element :       CRITICAL         Conditions :                          Standards :
~ W- 1 *2 *3 --. Performance Checklist Element : Conditions
Dispatches Personnel to evaluate CUE: Personnel Contacted              Contacts one of the following the spill.                                                             to evaluate the spill:
: Obtain Copy of IP-ENV-3.
  --.
Go to the spill response section Comments : Standards
                                                                              -NLO Note: Give the following Cue to       -Chemical Control the SM after the evaluator has been Coordinator dispatched.                           -Safety Group
: Same as Element Satisfactory Unsatisfactory Iz] CRITICAL Conditions
                                                                              -Chemistry Group CUE: The spill evaluator reports the following;
: Standards
: CUE: Announcement is made. Element : Announce spill over PA system Makes the announcement or direct operator to make the annoucement Comments : Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions
: Dispatches Personnel to evaluate the spill. CUE: Personnel Contacted Note: Give the following Cue to the SM after the evaluator has been dispatched.
Standards
: Contacts one of the following to evaluate the spill: -Chemical Control Coordinator -Safety Group -Chemistry Group -NLO CUE: The spill evaluator reports the following;
: 1. The barrel split open spilling 112 its 35 gal contents.
: 1. The barrel split open spilling 112 its 35 gal contents.
: 2. Some of the contents ran into the storm drain located North of the outside CST.
: 2. Some of the contents ran into the storm drain located North of the outside CST.
: 3. The Forklift operator breathed in fumes from the chemical and is feeling ill, he is now in the TSC. 4. The material involed is SCAVOX 35% Hydrazine.
: 3. The Forklift operator breathed in fumes from the chemical and is feeling ill, he is now in the TSC.
: 5. The HazMat Coordinator is on scene attempting to contain the spill. Comments : -. Satisfactory Unsatisfactory 0
: 4. The material involed is SCAVOX 35% Hydrazine.
-- - - 51 Page: Job Performance Memure Exam 25-May-2006
: 5. The HazMat Coordinator is on scene attempting to contain the spill.
-/ Element: CRITICAL Conditions
  -.
: Standards
Comments :
: Announces a Medical Emergency Note: When the Medical Announcement is made give the following cue. CUE: The CRS is refering to A-7 "Handling Injuries and Medical Emergencies''
Satisfactory                     Unsatisfactory   0
and the associated notifications Make or Direct annoucement for Medical Response team to report to the TSC Comments : Satisfactory 0 Unsatisfactory
 
[7 *5 Element: CRITICAL Conditions
25-May-2006 Job Performance Memure Exam                                     Page:
: Determines that the spill is major Comments : Satisfactory 0 Standards
                                                                                              --  - -51
: Determine that per attachment 1 and step 3.3.3 A. 2. that the spill is major.
-/ Element:       CRITICAL           Conditions :                       Standards :
Unsatisfactory ~ ~ Element : CRITICAL Conditions
Announces a Medical Emergency     Note: When the Medical             Make or Direct annoucement Announcement is made give the     for Medical Response team to following cue.                     report to the TSC CUE: The CRS is refering to A-7 "Handling Injuries and Medical Emergencies'' and the associated notifications Comments :
: Perform Major spill action (not previously done) the Response coordinator-CUE: When notification made to MaryEllen Dangler has been notified and is acting as Coordinator and Enviromental response team leader.
Satisfactory   0                 Unsatisfactory [7
Comments : Satisfactory Unsatisfactory Standards
*5 Element:       CRITICAL           Conditions :                      Standards :
: Obtains MSDS sheet for the chemical Completes Attachment 2 Notifies the Response coordinator and Enviromental staff 0 7 Element : Conditions
Determines that the spill is major                                   Determine that per attachment 1 and step 3.3.3 A. 2. that the spill is major.
: Standards
Comments :
: Evaluate the spill for EPIP 1-0 reporti bility critera was exceeded Comments : CUE: No Further Actions Detemine that no classifiction Satisfactory Unsatisfactory 0
Satisfactory  0                Unsatisfactory
Page: 1 I 25-May-2006 Job Performance Measure Exam -- ~ JPM NO JS343.006 Loss Of Safety Function Determination Revision #: 0 Review Date: 5/22/2006 Location:
                                                                  ~ ~
Classroom Estimated Time (minutes):
Element :     CRITICAL           Conditions :                      Standards :
10.00 Candidate:
Perform Major spill action (not   CUE: When notification made to    Obtains MSDS sheet for the previously done)                   the Response coordinator-         chemical MaryEllen Dangler has been         Completes Attachment 2 notified and is acting as         Notifies the Response Coordinator and Enviromental      coordinator and Enviromental response team leader.             staff Comments :
Evaluator:  
Satisfactory                   Unsatisfactory 0 7 Element :                         Conditions :                       Standards :
.. --- Actual Time: Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
Evaluate the spill for EPIP 1-0   CUE: No Further Actions           Detemine that no classifiction reporti bility                                                        critera was exceeded Comments :
Submitted By Reviewed By Date Date Page: 2 Pmformance Measure Exam -- 25-MUY-2006
Satisfactory                   Unsatisfactory 0
~ V' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
 
THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
I 25-May-2006       Job Performance Measure Exam Page:
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
                                                                                -- ~
1 JPM NO JS343.006 Loss Of Safety Function Determination Revision #:     0 Review Date:       5/22/2006 Location:     Classroom Estimated Time (minutes):           10.00 Candidate:
Evaluator:
. --- .
Actual Time:
Trainee Performance:       Satisfactory           Unsatisfactory Trainee:
Instructor:
Submitted By                                           Date Reviewed By                                             Date
 
25-MUY-2006                                                                      Page:     2 Pmformance Measure Exam                                     -- ~
V '
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
100% Power normal operations. The following equipment is 00s "D" SW pump "B" CNMT Recirc Fan MOV 852A Initiating Cues : The MCC 1D Supply Breaker trips and cannot be reset. MCC 1D is deenergized. What action must be taken per Tech Specs? -
100% Power normal operations. The following equipment is 00s "D"SW pump "B"CNMT Recirc Fan MOV 852A Initiating Cues :
1 -- I Page: Job Performance Measure Exam -- 25-May-2 006
The MCC 1D Supply Breaker trips and cannot be reset. MCC 1D is deenergized. What action must be taken per Tech Specs?
-
 
