ML063210050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/17/2006
| issue date = 11/17/2006
| title = Assessment Follow-Up Letter - Calvert Cliffs Nuclear Power Plant
| title = Assessment Follow-Up Letter - Calvert Cliffs Nuclear Power Plant
| author name = Lew D C
| author name = Lew D
| author affiliation = NRC/RGN-I/DRP
| author affiliation = NRC/RGN-I/DRP
| addressee name = Spina J A
| addressee name = Spina J
| addressee affiliation = Constellation Generation Group
| addressee affiliation = Constellation Generation Group
| docket = 05000317
| docket = 05000317
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:November 17, 2006Mr. James A. Spina, Vice PresidentCalvert Cliffs Nuclear Power Plant, Inc.
{{#Wiki_filter:November 17, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702


Line 23: Line 23:
==Dear Mr. Spina:==
==Dear Mr. Spina:==


On November 3, 2006, the NRC staff completed, as part of our quarterly review, an update ofour assessment of Calvert Cliffs Nuclear Power Plant. The assessment evaluated performance indicators (PIs) and inspection results. The purpose of this letter is to inform you of your safety performance during this period and our plans for a future inspection at your facility. This letter supplements, but does not supercede, our mid-cycle assessment letter issued on August 31, 2006.On October 27, 2006, the NRC staff forwarded a letter concerning the final significancedetermination of a white inspection finding in the mitigating system cornerstone. This self-revealing finding involved inadequate design control during the establishment of the over-current trip setting for an electrical circuit breaker that supplies power to the support systems for the 1A emergency diesel generator (EDG). The low over-current trip setting would have impacted the capability of the 1A EDG to perform its intended safety function during certain design basis events at Calvert Cliffs Unit 1.As a result of our review, we have assessed Calvert Cliffs Unit 1 performance to be in theRegulatory Response of the NRC's Action Matrix. On November 15, 2006, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the inadequate design control for the 1A EDG, after January 1, 2007.
On November 3, 2006, the NRC staff completed, as part of our quarterly review, an update of our assessment of Calvert Cliffs Nuclear Power Plant. The assessment evaluated performance indicators (PIs) and inspection results. The purpose of this letter is to inform you of your safety performance during this period and our plans for a future inspection at your facility. This letter supplements, but does not supercede, our mid-cycle assessment letter issued on August 31, 2006.
On October 27, 2006, the NRC staff forwarded a letter concerning the final significance determination of a white inspection finding in the mitigating system cornerstone. This self-revealing finding involved inadequate design control during the establishment of the over-current trip setting for an electrical circuit breaker that supplies power to the support systems for the 1A emergency diesel generator (EDG). The low over-current trip setting would have impacted the capability of the 1A EDG to perform its intended safety function during certain design basis events at Calvert Cliffs Unit 1.
As a result of our review, we have assessed Calvert Cliffs Unit 1 performance to be in the Regulatory Response of the NRCs Action Matrix. On November 15, 2006, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the inadequate design control for the 1A EDG, after January 1, 2007.
Therefore, we plan to conduct supplemental inspection 95001 beginning on January 22, 2007.
Therefore, we plan to conduct supplemental inspection 95001 beginning on January 22, 2007.
This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will bemade available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
2 J. SpinaPlease contact Brian J. McDermott at 610-337-5233 with any questions you may haveregarding this letter.Sincerely, /RA/David C. Lew, DirectorDivision of Reactor ProjectsDocket Nos. 50-317License Nos. DPR-53 cc:M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2) 3 J. SpinaPlease contact Brian J. McDermott at 610-337-5233 with any questions you may haveregarding this letter.Sincerely, David C. Lew, DirectorDivision of Reactor ProjectsDocket Nos. 50-317License Nos. DPR-53 cc:M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)Distribution: (via E-mail)S. Collins, RAM. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR R. Guzman, PM, NRR (Backup)
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
J. Spina                                        2 Please contact Brian J. McDermott at 610-337-5233 with any questions you may have regarding this letter.
Sincerely,
                                              /RA/
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317 License Nos. DPR-53 cc:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)
 
