| issue date = 10/15/2007
| issue date = 10/15/2007
| title = Stretch Power Uprate Acceptance Review
| title = Stretch Power Uprate Acceptance Review
| author name = Chernoff H K
| author name = Chernoff H
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| docket = 05000423
| docket = 05000423
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:October 15, 2007Mr. David A. ChristianSr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
{{#Wiki_filter:October 15, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711


==SUBJECT:==
==SUBJECT:==
MILLSTONE POWER STATION UNIT 3 - STRETCH POWER UPRATEACCEPTANCE REVIEW (TAC NO. MD6070)
MILLSTONE POWER STATION UNIT 3 - STRETCH POWER UPRATE ACCEPTANCE REVIEW (TAC NO. MD6070)


==Dear Mr. Christian:==
==Dear Mr. Christian:==


By letter dated July 13, 2007, as supplemented on September 12, 2007, Dominion NuclearConnecticut, Inc. (DNC), licensee of the Millstone Power Station Unit 3 (MPS3), submitted the application, "Stretch Power Uprate" to the U.S. Nuclear Regulatory Commission (NRC). The proposed license amendment would allow an increase in the maximum authorized power level from 3411 megawatts thermal (MWt) to 3650 MWt, and make changes to the technical specifications as necessary to support operation at the stretch power level. The purpose of this letter is to provide the results of the NRC staff's acceptance review of DNC's stretch power uprate (SPU) application for MPS3. The acceptance review determines whether or not there is sufficiently detailed information to allow the staff to proceed with its detailed technical review.
By letter dated July 13, 2007, as supplemented on September 12, 2007, Dominion Nuclear Connecticut, Inc. (DNC), licensee of the Millstone Power Station Unit 3 (MPS3), submitted the application, Stretch Power Uprate to the U.S. Nuclear Regulatory Commission (NRC). The proposed license amendment would allow an increase in the maximum authorized power level from 3411 megawatts thermal (MWt) to 3650 MWt, and make changes to the technical specifications as necessary to support operation at the stretch power level. The purpose of this letter is to provide the results of the NRC staff's acceptance review of DNC's stretch power uprate (SPU) application for MPS3. The acceptance review determines whether or not there is sufficiently detailed information to allow the staff to proceed with its detailed technical review.
The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant.Based on the review of the information provided in the submittals mentioned above, the NRCstaff has determined that DNC has provided the necessary information for the staff to begin a detailed technical review. Additionally, the staff has determined that your application meets the criteria for an SPU as the requested power increase is approximately 7 percent, and there are limited plant modifications required to support the uprate.DNC requested that the NRC staff complete its detailed review by June 30, 2008, in order to beprepared for the MPS3 refueling outage currently scheduled for the fall of 2008. Mr. John G.
The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant.
Based on the review of the information provided in the submittals mentioned above, the NRC staff has determined that DNC has provided the necessary information for the staff to begin a detailed technical review. Additionally, the staff has determined that your application meets the criteria for an SPU as the requested power increase is approximately 7 percent, and there are limited plant modifications required to support the uprate.
DNC requested that the NRC staff complete its detailed review by June 30, 2008, in order to be prepared for the MPS3 refueling outage currently scheduled for the fall of 2008. Mr. John G.
Lamb, NRC Senior Project Manager, discussed with your staff that your application may require more review time as a result of your proposed revisions to the licensing basis for the alternative source term dose consequence analysis. Mr. Lamb discussed a new requested completion date with Mr. Ron Thomas of your staff and agreed upon August 15, 2008.
Lamb, NRC Senior Project Manager, discussed with your staff that your application may require more review time as a result of your proposed revisions to the licensing basis for the alternative source term dose consequence analysis. Mr. Lamb discussed a new requested completion date with Mr. Ron Thomas of your staff and agreed upon August 15, 2008.
D. Christian- 2 -If you have any questions, please contact Mr. Lamb at (301) 415-3100.Sincerely,/ra/Harold Chernoff, ChiefPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-423 cc:  See next page D. Christian- 2 -If you have any questions, please contact Mr. Lamb at (301) 415-3100.Sincerely,/ra/Harold Chernoff, ChiefPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-423 cc:  See next pageDISTRIBUTIONPUBLICRidsNrrDciCpnbTFryeRidsNrrAdroPDI-2 ReadingJMcHaleAKleinRidsNrrDorl RidsNrrDorlLpl1-2WKemperRLobelRidsNrrDorlDpr RidsNrrPmJHugheyRidsNrrDeEeebJParilloRLaufer TAlexionRidsNrrDeEqvbBBalsamRidsRgn1MailCenter RPowellMKotzalesNPatelRidsEdoMailCenter GCranstonRidsNrrDeEqvbSRayRidsNrrLAABaxter RDennigRPettisGCheruvenkiRidsNrrPMJLamb RidsNrrDssSnpbMHartMYoderRidsNrrLARSola TKobetzMRubinSMazumdarRidsOgcRp RidsNrrDciCsgbEBennerNIqbalRidsAcrsAcnwMailCenter MMitchellNSalgadoACCESSION NO.:  ML072670216OFFICELPLI-2/PMLPLI-2/LALPL2-2/LALPLI-2/PMLPL-I-2/BCNAMEJLambABaxterCSolaJHugheyHChernoffDATE9/24/079/25/079/28/0710/01/0710/15/2007OFFICIAL RECORD COPY Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, EsquireSenior Counsel Dominion Resources Services, Inc.
Building 475, 5 th FloorRope Ferry Road Waterford, CT  06385Edward L. Wilds, Jr., Ph.D.Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT  06106-5127Regional Administrator, Region IU.S. Nuclear Regulatory Commission