1 25-May-2 006 Job Performance Measure Exam Page:
                                                                                                  --     -- I   


== Description:==
== Description:==
Loss of Safety Function Determination JPM Tasks Task ID: 300-003-03-02C Task Standards :
Correctly Identify that a loss of Safety Function Exists Tools :
Terminating Cues Task Completion Trainee Says Task is Completed References :
    -ID                                  Description                                Review Date Ref Flag PRA          A-52.4                  CONTROL OF LIMITING CONDITIONS OF OPERATIONS TECHSP        ITS 3.5.2              ECCS - MODES 1,2, and 3 TECHSP        ITS 3.6.6              Containmen Spray (CS), Contaiment Recirculation Fan Cooler (CRFC), NaOH, and Containment Post-Accident Charcoal Systems TECHSP        ITS 3.7.8              Service Water System                                      CI TECHSP        ITS 3.8.9              Distribution Systems - MODES 1,2,3, and 4                0 Safety Considerations Consequences of Inadequate Performance:
Tech Spec Violation General Comments :


Loss of Safety Function Determination JPM Tasks Task ID: 300-003-03-02C Task Standards
I                                                                                            I 25-May-2006 Job Performance Measure Exam Page:
: Correctly Identify that a loss of Safety Function Exists Tools : Terminating Cues Task Completion Trainee Says Task is Completed References
                                                                                        --     4 I
: ID - PRA A-52.4 TECHSP ITS 3.5.2 TECHSP ITS 3.6.6 TECHSP ITS 3.7.8 TECHSP ITS 3.8.9 Description CONTROL OF LIMITING CONDITIONS OF OPERATIONS Containmen Spray (CS), Contaiment Recirculation Fan Cooler (CRFC), NaOH, and Containment Post-Accident Charcoal Systems Service Water System Distribution Systems - MODES 1,2,3, and 4 ECCS - MODES 1,2, and 3 Safety Considerations Consequences of Inadequate Performance:
--.
Tech Spec Violation Review Date Ref Flag CI 0 General Comments
Performance Checklist 1     Element :                         Conditions :                Standards :
:
Obtain Copy of Tech Specs and                                 Same As Element A-53.4 Comments :
I I 4 I Page: Job Performance Measure Exam -- 25-May-2006
Satisfactory             Unsatisfactory 0
--. Performance Checklist 1 Element : Conditions
*2   Element:       CRITICAL         Conditions :                Standards :
: Obtain Copy of Tech Specs and A-53.4 Standards
Per TS 3.8.9 determine that "B"                               Same as Element train of AC power Dist is inoperable Comments :
: Same As Element Comments : Satisfactory Unsatisfactory 0 *2 Element: CRITICAL Conditions
Satisfactory             Unsatisfactory c]
: Per TS 3.8.9 determine that "B" train of AC power Dist is inoperable Comments : Satisfactory Standards
3     Element :                         Conditions :                Standards :
: Same as Element Unsatisfactory c] 3 Element : Conditions
Fill out A52.4 steps3.2.1-3.2.3                               Same as Element
: Fill out A52.4 steps3.2.1-3.2.3  
  --
-- Comments : Satisfactory Standards
Comments :
: Same as Element Unsatisfactory c] *4 Element: CRITICAL Conditions
Satisfactory             Unsatisfactory c]
: Perform Saferty Function evaluation (per Attachment
*4   Element:       CRITICAL         Conditions :                Standards :
: 11) Comments : Satisfactory Standards
Perform Saferty Function                                     Evaluate 00s equipment evaluation (per Attachment 11)                               1) SW pump D- Not in SW spec. therefore 3.8.9 gives guidence
: Evaluate 00s equipment
: 2) "B" Recirc Fan All other fans have normal power supplies therefore do not have a loss of safety function.
: 1) SW pump D- Not in SW spec. therefore 3.8.9 gives guidence 2) "B" Recirc Fan All other fans have normal power supplies therefore do not have a loss of safety function.
3 ) MOV 852A, MCC 1D supplies MOV 852B therefore both trains of RHR are incapable of injection and inoperable.
: 3) MOV 852A, MCC 1D supplies MOV 852B therefore both trains of RHR are incapable of injection and inoperable.
Comments :
Unsatisfactory c]
Satisfactory              Unsatisfactory c]
Page: 5 Job Performance Measure Exam - .- 25-May-2006
 
..-. Element: CRITICAL Conditions
25-May-2006                                                                      Page:     5 Job Performance Measure Exam                                     -   . -
: Determine both trains of SI iooperable enter TS 3.5.2B which directs to TS 3.0.3 Cue: No further actions Comments : Satisfactory Standards
.-. Element:       CRITICAL           Conditions :                    Standards :
: Same as Element Unsatisfactory JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag 1 I -l. I Page: Job Performance Measure Exam -- 22-Mi~y-2 006 JPM NO JS119.0Oi Verify Equipment Tagout Boundary Revision#:
Determine both trains of SI         Cue: No further actions          Same as Element iooperable enter TS 3.5.2B which directs to TS 3.0.3 Comments :
0 Review Date: 4/28/2006 Location:
Satisfactory                     Unsatisfactory JPM Questions Question Answer References Reference Type     Reference ID       Description                                     Ref Flag
Classroom Estimated Time (minutes):
 
10.00 Candidate:
1                                                                             I 22-Mi~y-2006 Job Performance Measure Exam Page:
Evaluator:  
                                                                            --
*. - Actual Time: Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
                                                                              -l. I JPM NO JS119.0Oi Verify Equipment Tagout Boundary Revision#:     0 Review Date:     4/28/2006 Location:     Classroom Estimated Time (minutes):           10.00 Candidate:
Submitted By Date Reviewed By Date 22-May-2006 Job Performance Measure Exam Page: -- 2. I 1,. NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
Evaluator:
THE EXAh4INEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
*. -
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Actual Time:
Trainee Performance:     Satisfactory           Unsatisfactory Trainee:
Instructor:
Submitted By                                           Date Reviewed By                                           Date
 
22-May-2006 Job Performance Measure Exam                                   Page:
                                                                                              -- 2. I 1,.
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAh4INEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
Initial Conditions:
Condensate transfer pump (PCD04) requires pump bearing replacement.
Condensate transfer pump (PCD04) requires pump bearing replacement.
Initiating Cues : The SM has requested you review the completed Isolated Work Area Request (A- 140 1, Figure 1) for isolating the Condensate Transfer Pump (PCD04) to veri@ work area boundaries.
Initiating Cues :
:. I Page: Job Performance Measure Exam  
The SM has requested you review the completed Isolated Work Area Request (A- 1401, Figure
-- 22-May-2006
: 1) for isolating the Condensate Transfer Pump (PCD04) to veri@ work area boundaries.
 
