ML070600317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML070600317
| number = ML070600317
| issue date = 03/01/2007
| issue date = 03/01/2007
| title = Brunswick Inspection / Activity Plan, 03/01/2007 - 09/30/2008, Report 22
| title = Inspection / Activity Plan, 03/01/2007 - 09/30/2008, Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Brunswick Inspection / Activity Plan 03/01/2007
{{#Wiki_filter:Page 1 of 2                                                                                    Brunswick 03/01/2007    10:29:11                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type PSB1-RP       - RP OCCUPATIONAL BASELINE INSP- WK1                                                         2 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                   03/05/2007 03/09/2007 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                           03/05/2007 03/09/2007 Baseline Inspections 1, 2           IP 7112202               Radioactive Material Processing and Transportation                                   03/05/2007 03/09/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                   03/05/2007 03/09/2007 Baseline Inspections EB3-ISI       - U2 INSERVICE INSPECTION                                                                   1 2          IP 7111108G              Inservice Inspection Activities - BWR                                                03/12/2007 03/16/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL OCCUPATIONAL INSP- WK2                                                     3 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                   03/19/2007 03/23/2007 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                           03/19/2007 03/23/2007 Baseline Inspections 1, 2           IP 7112202               Radioactive Material Processing and Transportation                                   03/19/2007 03/23/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                   03/19/2007 03/23/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                         3 1                V23267                BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES                                          06/25/2007 06/29/2007 Not Applicable OL EXAM        - INITIAL EXAM                                                                              4 1                 V23267               BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES                                         07/16/2007 07/27/2007 Not Applicable EB1-CDBI       - COMPONENT DESIGN BASES INSPECTION                                                         7 1, 2          IP 7111121              Component Design Bases Inspection                                                    10/22/2007 10/26/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                     11/05/2007 11/09/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                     11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                     12/10/2007 12/14/2007 Baseline Inspections PSB1-EP       - EP INSP                                                                                   1 1, 2           IP 7111402               Alert and Notification System Testing                                                 11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 7111403               Emergency Response Organization Augmentation Testing                                 11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                                     11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                     11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 71151-EP01           Drill/Exercise Performance                                                           11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 71151-EP02           ERO Drill Participation                                                               11/26/2007 11/30/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                 1 1, 2          IP 7111107B              Heat Sink Performance                                                                01/28/2008 02/01/2008 Baseline Inspections EB3-ISI       - UNIT 1 - ISI                                                                               1 1              IP 7111108G              Inservice Inspection Activities - BWR                                                03/10/2008 03/14/2008 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK 1                                                           2 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                   03/10/2008 03/14/2008 Baseline Inspections 1, 2           IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                         03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.                                                                                   Enclosure This report shows only on-site and announced inspection procedures.
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 10:29:11 Report 22 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP- WK1 Baseline Inspections 03/05/2007 03/09/2007 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1, 2   7112102 IP A LARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1, 2   7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/05/2007 03/09/2007 1, 2   71151 IP Performance Indicator Verification 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2  7111108G IP Inservice Inspection Activities - BWR 3 PSB1-RP-RP OCCUPATIONAL OCCUPATIONAL INSP- WK2 Baseline Inspections 03/19/2007 03/23/2007 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/19/2007 03/23/2007 1, 2   7112102 IP A LARA Planning and Controls Baseline Inspections 03/19/2007 03/23/2007 1, 2   7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/19/2007 03/23/2007 1, 2   71151 IP Performance Indicator Verification 3 OL PREP-INITIAL EXAM PREP Not Applicable 06/25/2007 06/29/2007 1     V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 4 OL EXAM-INITIAL EXAM Not Applicable 07/16/2007 07/27/2007 1    V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 7 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 11/26/2007 11/30/2007 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 12/10/2007 12/14/2007 1, 2  7111121 IP Component Design Bases Inspection 1 PSB1-EP-EP INSP Baseline Inspections 11/26/2007 11/30/2007 1, 2   7111402 IP A lert and Notification System Testing Baseline Inspections 11/26/2007 11/30/2007 1, 2   7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 11/26/2007 11/30/2007 1, 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/26/2007 11/30/2007 1, 2   7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 11/26/2007 11/30/2007 1, 2   71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/26/2007 11/30/2007 1, 2   71151-EP02 IP ERO Drill Participation 1 EB3-HS-HEAT SINK Baseline Inspections 01/28/2008 02/01/2008 1, 2  7111107B IP Heat Sink Performance 1 EB3-ISI-UNIT 1 - ISI Baseline Inspections 03/10/2008 03/14/2008 1    7111108G IP Inservice Inspection Activities - BWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
Page 2 of 2                                                                                    Brunswick 03/01/2007    10:29:11                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                                        No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End            Type PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK 1                                                                           2 1, 2           IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             03/10/2008 03/14/2008 Baseline Inspections 1, 2           IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             03/10/2008 03/14/2008 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                                   03/10/2008 03/14/2008 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK 2                                                                           3 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                                   03/24/2008 03/28/2008 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                                         03/24/2008 03/28/2008 Baseline Inspections 1, 2           IP 7112202               Radioactive Material Processing and Transportation                                                   03/24/2008 03/28/2008 Baseline Inspections 1, 2           IP 71151-OR01           Occupational Exposure Control Effectiveness                                                         03/24/2008 03/28/2008 Baseline Inspections 1, 2           IP 71151-PR01           RETS/ODCM Radiological Effluent                                                                     03/24/2008 03/28/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59                                                                                       4 1, 2           IP 7111102               Evaluation of Changes, Tests, or Experiments                                                         04/14/2008 04/18/2008 Baseline Inspections 1, 2           IP 7111117B             Permanent Plant Modifications                                                                       04/14/2008 04/18/2008 Baseline Inspections EB3-ME         - MAINTENANCE EFFECTIVENESS                                                                                 1 1, 2          IP 7111112B              Maintenance Effectiveness                                                                            05/19/2008 05/23/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Brunswick Inspection / Activity Plan 03/01/2007
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 10:29:11 Report 22 2 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1, 2   71151 IP Performance Indicator Verification 3 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 Baseline Inspections 03/24/2008 03/28/2008 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1, 2   7112102 IP A LARA Planning and Controls Baseline Inspections 03/24/2008 03/28/2008 1, 2   7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/24/2008 03/28/2008 1, 2   71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 03/24/2008 03/28/2008 1, 2   71151-PR01 IP RETS/ODCM Radiological Effluent 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 04/14/2008 04/18/2008 1, 2   7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 04/14/2008 04/18/2008 1, 2   7111117B IP Permanent Plant Modifications 1 EB3-ME-MAINTENANCE EFFECTIVENESS Baseline Inspections 05/19/2008 05/23/2008 1, 2  7111112B IP Maintenance Effectiveness This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 10:03, 23 November 2019

