ML071430305: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML071430305
| number = ML071430305
| issue date = 04/25/2007
| issue date = 04/25/2007
| title = Pilgrim Nuclear Power Station, Technical Specifications, Limiting Conditions for Operation
| title = Technical Specifications, Limiting Conditions for Operation
| author name = Kim J S
| author name = Kim J
| author affiliation = NRC/NRR/ADRO/DORL/LPLA
| author affiliation = NRC/NRR/ADRO/DORL/LPLA
| addressee name = Kansler M
| addressee name = Kansler M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:TABLE OF CONTENTS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
{{#Wiki_filter:TABLE OF CONTENTS LIMITING CONDITIONS FOR OPERATION                   SURVEILLANCE REQUIREMENTS 3.6   PRIMARY SYSTEM BOUNDARY                           4.6     3/4.6-1 A. Thermal and Pressurization Limitations             A       3/4.6-1 B. Coolant Chemistry                                   B       3/4.6-3 C. Coolant Leakage                                     C       3/4.6-4 D. Safety and Relief Valves                           D       3/4.6-6 E. Jet Pumps                                           E       3/4.6-7 F. Recirculation Loops Operating                       F       3/4.6-8 BASES                                                       B3/4.6-1 3.7   CONTAINMENT SYSTEMS                               4.7     3/4.7-1 A. Primary Containment                                 A       3/4.7-1 B. Standby Gas Treatment System and Control           B Room High Efficiency Air Filtration System               3/4.7-11 C. Secondary Containment                               C     3/4.7-16 BASES                                                       B3/4.7-1 3.8   PLANT SYSTEMS                                     4.8     3/4.8-1 3.8.1 Main Condenser Offgas                             4.8.1   3/4.8-1 3.8.2 Mechanical Vacuum Pump                           4.8.2   3/4.8-2 BASES                                                     B3/4.8-1 3.9   AUXILIARY ELECTRICAL SYSTEM                         4.9     3/4.9-1 A. Auxiliary Electrical Equipment                     A     3/4.9-1 B. Operation with Inoperable Equipment                 B     3/4.9-4 BASES                                                     B3/4.9-1 3.10   CORE ALTERATIONS                                 4.10     3/4.10-1 A. Refueling Interlocks                               A     3/4.10-1 B. Core Monitoring                                     B     3/4.10-1 C. Spent Fuel Pool Water Level                         C     3/4.10-2 BASES                                                     B3/4.10-1 3.11 REACTOR FUEL ASSEMBLY                             4.11     3/4.11-1 A. Average Planar Linear Heat Generation Rate           A (APLHGR)                                                 3/4.11-1 B. Linear Heat Generation Rate (LHGR)                   B     3/4.11-2 C. Minimum Critical Power Ratio (MCPR)                 C     3/4.11-2 D. Power/Flow Relationship During Power                 D Operation                                               3/4.11-4 BASES                                                       B3/4.1 1-1 Amendment No.-179, 219, 224     228       ii}}
 
===3.6 PRIMARY===
SYSTEM BOUNDARY 4.6 3/4.6-1 A. Thermal and Pressurization Limitations A 3/4.6-1 B. Coolant Chemistry B 3/4.6-3 C. Coolant Leakage C 3/4.6-4 D. Safety and Relief Valves D 3/4.6-6 E. Jet Pumps E 3/4.6-7 F. Recirculation Loops Operating F 3/4.6-8 BASES B3/4.6-1 3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A. Primary Containment A 3/4.7-1 B. Standby Gas Treatment System and Control B Room High Efficiency Air Filtration System 3/4.7-11 C. Secondary Containment C 3/4.7-16 BASES B3/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8.2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES B3/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A. Auxiliary Electrical Equipment A 3/4.9-1 B. Operation with Inoperable Equipment B 3/4.9-4 BASES B3/4.9-1 3.10 CORE ALTERATIONS 4.10 3/4.10-1 A. Refueling Interlocks A 3/4.10-1 B. Core Monitoring B 3/4.10-1 C. Spent Fuel Pool Water Level C 3/4.10-2 BASES B3/4.10-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A. Average Planar Linear Heat Generation Rate A (APLHGR) 3/4.11-1 B. Linear Heat Generation Rate (LHGR) B 3/4.11-2 C. Minimum Critical Power Ratio (MCPR) C 3/4.11-2 D. Power/Flow Relationship During Power D Operation 3/4.11-4 BASES B3/4.1 1-1 Amendment No.-179, 219, 224 228 ii}}

Latest revision as of 05:57, 23 November 2019

Technical Specifications, Limiting Conditions for Operation
ML071430305
Person / Time
Site: Pilgrim
Issue date: 04/25/2007
From: James Kim
NRC/NRR/ADRO/DORL/LPLA
To: Kansler M
Entergy Nuclear Operations
kim J, NRR/ADRO/DORL, 415-4125
References
TAC MC9018
Download: ML071430305 (1)


Text

TABLE OF CONTENTS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY 4.6 3/4.6-1 A. Thermal and Pressurization Limitations A 3/4.6-1 B. Coolant Chemistry B 3/4.6-3 C. Coolant Leakage C 3/4.6-4 D. Safety and Relief Valves D 3/4.6-6 E. Jet Pumps E 3/4.6-7 F. Recirculation Loops Operating F 3/4.6-8 BASES B3/4.6-1 3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A. Primary Containment A 3/4.7-1 B. Standby Gas Treatment System and Control B Room High Efficiency Air Filtration System 3/4.7-11 C. Secondary Containment C 3/4.7-16 BASES B3/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8.2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES B3/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A. Auxiliary Electrical Equipment A 3/4.9-1 B. Operation with Inoperable Equipment B 3/4.9-4 BASES B3/4.9-1 3.10 CORE ALTERATIONS 4.10 3/4.10-1 A. Refueling Interlocks A 3/4.10-1 B. Core Monitoring B 3/4.10-1 C. Spent Fuel Pool Water Level C 3/4.10-2 BASES B3/4.10-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A. Average Planar Linear Heat Generation Rate A (APLHGR) 3/4.11-1 B. Linear Heat Generation Rate (LHGR) B 3/4.11-2 C. Minimum Critical Power Ratio (MCPR) C 3/4.11-2 D. Power/Flow Relationship During Power D Operation 3/4.11-4 BASES B3/4.1 1-1 Amendment No.-179, 219, 224 228 ii