22-May-2006 Job Performance Measure Exam Page:
                                                                                              --      :.I b..
 
== Description:==
Review Isolated Work Area Request(JS 1 19.001)
JPM Tasks Task ID: 342-004-03-02A Task Standards :
: 1) Determine adequate boundary exists
: 2) Determine inadequate boundary exists Tools :
P&ID 33013-1234 P-12 Terminating Cues Trainee Says Task is Completed Task Completion v
References :
  -ID                              Description                              Review Date    Ref Flag PROPSA        A-1401              STATION HOLDING RULES                                      0 PRP          P-12              ELECTRICAL SYSTEMS PRECAUTIONS,                              0 LIMITATIONS, AND SETPOINTS Safety Considerations Consequences of Inadequate Performance:
Personal Injury Equipment Damage General Comments :
Provide P&ID and A-1401 Figure 1 to student. Incorporate errors on A-1401 Figure 1 if it is desired to exercise Option 2.
d'
 
22-May-2006                                                                    Page:       4 Job Performance Measure Exam
                                                ~~
                                                                                              - -
v Performance Checklist 1    Element :                          Conditions :                  Standards :
Review Isolated Work Boundary.                                    Same as element.
Comments :
Satisfactory      0            Unsatisfactory 0
*2    Element:      CRITICAL            Conditions :                  Standards :
Option 1 - Boundary is adequate. CUE: No further actions        Option 1 - Determines no Option 2 - Boundary is not                                        errors in boundary.
adequate.                                                        Option 2 - Determines and reports errors in boundary.
V-4046 needs to be closed.
Comments :
Satisfactory      0            Unsatisfactory 0 M Questions
._
Question Answer References Reference Type    Reference ID        Description                                      Ref Flag


==
25-May-2006 Job Performance Measure Exam Page:
Description:==
                                                                            -- -:I U
Review Isolated Work Area Request(JS 1 19.001) b.. JPM Tasks Task ID: 342-004-03-02A Task Standards
JPM NO JS341.002 Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)
: 1) Determine adequate boundary exists 2) Determine inadequate boundary exists Tools : P&ID 33013-1234 P-12 Terminating Cues Trainee Says Task is Completed Task Completion v References
Revision #:   1 Review Date:     5/22/2006 Location:   Classroom Estimated Time (minutes):         10.00 Candidate:
: ID - PROPSA A-1401 PRP P-12 Description STATION HOLDING RULES ELECTRICAL SYSTEMS PRECAUTIONS, LIMITATIONS, AND SETPOINTS Safety Considerations Consequences of Inadequate Performance: Personal Injury Equipment Damage General Comments : Review Date Ref Flag 0 0 Provide P&ID and A-1401 Figure 1 to student. Incorporate errors on A-1401 Figure 1 if it is desired to exercise Option 2.
d' Page: 4 Job Performance Measure Exam  
-- 22-May-2006 v Performance Checklist 1 Element : Review Isolated Work Boundary.
Comments : Satisfactory
~~ Conditions
: 0 Unsatisfactory 0 Standards
: Same as element. *2 Element: CRITICAL Conditions
: Standards
: Option 1 - Boundary is adequate.
Option 2 - Boundary is not adequate.
CUE: No further actions Option 1 - Determines no errors in boundary.
Option 2 - Determines and reports errors in boundary.
V-4046 needs to be closed. Comments : Satisfactory 0 Unsatisfactory 0 M Questions
._ Question Answer References Reference Type Reference ID Description Ref Flag 
-: I Page: Job Performance Measure Exam -- 25-May-2006 U' JPM NO JS341.002 Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)
Revision #: 1 Review Date: 5/22/2006 Location:
Classroom Estimated Time (minutes):
10.00 Candidate:
Evaluator:
Evaluator:
Actual Time: I Trainee Performance:
I Actual Time:
Satisfactory Unsatisfactory Trainee: Instructor:
Trainee Performance:       Satisfactory               Unsatisfactory Trainee:
Submitted By Date Reviewed By Date 25-May-2006 Job Performance Measure Exam Page: -- -: I -' NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED.
Instructor:
THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE  
Submitted By                                             Date Reviewed By                                             Date
'IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
 
THE EVALUATOR WILL BE TAKING NOTES.
25-May-2006 Job Performance Measure Exam Page:
ASK FOR CLARIFICATION OF PM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE. Initial Conditions: The operating crew is preparing to release a Monitor Tank.
                                                                                                --
Initiating Cues : You are the Shift Manager and are required to review a release form prior to making a Liquid Release of the Monitor Tank per CH-RETS-LIQ-REL "Liquid Waste Release" Figure V
                                                                                                    -:I
I 1 -: I Page: Job Performance Measure Exam -- 25-May-2006
-'
NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE 'IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF P M REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
The operating crew is preparing to release a Monitor Tank.
Initiating Cues :
You are the Shift Manager and are required to review a release form prior to making a Liquid Release of the Monitor Tank per CH-RETS-LIQ-REL "Liquid Waste Release" Figure V


==
I                                                                                                      1 25-May-2006 Job Performance Measure Exam Page:
Description:==
                                                                                                  --    -:I L
 
== Description:==
Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)
Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)
JPM Tasks Task ID: 341-012-03-03A L' Task Standards
JPM Tasks Task ID: 341-012-03-03A Task Standards :
: Detects errors in the permit and does not approve the permit until corrected.
Detects errors in the permit and does not approve the permit until corrected.
Tools : Terminating; Cues Task Completion References
Tools :
: - ID Descrbtion PRCH CH-RETS-LIQ-REL LIQUID WASTE RELEASE Safetv Considerations Consequences of Inadequate Performance:
Terminating; Cues Task Completion References :
Exceeding Release rate for a Liquid Release General Comments
    -
: Review Date Ref Flag CI Complete a CH-RETS-LIQ-REL Attachment V for pre release condition. (May obtain RP assistance) compete pre release parts correctly except  
ID                                 Descrbtion                               Review Date    Ref Flag PRCH         CH-RETS-LIQ-REL     LIQUID WASTE RELEASE                                         CI Safetv Considerations Consequences of Inadequate Performance:
@r the sample time being >12 hour prior to the start of the release.
Exceeding Release rate for a Liquid Release General Comments :
I Page: 4 Job Performance Measure Exam May-2006 - --. Performance Checklist Conditions
Complete a CH-RETS-LIQ-REL Attachment V for pre release condition. (May obtain RP assistance) compete pre release parts correctly except @r the sample time being >12 hour prior to the start of the release.
: Standards
 