Inspection / Activity Plan, 03/01/2007 - 09/30/2008, Report 22
ML070600317
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/01/2007
From:
Division Reactor Projects II
To:
Carolina Power & Light Co
Shared Package
ML070600304 List:
References
Download: ML070600317 (2)


Text

Page 1 of 2 Brunswick 03/01/2007 10:29:11 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL BASELINE INSP- WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/05/2007 03/09/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/12/2007 03/16/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL OCCUPATIONAL INSP- WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 06/25/2007 06/29/2007 Not Applicable OL EXAM - INITIAL EXAM 4 1 V23267 BRUNSWICK/JULY 2007 EXAM AT POWER FACILITIES 07/16/2007 07/27/2007 Not Applicable EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP 7111121 Component Design Bases Inspection 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 12/10/2007 12/14/2007 Baseline Inspections PSB1-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/26/2007 11/30/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 01/28/2008 02/01/2008 Baseline Inspections EB3-ISI - UNIT 1 - ISI 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Brunswick 03/01/2007 10:29:11 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/10/2008 03/14/2008 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/24/2008 03/28/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/24/2008 03/28/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/24/2008 03/28/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/24/2008 03/28/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/24/2008 03/28/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 04/14/2008 04/18/2008 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 04/14/2008 04/18/2008 Baseline Inspections EB3-ME - MAINTENANCE EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 05/19/2008 05/23/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.