J. Spina                                              3 Please contact Brian J. McDermott at 610-337-5233 with any questions you may have regarding this letter.
Sincerely, David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317 License Nos. DPR-53 cc:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)
Distribution: (via E-mail)
S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR R. Guzman, PM, NRR (Backup)
B. McDermott, DRP A. Burritt, DRP S. Kennedy, DRP, SRI C. Newgent - Resident OA Region I Docket Room (with concurrences)
B. McDermott, DRP A. Burritt, DRP S. Kennedy, DRP, SRI C. Newgent - Resident OA Region I Docket Room (with concurrences)
R. Gibbs, Chief, NRR/ADRO/DRS/IRIB RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2SUNSI Review Complete:               ALB             (Reviewer's Initials
R. Gibbs, Chief, NRR/ADRO/DRS/IRIB RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2 SUNSI Review Complete:                     ALB           (Reviewers Initials)
)DOCUMENT NAME: C:\FileNet\ML063210050.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
DOCUMENT NAME: C:\FileNet\ML063210050.wpd After declaring this document An Official Agency Record it will be released to the Public.
" C" = Copy without attachment/enclosure  
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE          RI/DRP              RI/DRP                    RI/DRS                    RI/DRP NAME            ABurritt            BMcDermott                JRogge                    DLew DATE            11/15/06              11/15/06                11/ 16/06                11/16/06 OFFICIAL RECORD COPY}}
                                                                                      " E" = Copy with attachment/enclosure   " N" = No copyOFFICERI/DRPRI/DRPRI/DRSRI/DRPNAMEABurrittBMcDermottJRoggeDLewDATE11/15/0611/15/0611/ 16/0611/16/06OFFICIAL RECORD COPY}}

Latest revision as of 12:58, 23 November 2019

Assessment Follow-Up Letter - Calvert Cliffs Nuclear Power Plant
ML063210050
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/17/2006
From: David Lew
Division Reactor Projects I
To: Spina J
Constellation Generation Group
References
Download: ML063210050 (3)


Text

November 17, 2006 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT:

Assessment Follow-Up Letter - Calvert Cliffs Nuclear Power Plant

Dear Mr. Spina:

On November 3, 2006, the NRC staff completed, as part of our quarterly review, an update of our assessment of Calvert Cliffs Nuclear Power Plant. The assessment evaluated performance indicators (PIs) and inspection results. The purpose of this letter is to inform you of your safety performance during this period and our plans for a future inspection at your facility. This letter supplements, but does not supercede, our mid-cycle assessment letter issued on August 31, 2006.

On October 27, 2006, the NRC staff forwarded a letter concerning the final significance determination of a white inspection finding in the mitigating system cornerstone. This self-revealing finding involved inadequate design control during the establishment of the over-current trip setting for an electrical circuit breaker that supplies power to the support systems for the 1A emergency diesel generator (EDG). The low over-current trip setting would have impacted the capability of the 1A EDG to perform its intended safety function during certain design basis events at Calvert Cliffs Unit 1.

As a result of our review, we have assessed Calvert Cliffs Unit 1 performance to be in the Regulatory Response of the NRCs Action Matrix. On November 15, 2006, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the inadequate design control for the 1A EDG, after January 1, 2007.

Therefore, we plan to conduct supplemental inspection 95001 beginning on January 22, 2007.

This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

J. Spina 2 Please contact Brian J. McDermott at 610-337-5233 with any questions you may have regarding this letter.

Sincerely,

/RA/

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317 License Nos. DPR-53 cc:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)

J. Spina 3 Please contact Brian J. McDermott at 610-337-5233 with any questions you may have regarding this letter.

Sincerely, David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317 License Nos. DPR-53 cc:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel State of Maryland (2)

Distribution: (via E-mail)

S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR R. Guzman, PM, NRR (Backup)

B. McDermott, DRP A. Burritt, DRP S. Kennedy, DRP, SRI C. Newgent - Resident OA Region I Docket Room (with concurrences)

R. Gibbs, Chief, NRR/ADRO/DRS/IRIB RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2 SUNSI Review Complete: ALB (Reviewers Initials)

DOCUMENT NAME: C:\FileNet\ML063210050.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRS RI/DRP NAME ABurritt BMcDermott JRogge DLew DATE 11/15/06 11/15/06 11/ 16/06 11/16/06 OFFICIAL RECORD COPY