: Same as element 1 Element : Reviews CH-RETS-LIQ-REL form. Comments : Satisfactory 0 Unsatisfactory 0 *2 Element: CRTTICAL Conditions
I 25-May-2006                                                                      Page:         4 Job Performance Measure Exam                                       -     -
: Evaluate Attacment V for correct Data Standards
--.
: Determines the form is incorrect in that the release time is outside the allowable time permited.
Performance Checklist 1    Element :                        Conditions :                     Standards :
(> 12 hours since the sample time)
Reviews CH-RETS-LIQ-REL                                           Same as element form.
Comments : Satisfactory Unsatisfactory
Comments :
[7 Element : Conditions
Satisfactory   0               Unsatisfactory 0
: Standards
*2   Element:       CRTTICAL           Conditions :                    Standards :
: --/ Determine that sample must be Cue No further actions Same as element.
Evaluate Attacment V for correct                                   Determines the form is Data                                                              incorrect in that the release time is outside the allowable time permited. (> 12 hours since the sample time)
redone Comments : Satisfactory Unsatisfactory JPM Ouestions Question Answer References Reference Type Reference ID Description Ref Flag Page: Job Performance Measure Exam -- 2 5-May-2 006 -' Event Classification Revision #: 0 Review Date: 5/4/2006 Lo cation: Simulator Estimated Time (minutes):
Comments :
JPM NO JS340.021 15.00 Candidate:
Satisfactory                   Unsatisfactory [7 Element :                         Conditions :                   Standards :
--/   Determine that sample must be     Cue No further actions         Same as element.
redone Comments :
Satisfactory                   Unsatisfactory JPM Ouestions Question Answer References Reference Type     Reference ID       Description                                       Ref Flag
 
2 5-May-2 006                                                  Page:
Job Performance Measure Exam                   --
-
JPM NO JS340.021 Event Classification Revision #:   0 Review Date:     5/4/2006 Lo cation:   Simulator Estimated Time (minutes):       15.00 Candidate:
Evaluator:
Evaluator:
Actual Time: -- Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor:
  --
Submitted By Reviewed By Date Date I I _- . - 21 Page: Job Performance Measure Exam 25-May-2006 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS.
Actual Time:
MAKE ALL WIUTTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED.
Trainee Performance:     Satisfactory           Unsatisfactory Trainee:
THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE. Initial Conditions:
Instructor:
The plant experienced the events of the just concluded scenario. Initiating Cues
Submitted By                                       Date Reviewed By                                         Date
: Classify this event at the highest required classification per EPIP 1-0.
 
Page: 3 Job Performance Measure Exam  
I                                                                                     I 25-May-2006 Job Performance Measure Exam                       Page:
-- 25-May-2006 - u
_- . -21 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WIUTTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
The plant experienced the events of the just concluded scenario.
Initiating Cues :
Classify this event at the highest required classification per EPIP 1-0.
 
25-May-2006                                                                              Page:       3 Job Performance Measure Exam                                             --     -
u


== Description:==
== Description:==
Event Classification for the 2006 Initial License exam (JS340.02
Event Classification for the 2006 Initial License exam (JS340.02 1)
: 1) JPM Tasks Task ID: 340-001-05-02N Task Standards
JPM Tasks Task ID: 340-001-05-02N Task Standards :
: Classify per the Nuclear Emergency Response Plan Tools : Terminating; Cues Task Completion Trainee Says Task is Completed References
Classify per the Nuclear Emergency Response Plan Tools :
: ID - - PREPIP EPIP 1-0 Description GINNA STATION EVENT EVALUATION AND CLASSIFICATION Review Date Ref Flag Safetv Considerations Consequences of Inadequate Performance:
Terminating; Cues Task Completion Trainee Says Task is Completed References :
Failure to correctly Classify the event leads to the Failure to correct implement the Emergency plan, resulting in a unnecessary threat to the health and safety of the public. General Comments
- -ID PREPIP         EPIP 1-0 Description GINNA STATION EVENT EVALUATION Review Date Ref Flag AND CLASSIFICATION Safetv Considerations Consequences of Inadequate Performance:
: The JPM is designed to be used with the 2006 Initial NRC License Exam.
Failure to correctly Classify the event leads to the Failure to correct implement the Emergency plan, resulting in a unnecessary threat to the health and safety of the public.
1 I .- 41 Page: Job Performance Measure Exam 25-May-2006 d' Performance Checklist 1 Element : Conditions
General Comments :
: Obtain copy of EPIP 1-0 Comments : Satisfactory Standards
The JPM is designed to be used with the 2006 Initial NRC License Exam.
: May use Procedure or Wall Chart Unsatisfactory 0 ~~ *2 Element: CRITICAL Conditions
 
: Standards
1                                                                                                   I 25-May-2006 Job Performance Measure Exam                                 Page:
: Correctly determine Classification CUE: No futher actions Scenario 06 1 Alert based on RCS Leakage >46 gpm EAL 3.1.2 Scenario 06-1-2 SAE based on Faulted Ruputed S/G EAL 4.2.1 Scenario 06-1 -3 Alert Based on RCS Leakage  
                                                                                                  . -41 d'
> 46 gpm EAL 3.1.2 Comments : -' Satisfactory Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag}}
Performance Checklist 1     Element :                             Conditions :                    Standards :
Obtain copy of EPIP 1-0                                           May use Procedure or Wall Chart Comments :
Satisfactory                    Unsatisfactory 0
      ~~
*2   Element:         CRITICAL             Conditions :                   Standards :
Correctly determine Classification CUE: No futher actions         Scenario 06 1 Alert based on RCS Leakage
                                                                            >46 gpm EAL 3.1.2 Scenario 06- 1-2 SAE based on Faulted Ruputed S/G EAL 4.2.1 Scenario 06-1-3 Alert Based on RCS Leakage
                                                                            > 46 gpm EAL 3.1.2 Comments :
-'
Satisfactory                   Unsatisfactory 0 JPM Questions Question Answer References Reference Type       Reference ID         Description                                       Ref Flag}}