475 Allendale Road King of Prussia, PA  19406First SelectmenTown of Waterford 15 Rope Ferry Road Waterford, CT  06385Mr. J. W. "Bill" Sheehan Co-Chair NEAC 19 Laurel Crest Drive Waterford, CT 06385Mr. Evan W. WoollacottCo-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT  06070Senior Resident InspectorMillstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT  06357Ms. Nancy Burton147 Cross Highway Redding Ridge, CT  00870Mr. Joseph Roy, Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056Mr. J. Alan PriceSite Vice President Dominion Nuclear Connecticut, Inc.
D. Christian                                  If you have any questions, please contact Mr. Lamb at (301) 415-3100.
Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Mr. Chris FunderburkDirector, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Sincerely,
5000 Dominion Boulevard Glen Allen, VA 23060-6711Mr. David W. DodsonLicensing Supervisor Dominion Nuclear Connecticut, Inc.
                                          /ra/
Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385}}
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page
 
D. Christian                                  If you have any questions, please contact Mr. Lamb at (301) 415-3100.
Sincerely,
                                          /ra/
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page DISTRIBUTION PUBLIC                  RidsNrrDciCpnb          TFrye                  RidsNrrAdro PDI-2 Reading          JMcHale                AKlein                  RidsNrrDorl RidsNrrDorlLpl1-2      WKemper                RLobel                  RidsNrrDorlDpr RidsNrrPmJHughey        RidsNrrDeEeeb          JParillo                RLaufer TAlexion                RidsNrrDeEqvb          BBalsam                RidsRgn1MailCenter RPowell                MKotzales              NPatel                  RidsEdoMailCenter GCranston              RidsNrrDeEqvb          SRay                    RidsNrrLAABaxter RDennig                RPettis                GCheruvenki            RidsNrrPMJLamb RidsNrrDssSnpb          MHart                  MYoder                  RidsNrrLARSola TKobetz                MRubin                  SMazumdar              RidsOgcRp RidsNrrDciCsgb          EBenner                NIqbal                  RidsAcrsAcnwMailCenter MMitchell              NSalgado ACCESSION NO.: ML072670216 OFFICE    LPLI-2/PM  LPLI-2/LA  LPL2-2/LA    LPLI-2/PM    LPL-I-2/BC NAME      JLamb      ABaxter    CSola        JHughey      HChernoff DATE      9/24/07    9/25/07    9/28/07      10/01/07      10/15/2007 OFFICIAL RECORD COPY
 
Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, Esquire            Mr. Joseph Roy, Senior Counsel                        Director of Operations Dominion Resources Services, Inc.      Massachusetts Municipal Wholesale Building 475, 5th Floor                Electric Company Rope Ferry Road                        Moody Street Waterford, CT 06385                    P.O. Box 426 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation        Mr. J. Alan Price Department of Environmental Protection Site Vice President 79 Elm Street                          Dominion Nuclear Connecticut, Inc.
Hartford, CT 06106-5127                Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I      Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road                    Mr. Chris Funderburk King of Prussia, PA 19406              Director, Nuclear Licensing and Operations Support First Selectmen                        Dominion Resources Services, Inc.
Town of Waterford                      5000 Dominion Boulevard 15 Rope Ferry Road                    Glen Allen, VA 23060-6711 Waterford, CT 06385 Mr. David W. Dodson Mr. J. W. "Bill" Sheehan              Licensing Supervisor Co-Chair NEAC                          Dominion Nuclear Connecticut, Inc.
19 Laurel Crest Drive                  Building 475, 5th Floor Waterford, CT 06385                    Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870}}

