IR 05000348/2007401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams|number = ML070940200}}
{{Adams
| number = ML070940200
| issue date = 03/30/2007
| title = NRC Security Inspection Report 05000348/2007401 and 05000364/2007401
| author name = Munday J
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Johnson J
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| license number = NPF-002, NPF-008
| contact person =
| case reference number = EA-06-057, EA-06-058, EA-06-059
| document report number = IR-07-401
| document type = Inspection Report Correspondence, Letter
| page count = 3
}}


{{IR-Nav| site = 05000348 | year = 2007 | report number = 401 }}
{{IR-Nav| site = 05000348 | year = 2007 | report number = 401 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:rch 30, 2007
[[Issue date::March 30, 2007]]


EA-06-057EA-06-058 EA-06-059Southern Nuclear Operating Company, Inc.ATTN:Mr. J. Randy JohnsonVice President - Farley7388 North State Highway 95 Columbia, AL 36319
==SUBJECT:==
FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2007401 AND 05000364/2007401


SUBJECT: FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT05000348/2007401 AND 05000364/2007401
==Dear Mr. Johnson:==
On March 2, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Farley Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. Bargeron and other members of your staff on March 2, 2007.


==Dear Mr. Johnson:==
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
On March 2, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Farley Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. Bargeron and other members of your staff on March 2, 2007. This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection no findings of significance were identified.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection no findings of significance were identified.The enclosed inspection report documents the inspection results, which were discussed at theexit meeting with Mr. Bargeron, and other members of your staff on March 2, 2007. In addition, this inspection report documents, for administrative purposes only, an issue previously identified in a letter dated November 16, 2006, from Region II Regional Administrator, William D. Travers, to Mr. H.L. Sumner of Southern Nuclear Operating Company. SNC2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390 a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).Should you have any questions concerning this letter, please contact us.
The enclosed inspection report documents the inspection results, which were discussed at the exit meeting with Mr. Bargeron, and other members of your staff on March 2, 2007. In addition, this inspection report documents, for administrative purposes only, an issue previously identified in a letter dated November 16, 2006, from Region II Regional Administrator, William D. Travers, to Mr. H.L. Sumner of Southern Nuclear Operating Company. SNC    2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.


Sincerely,/RA/Joel T. Munday, ChiefPlant Support Branch 2 Division of Reactor SafetyDocket No.: 50-348, 50-364License No:NPF-2, NPF-8
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).


===Enclosure:===
Should you have any questions concerning this letter, please contact us.
NRC Inspection Report No. 05000348/2007401 and 05000364/2007401


===w/Attachment:===
Sincerely,
Supplemental Information cc w/encl:B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.
/RA/
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-348, 50-364 License No: NPF-2, NPF-8 Enclosure: NRC Inspection Report No. 05000348/2007401 and 05000364/2007401 w/Attachment: Supplemental Information cc w/encl:
B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.


42 Inverness Center Parkway Birmingham, AL 35201-1295(cc w/encl cont'd - See page 3) SNC3 (cc w/encl cont'd)General Manager, Farley Plant Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway Birmingham, AL 35201-1295 (cc w/encl contd - See page 3) SNC  3 (cc w/encl contd)
General Manager, Farley Plant Southern Nuclear Operating Company, Inc.


P. O. Box 1295 Birmingham, AL 35201-1295J. T. GasserExecutive Vice President Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.


P. O. Box 1295 Birmingham, AL 35201-1295Bentina C. TerrySouthern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 Bentina C. Terry Southern Nuclear Operating Company, Inc.


Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295cc w/o encl:State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017M. Stanford BlantonBalch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201William D. OldfieldQuality Assurance Supervisor Southern Nuclear Operating Company P. O. Box 470 Ashford, AL 36312
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 cc w/o encl:
State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company P. O. Box 470 Ashford, AL 36312
}}
}}

Latest revision as of 08:42, 23 November 2019

NRC Security Inspection Report 05000348/2007401 and 05000364/2007401
ML070940200
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/2007
From: Joel Munday
NRC/RGN-II/DRS/PSB2
To: Jerrica Johnson
Southern Nuclear Operating Co
References
EA-06-057, EA-06-058, EA-06-059 IR-07-401
Download: ML070940200 (3)


Text

rch 30, 2007

SUBJECT:

FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2007401 AND 05000364/2007401

Dear Mr. Johnson:

On March 2, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Farley Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. Bargeron and other members of your staff on March 2, 2007.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection no findings of significance were identified.

The enclosed inspection report documents the inspection results, which were discussed at the exit meeting with Mr. Bargeron, and other members of your staff on March 2, 2007. In addition, this inspection report documents, for administrative purposes only, an issue previously identified in a letter dated November 16, 2006, from Region II Regional Administrator, William D. Travers, to Mr. H.L. Sumner of Southern Nuclear Operating Company. SNC 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-348, 50-364 License No: NPF-2, NPF-8 Enclosure: NRC Inspection Report No. 05000348/2007401 and 05000364/2007401 w/Attachment: Supplemental Information cc w/encl:

B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

42 Inverness Center Parkway Birmingham, AL 35201-1295 (cc w/encl contd - See page 3) SNC 3 (cc w/encl contd)

General Manager, Farley Plant Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295 J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295 Bentina C. Terry Southern Nuclear Operating Company, Inc.

Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 cc w/o encl:

State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company P. O. Box 470 Ashford, AL 36312