Revision as of 14:45, 23 November 2019

Draft Ginna Exam Aug. 2006 - Section a Operating Exam (Folder 2)
ML062700268
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/03/2006
From:
Ginna
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
References
50-244/06-301 50-244/06-301
Download: ML062700268 (42)


Text

I 1 30-May-2006 Job Performance Measure Exam Page:

-- -I. I JFM NO JR015.004 Perform a Plant Calorimetric per 0-6.3 Revision #: 4 Review Date: 5/30/2006 Location: In Plant Estimated Time (minutes): 20.00 Candidate:

Evaluator:

. d Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

30-MUY-2006 Page: 2 Job Performance Measure Exam -- ~

L/

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The PPCS calorimetric calculation is not operable and the LEFM is not being used.

Initiating Cues :

The Control Room Foreman has directed you to perform a maximum unit power calculation per 0-6.3. For this JPM an Auxiliary Operator will collect field data collect and provide it to you.

Although the PPCS calorimetric calculation function is not operable, the PPCS is operable and may be used as necessary.

W

30-May-2006 Page:

Job Perfurmanee Measure Exam --

'-

Description:

Perform a Plant Calorimetric per 0-6.3 (JR015.004)

JPM Tasks Task ID: 193-001-01-01B Task Standards :

In accordance with the procedure Tools :

Calculator Safety Glasses Hard Hat Hearing Protection Terminating Cues

--. Task Completion References :

-ID Description Review Date Ref Flag PRO 0-6.3 MAXIMUM UNIT POWER PRO 0-6.3.1 STEAM GENERATOR BLOWDOWN CORRECTION FACTOR Safety Considerations Consequences of Inadequate Performance:

Thermal design limit challenge General Comments :

Provide a copy of 0-6.3 and 0-6.3.1

.--

3 0-May-2 006 Page: 4 Job Performance Measure Exam _- . -

Performance Checklist Element : Conditions : Standards :

Obtain current 0-6.3 and 0-6.3.1. NOTE: It is permissible to only Same as element.

obtain Attachment I and I1 of 0-6.3 and Attachment I of 0-6.3.1.

Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Properly collect and record data NOTE: If either RTD is unreliable Obtains data from:

required by 0-6.3 Attachments I (S/G RTD feedwater temperature -PPCS if available and 11. deviation high alarm on PPCS) do -MCB not use RTD data, instead use the -NIS average T/C feedwater temperature and apply for both loops.

Note: Provide Barton Data obtained by the A 0 to the examinee Comments :

Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Properly collect and record data CUE: When Data Properly Obtain the S/G blowdown for Blowdown Correction Factor Collected the hand out per flow, temperature and per 0-6.3.1, Attachment I. collected data for calculations. pressure +/- 20 psig for each S/G from the blowdown panel.

Comments :

Satisfactory Unsatisfactory [7 Element : CRITICAL Conditions : Standards :

Properly perform calculations per 1) Same as element.

0-6.3.1, Attachment I. 2) If interpolate any value between selected rows.

3) Fq +/- .05.

Comments :

Satisfactory Unsatisfactory 0

I 1 30-May-2006 Job Performance Measure Exam Page:

- . -5. I w Element: CRITICAL Conditions : Standards :

Properly perform calculations per NOTE: If action is required per Same as element.

0-6.3, Attachment I and 11. step 5.3.2, DO NOT take action.

Advise the Shift Supervisor or +/- 0.5% of calculated CRF of any problems noted. answer.

Comments :

Satisfactory n Unsatisfactory 0 6 Element : Conditions : Standards :

Recommends appropriate action if Same as element.

100% power.

Comments :

Satisfactory 0 Unsatisfactory 0 7 Element : Conditions : Standards :

Compares calorimetric to NIS, TERMINATING CUE: No further Same as element.

recommends action if action.

disagreement exists.

NOTE: Attach completed 0-6.3 and 0-6.3.1 to this JPM.

Comments :

Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I 25-May-2006 Job Performance Measure Exam Page:

-- -

1

- JPMNO JR341.002 0-6.13 Daily Performance Log Attachment I Revision #: 0 Review Date: 4/28/2006 Location: Simulator Estimated Time (minutes): 15.00 Candidate:

Evaluator:

-

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2 5-M~ry-2 006 Page: - 2 I

Performame Measure Exam -- ~

I

'.d NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

Normal plant monitoring in progress.

Initiating Cues :

Perform 0-6.13 Attachment I Channel Checks and Instrument Verification

25-May-2006 Job Performance Measure Exam Page:

-- .

-3. I

Description:

0-6.13 Daily Performance Logs Attachment (JR341.002)

JPM Tasks Task ID: 119-009-03-01B Task Standards :

Identify switch, meter or component out of required position or band.

Tools :

Terminating Cues Task Completion References :

-ID Description Review Date Ref Flag

--

- ,

PRO 0-6.13 DAILY SURVEILLANCE LOG 0 Safetv Considerations Consequences of Inadequate Performance:

Tech Spec Violation General Comments :

1) Setup the Simulator at any 100% power IC
2) Insert MALF PZR3A, 43%
3) Verify >5% deviation between LT-426 and the other channels
4) Fill out 0-6.13 Attachment I for the last RWST visual check 7/16/06 92%

I 1 25-May-20 06 Job Performance Measure Exam Page:

-- PI

-'

Performance Checklist 1 Element : Conditions : Standards :

Review 0-6.13 Attachment I CUE: give attachment to examinee Same as element Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Perform Attachment I per Locates meters verify procedure parameters are within operability bands and complete Attachment I signoffs Comments :

Satisfactory 0 Unsatisfactory Element : CRITICAL Conditions : Standards :

Recognize that LT-426 is outside Locates LT-426. Determines the acceptance band that the instrument is inoperable per 0-6.13 and SR3.3.1.1 Comments :