Latest revision as of 03:27, 23 November 2019

Stretch Power Uprate Acceptance Review
ML072670216
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/15/2007
From: Chernoff H
NRC/NRR/ADRO/DORL/LPLI-2
To: Christian D
Dominion Nuclear Connecticut
Lamb John G./NRR/DORL, 415-3100
References
TAC MD6070
Download: ML072670216 (4)


Text

October 15, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION UNIT 3 - STRETCH POWER UPRATE ACCEPTANCE REVIEW (TAC NO. MD6070)

Dear Mr. Christian:

By letter dated July 13, 2007, as supplemented on September 12, 2007, Dominion Nuclear Connecticut, Inc. (DNC), licensee of the Millstone Power Station Unit 3 (MPS3), submitted the application, Stretch Power Uprate to the U.S. Nuclear Regulatory Commission (NRC). The proposed license amendment would allow an increase in the maximum authorized power level from 3411 megawatts thermal (MWt) to 3650 MWt, and make changes to the technical specifications as necessary to support operation at the stretch power level. The purpose of this letter is to provide the results of the NRC staff's acceptance review of DNC's stretch power uprate (SPU) application for MPS3. The acceptance review determines whether or not there is sufficiently detailed information to allow the staff to proceed with its detailed technical review.

The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant.

Based on the review of the information provided in the submittals mentioned above, the NRC staff has determined that DNC has provided the necessary information for the staff to begin a detailed technical review. Additionally, the staff has determined that your application meets the criteria for an SPU as the requested power increase is approximately 7 percent, and there are limited plant modifications required to support the uprate.

DNC requested that the NRC staff complete its detailed review by June 30, 2008, in order to be prepared for the MPS3 refueling outage currently scheduled for the fall of 2008. Mr. John G.

Lamb, NRC Senior Project Manager, discussed with your staff that your application may require more review time as a result of your proposed revisions to the licensing basis for the alternative source term dose consequence analysis. Mr. Lamb discussed a new requested completion date with Mr. Ron Thomas of your staff and agreed upon August 15, 2008.

D. Christian If you have any questions, please contact Mr. Lamb at (301) 415-3100.

Sincerely,

/ra/

Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page

D. Christian If you have any questions, please contact Mr. Lamb at (301) 415-3100.

Sincerely,

/ra/

Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page DISTRIBUTION PUBLIC RidsNrrDciCpnb TFrye RidsNrrAdro PDI-2 Reading JMcHale AKlein RidsNrrDorl RidsNrrDorlLpl1-2 WKemper RLobel RidsNrrDorlDpr RidsNrrPmJHughey RidsNrrDeEeeb JParillo RLaufer TAlexion RidsNrrDeEqvb BBalsam RidsRgn1MailCenter RPowell MKotzales NPatel RidsEdoMailCenter GCranston RidsNrrDeEqvb SRay RidsNrrLAABaxter RDennig RPettis GCheruvenki RidsNrrPMJLamb RidsNrrDssSnpb MHart MYoder RidsNrrLARSola TKobetz MRubin SMazumdar RidsOgcRp RidsNrrDciCsgb EBenner NIqbal RidsAcrsAcnwMailCenter MMitchell NSalgado ACCESSION NO.: ML072670216 OFFICE LPLI-2/PM LPLI-2/LA LPL2-2/LA LPLI-2/PM LPL-I-2/BC NAME JLamb ABaxter CSola JHughey HChernoff DATE 9/24/07 9/25/07 9/28/07 10/01/07 10/15/2007 OFFICIAL RECORD COPY

Millstone Power Station, Unit No. 3 cc:

Lillilan M. Cuoco, Esquire Mr. Joseph Roy, Senior Counsel Director of Operations Dominion Resources Services, Inc. Massachusetts Municipal Wholesale Building 475, 5th Floor Electric Company Rope Ferry Road Moody Street Waterford, CT 06385 P.O. Box 426 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Mr. J. Alan Price Department of Environmental Protection Site Vice President 79 Elm Street Dominion Nuclear Connecticut, Inc.

Hartford, CT 06106-5127 Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc.

Town of Waterford 5000 Dominion Boulevard 15 Rope Ferry Road Glen Allen, VA 23060-6711 Waterford, CT 06385 Mr. David W. Dodson Mr. J. W. "Bill" Sheehan Licensing Supervisor Co-Chair NEAC Dominion Nuclear Connecticut, Inc.

19 Laurel Crest Drive Building 475, 5th Floor Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870