Satisfactory Unsatisfactory

~~~

4 Element : Conditions : Standards :

Notify the CRS or SM CUE: No Further Actions Same as Element Comments :

Satisfactory Unsatisfactory 0

I

,

I I

25-May-2006 Job Performance Measure Exum Page: 5

- -

..-l)M Ouestions Question Answer References Reference Type Reference ID Description Ref Flag

I 1 25-May-2006 Job Performance Measure Exam Page:

_-

-l. I

.-..../

JPM NO JR343.005 Control of LCOs for Equipment Out of Service Revision #: 0 Review Date: 4/28/2006 Location: Simulator Estimated Time (minutes): 10.00 Candidate:

Evaluator:

-4 Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I

25-May-2006 Job Performame Measure Exam Page:

-- PI 1

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

Plant is at 55% power, Mini-Purge is not in service, no other equipment has an A-52.4 submitted on it.

Initiating Cues :

Shift Supervisor requests MOV-852A be deemed inoperable and asks you to fill out an A-52.4 to declare the component inoperable. The equipment will be inoperable due to the breaker being found tripped and cannot be reset. Required testing for operability will be determined after investigation of the problem. Use present date and time for when the component is to be deemed

- inoperable.

25-M~~~-2006 Job Performance Measure Exam Page:

-- 3I

-

Description:

Complete a A-52.4 Limiting Conditions for Operablity Evaluation (JR343.005)

JPM Tasks Task ID: 300-003-01-01A Task Standards :

Correctly determine the allowable time out of service for a single component.

Tools :

Terminating Cues Task Completion Trainee Says Task is Completed References :

-ID DescriDtion Review Date Ref Flag I

PRA A-52.4 CONTROL OF LIMITING CONDITIONS OF 0 OPERATIONS TECHSP ITS 3.5.2 ECCS - MODES 1,2, and 3 Safetv Considerations Consequences of Inadequate Performance:

Tech Spec Violation General Comments :

Component Inoperable is the B train of ECCS Tech Spec. 3.5.2

I I 25-May-2006 Job Performance Measure Exam Page:

-- 4I v

Performance Checklist 1 Element : Conditions : Standards :

Obtain a controlled copy of CUE: Give Examinee copy of the Same as Element A-52.4 procedure Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Fill in EIN, Date, and Time Same as element complete step 3.2.1 Comments :

Satisfactory Unsatisfactory 0 3 Element : Conditions : Standards :

Determine Plant mode and Plant Mode is Mode 1 complete step 3.2.2

- Comments:

Satisfactory Unsatisfactory u

  • 4 Element: CRITICAL Conditions : Standards :

Determine Tech Spec Section and Enter corect T.S. in 3.2.3.

fill in step 3.2.3 Tech Spec Section 3.5.2 ECCS Modes 1-3 Comments :

Satisfactory u Unsatisfactory 5 Element : Conditions : Standards :

Perform Loss of Safety Function Determines that no loss of Screening per Attachment I1 fill in safety function exists step 3.2.4 Comments :

Satisfactory Unsatisfactory 0 u - Element : Conditions : Standards :

Records EOOS PFS and System CUE: Colors are both Green Records Colors Colors complete step 3.2.5

25-May-2 006 Job Performance Measure Exam Page:

- 5.- I u-Comments :

Satisfactory 0 Unsatisfactory 0

  • 7 Element: CRITICAL Conditions : Standards :

Determines Required Action time Go To T.S. 3.5.2 from T.S. 3.5.2 complete step Determine that A Train is 3.2.6 operable (Table 3.5.2-1)

Determine Reqired action time from 3.5.2A 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore Record in step 3.2.6 Comments :

Satisfactory 0 Unsatisfactory

  • 8 Element: CRITICAL Conditions : Standards :

Determines Required Action time CUE: No further actions Go to 3.5.2B record time in not met from T.S. 3.5.2 complete step 3.2.13 step 3.2.13 Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Comments :

Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I 1 I

25-May-2006 Job Performance Measure Exam Page:

--

I

-l. 1 v

JPM NO JC119.001 Complete EPIP 1-5 Status Report (PPCS no avalible)

Revision #: 0 Review Date: 5/22/2006 Location: Simulator Estimated Time (minutes): 10.00 Candidate:

Evaluator:

-.-

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

25-May-2006 Page: 2 Job Performance Measure Exam -- ~

.--'

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The Plant was at 100% power when a LOCA occured. An Alert was declared and the Initial notification has been made per EPIP 1-5. The PPCS has failed and the TSC is unable to complete status reports for transmittal. The communicator is currently busy making followup notifications.

Initiating Cues :

The Shift Manager directs you to complete and transmit the plant status report per EPIP 1-5 Attachment 3e.

r 1 25-May-2006 Page:

Job Performance Measure Exam -- - -3.1 L-

Description:

Complete EPIP 1-5 Status Report (PPCS 00s) (JC119.001)

JPM Tasks Task ID: 119-007-03-01A Task Standards :

Correctly complete EPIP 1-5 Attachment 3e data sheet.

Tools :

Terminating Cues The Data sheet is correctly completed References :

-ID Description Review Date Ref Flag PREPIP EPIP 1-5 NOTIFICATIONS CI Safety Considerations Consequences of Inadequate Performance:

Failure to correctly complete the required data sheet will result in the TSC & EOF being unable to assess plant conditions. This results in an inability of those organization to provide the need support the the Control Room and to protect the public.

General Comments :

Setup the Simulator to any at Power IC. Insert a 5000 gpm LOCA and complete E-0. Freeze simulator and record EPIP 1-5 Attachment 3e data for the key.

25-May-2006 Page:

Job Performance Measure Exam -- . -4 1 u.

Performance Checklist 1 Element : Conditions : Standards :

Obtain EPIP 1-5 Procedure and Obtain Procedure review attachment 3e Determine that Attachment 3e must be performed Comments :

Satisfactory 0 Unsatisfactory 0

~

  • 2 Element: CRITICAL Conditions : Standards :

Obtain Data for Attachment 3e Locates MCB indicators and from the Control Room records Data on the indications. attachment Comments :

Satisfactory Unsatisfactory

    • Element: CRITICAL Conditions : Standards :

Transmitts the attachment to the CUE: No further actions Transmits to the TSC via Fax L

TSC or telephone Comments :

Satisfactory 0 Unsatisfactory c]

JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I I 25-May-2006 Job Performance Measure Exam Page:

-- -l. I

\-

JPM NO JS345.001 Respond to a Hazardous Chemical Spill Revision #: 0 Review Date: 5/22/2006 Location: In Plant Estimated Time (minutes): 15.00 Candidate:

Evaluator:

.---- .

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I 25-iMry-2006 Page:

I Performance Measure Exam --

J d'

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES, ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is operating durring normal conditions 100% power. Dayshift Midweek. You are the Shift ,Manager.

Initiating Cues :

The Stockroom notifies you that they were transporting 2 barrels of Hydrazine from the Warehouse to the Turbine Building. While decending the hill near the Outside Condensate Storage tank one of the barrels fell off the pallet and is leaking.

I I 25-May-2006 Job Performance Measure Exam Page:

--

-3. I

'y

Description:

Respond to a Hazardous Chemical spill JPM Tasks Task ID: 345-001-05-03A Task Standards :

Implement IP-ENV-3 to contain the spill and notify appropriate responders.

Tools :

TerminatinE Cues Task Completion References :

-ID Descrbtion Review Date Ref Flag PRIP IP-ENV-3 RESPONSE TO A SPILL OF HAZARDOUS L-MATERIAL/WASTE Safetv Considerations Consequences of Inadequate Performance:

Failure to mitigate the effects of a Chemical Spill result in an increase in risk to plant personnel and the public.

General Comments :

25-May-2006 Page: 4 Job Performance Measure Exam -- ~

W-Performance Checklist 1 Element : Conditions : Standards :

Obtain Copy of IP-ENV-3. Go to Same as Element the spill response section Comments :

Satisfactory Unsatisfactory Iz]

  • 2 Element : CRITICAL Conditions : Standards :

Announce spill over PA system CUE: Announcement is made. Makes the announcement or direct operator to make the annoucement Comments :

Satisfactory 0 Unsatisfactory 0

  • 3 Element : CRITICAL Conditions : Standards :

Dispatches Personnel to evaluate CUE: Personnel Contacted Contacts one of the following the spill. to evaluate the spill:

--.

-NLO Note: Give the following Cue to -Chemical Control the SM after the evaluator has been Coordinator dispatched. -Safety Group

-Chemistry Group CUE: The spill evaluator reports the following;

1. The barrel split open spilling 112 its 35 gal contents.
2. Some of the contents ran into the storm drain located North of the outside CST.
3. The Forklift operator breathed in fumes from the chemical and is feeling ill, he is now in the TSC.
4. The material involed is SCAVOX 35% Hydrazine.
5. The HazMat Coordinator is on scene attempting to contain the spill.

-.

Comments :

Satisfactory Unsatisfactory 0

25-May-2006 Job Performance Memure Exam Page:

-- - -51

-/ Element: CRITICAL Conditions : Standards :

Announces a Medical Emergency Note: When the Medical Make or Direct annoucement Announcement is made give the for Medical Response team to following cue. report to the TSC CUE: The CRS is refering to A-7 "Handling Injuries and Medical Emergencies and the associated notifications Comments :

Satisfactory 0 Unsatisfactory [7

  • 5 Element: CRITICAL Conditions : Standards :

Determines that the spill is major Determine that per attachment 1 and step 3.3.3 A. 2. that the spill is major.

Comments :

Satisfactory 0 Unsatisfactory

~ ~

Element : CRITICAL Conditions : Standards :

Perform Major spill action (not CUE: When notification made to Obtains MSDS sheet for the previously done) the Response coordinator- chemical MaryEllen Dangler has been Completes Attachment 2 notified and is acting as Notifies the Response Coordinator and Enviromental coordinator and Enviromental response team leader. staff Comments :

Satisfactory Unsatisfactory 0 7 Element : Conditions : Standards :

Evaluate the spill for EPIP 1-0 CUE: No Further Actions Detemine that no classifiction reporti bility critera was exceeded Comments :

Satisfactory Unsatisfactory 0

I 25-May-2006 Job Performance Measure Exam Page:

-- ~

1 JPM NO JS343.006 Loss Of Safety Function Determination Revision #: 0 Review Date: 5/22/2006 Location: Classroom Estimated Time (minutes): 10.00 Candidate:

Evaluator:

. --- .

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

25-MUY-2006 Page: 2 Pmformance Measure Exam -- ~

V '

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

100% Power normal operations. The following equipment is 00s "D"SW pump "B"CNMT Recirc Fan MOV 852A Initiating Cues :

The MCC 1D Supply Breaker trips and cannot be reset. MCC 1D is deenergized. What action must be taken per Tech Specs?

-

1 25-May-2 006 Job Performance Measure Exam Page:

-- -- I

Description:

Loss of Safety Function Determination JPM Tasks Task ID: 300-003-03-02C Task Standards :

Correctly Identify that a loss of Safety Function Exists Tools :

Terminating Cues Task Completion Trainee Says Task is Completed References :

-ID Description Review Date Ref Flag PRA A-52.4 CONTROL OF LIMITING CONDITIONS OF OPERATIONS TECHSP ITS 3.5.2 ECCS - MODES 1,2, and 3 TECHSP ITS 3.6.6 Containmen Spray (CS), Contaiment Recirculation Fan Cooler (CRFC), NaOH, and Containment Post-Accident Charcoal Systems TECHSP ITS 3.7.8 Service Water System CI TECHSP ITS 3.8.9 Distribution Systems - MODES 1,2,3, and 4 0 Safety Considerations Consequences of Inadequate Performance:

Tech Spec Violation General Comments :

I I 25-May-2006 Job Performance Measure Exam Page:

-- 4 I

--.

Performance Checklist 1 Element : Conditions : Standards :

Obtain Copy of Tech Specs and Same As Element A-53.4 Comments :

Satisfactory Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Per TS 3.8.9 determine that "B" Same as Element train of AC power Dist is inoperable Comments :

Satisfactory Unsatisfactory c]

3 Element : Conditions : Standards :

Fill out A52.4 steps3.2.1-3.2.3 Same as Element

--

Comments :

Satisfactory Unsatisfactory c]

  • 4 Element: CRITICAL Conditions : Standards :

Perform Saferty Function Evaluate 00s equipment evaluation (per Attachment 11) 1) SW pump D- Not in SW spec. therefore 3.8.9 gives guidence

2) "B" Recirc Fan All other fans have normal power supplies therefore do not have a loss of safety function.

3 ) MOV 852A, MCC 1D supplies MOV 852B therefore both trains of RHR are incapable of injection and inoperable.

Comments :

Satisfactory Unsatisfactory c]

25-May-2006 Page: 5 Job Performance Measure Exam - . -

.-. Element: CRITICAL Conditions : Standards :

Determine both trains of SI Cue: No further actions Same as Element iooperable enter TS 3.5.2B which directs to TS 3.0.3 Comments :

Satisfactory Unsatisfactory JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

1 I 22-Mi~y-2006 Job Performance Measure Exam Page:

--

-l. I JPM NO JS119.0Oi Verify Equipment Tagout Boundary Revision#: 0 Review Date: 4/28/2006 Location: Classroom Estimated Time (minutes): 10.00 Candidate:

Evaluator:

  • . -

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

22-May-2006 Job Performance Measure Exam Page:

-- 2. I 1,.

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAh4INEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

Condensate transfer pump (PCD04) requires pump bearing replacement.

Initiating Cues :

The SM has requested you review the completed Isolated Work Area Request (A- 1401, Figure

1) for isolating the Condensate Transfer Pump (PCD04) to veri@ work area boundaries.

22-May-2006 Job Performance Measure Exam Page:

--  :.I b..

Description:

Review Isolated Work Area Request(JS 1 19.001)

JPM Tasks Task ID: 342-004-03-02A Task Standards :

1) Determine adequate boundary exists
2) Determine inadequate boundary exists Tools :

P&ID 33013-1234 P-12 Terminating Cues Trainee Says Task is Completed Task Completion v

References :

-ID Description Review Date Ref Flag PROPSA A-1401 STATION HOLDING RULES 0 PRP P-12 ELECTRICAL SYSTEMS PRECAUTIONS, 0 LIMITATIONS, AND SETPOINTS Safety Considerations Consequences of Inadequate Performance:

Personal Injury Equipment Damage General Comments :

Provide P&ID and A-1401 Figure 1 to student. Incorporate errors on A-1401 Figure 1 if it is desired to exercise Option 2.

d'

22-May-2006 Page: 4 Job Performance Measure Exam

~~

- -

v Performance Checklist 1 Element : Conditions : Standards :

Review Isolated Work Boundary. Same as element.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Option 1 - Boundary is adequate. CUE: No further actions Option 1 - Determines no Option 2 - Boundary is not errors in boundary.

adequate. Option 2 - Determines and reports errors in boundary.

V-4046 needs to be closed.

Comments :

Satisfactory 0 Unsatisfactory 0 M Questions

._

Question Answer References Reference Type Reference ID Description Ref Flag

25-May-2006 Job Performance Measure Exam Page:

-- -:I U

JPM NO JS341.002 Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)

Revision #: 1 Review Date: 5/22/2006 Location: Classroom Estimated Time (minutes): 10.00 Candidate:

Evaluator:

I Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

25-May-2006 Job Performance Measure Exam Page:

--

-:I

-'

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE 'IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF P M REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The operating crew is preparing to release a Monitor Tank.

Initiating Cues :

You are the Shift Manager and are required to review a release form prior to making a Liquid Release of the Monitor Tank per CH-RETS-LIQ-REL "Liquid Waste Release" Figure V

I 1 25-May-2006 Job Performance Measure Exam Page:

-- -:I L

Description:

Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)

JPM Tasks Task ID: 341-012-03-03A Task Standards :

Detects errors in the permit and does not approve the permit until corrected.

Tools :

Terminating; Cues Task Completion References :

-

ID Descrbtion Review Date Ref Flag PRCH CH-RETS-LIQ-REL LIQUID WASTE RELEASE CI Safetv Considerations Consequences of Inadequate Performance:

Exceeding Release rate for a Liquid Release General Comments :

Complete a CH-RETS-LIQ-REL Attachment V for pre release condition. (May obtain RP assistance) compete pre release parts correctly except @r the sample time being >12 hour prior to the start of the release.

I 25-May-2006 Page: 4 Job Performance Measure Exam - -

--.

Performance Checklist 1 Element : Conditions : Standards :

Reviews CH-RETS-LIQ-REL Same as element form.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRTTICAL Conditions : Standards :

Evaluate Attacment V for correct Determines the form is Data incorrect in that the release time is outside the allowable time permited. (> 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> since the sample time)

Comments :

Satisfactory Unsatisfactory [7 Element : Conditions : Standards :

--/ Determine that sample must be Cue No further actions Same as element.

redone Comments :

Satisfactory Unsatisfactory JPM Ouestions Question Answer References Reference Type Reference ID Description Ref Flag

2 5-May-2 006 Page:

Job Performance Measure Exam --

-

JPM NO JS340.021 Event Classification Revision #: 0 Review Date: 5/4/2006 Lo cation: Simulator Estimated Time (minutes): 15.00 Candidate:

Evaluator:

--

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I 25-May-2006 Job Performance Measure Exam Page:

_- . -21 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WIUTTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant experienced the events of the just concluded scenario.

Initiating Cues :

Classify this event at the highest required classification per EPIP 1-0.

25-May-2006 Page: 3 Job Performance Measure Exam -- -

u

Description:

Event Classification for the 2006 Initial License exam (JS340.02 1)

JPM Tasks Task ID: 340-001-05-02N Task Standards :

Classify per the Nuclear Emergency Response Plan Tools :

Terminating; Cues Task Completion Trainee Says Task is Completed References :

- -ID PREPIP EPIP 1-0 Description GINNA STATION EVENT EVALUATION Review Date Ref Flag AND CLASSIFICATION Safetv Considerations Consequences of Inadequate Performance:

Failure to correctly Classify the event leads to the Failure to correct implement the Emergency plan, resulting in a unnecessary threat to the health and safety of the public.

General Comments :

The JPM is designed to be used with the 2006 Initial NRC License Exam.

1 I 25-May-2006 Job Performance Measure Exam Page:

. -41 d'

Performance Checklist 1 Element : Conditions : Standards :

Obtain copy of EPIP 1-0 May use Procedure or Wall Chart Comments :

Satisfactory Unsatisfactory 0

~~

  • 2 Element: CRITICAL Conditions : Standards :

Correctly determine Classification CUE: No futher actions Scenario 06 1 Alert based on RCS Leakage

>46 gpm EAL 3.1.2 Scenario 06- 1-2 SAE based on Faulted Ruputed S/G EAL 4.2.1 Scenario 06-1-3 Alert Based on RCS Leakage

> 46 gpm EAL 3.1.2 Comments :

-'

Satisfactory Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag