Letter Sequence Acceptance Review |
---|
|
Initiation
- Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0720002812007-07-13013 July 2007 License Amendment Request - Stretch Power Uprate - Supplemental Information Project stage: Supplement ML0720003862007-07-13013 July 2007 License Amendment Request, Stretch Power Uprate Project stage: Request ML0726702162007-10-15015 October 2007 Stretch Power Uprate Acceptance Review Project stage: Acceptance Review ML0727005452007-10-18018 October 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2296), Subject: NEU-07-128 P-Attachment, Millstone Nuclear Power Station Unit 2 Stretch Power Uprate Program Supplemental Project stage: Withholding Request Acceptance ML0729601792007-10-29029 October 2007 Request for Additional Information, Stretch Power Uprate Amendment Request Project stage: RAI ML0732309762007-11-19019 November 2007 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Project stage: Response to RAI ML0731706652007-11-26026 November 2007 Request for Additional Information on Instrumentation and Controls and Fire Protection Regarding Stretch Power Uprate Amendment Request Project stage: RAI ML0734802402007-12-13013 December 2007 Supplemental Information for License Amendment Request Stretch Power Uprate Project stage: Supplement ML0733703842007-12-14014 December 2007 Request for Additional Information on the Stretch Power Uprate Amendment Request Project stage: RAI ML0732500812007-12-14014 December 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2252), Subject: WCAP-16271-P, Millstone Unit 3 Spent Fuel Pool Criticality Safety Analysis, March 2007 (Proprietary), Date Project stage: Withholding Request Acceptance ML0735200512007-12-17017 December 2007 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Project stage: Response to RAI ML0801006002008-01-10010 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions EEEB-07-0049 Through EEEB-07-0057 Project stage: Response to RAI ML0801006112008-01-10010 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question CPNB-07-0048 Project stage: Response to RAI ML0801006042008-01-10010 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question AADB-07-0012 Project stage: Response to RAI ML0801006062008-01-10010 January 2008 Response to Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions SCVB-07-0058 and SCVB-07-0059 Project stage: Response to RAI ML0805804762008-01-11011 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions SRXB-07-0013 Through SRXB-07-0047 Project stage: Response to RAI ML0801704952008-01-11011 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question EMCB-07-0070 Project stage: Response to RAI ML0801400772008-01-11011 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request, Response to Questions SBPB-07-0082 Through SBPB-07-0087 Project stage: Response to RAI ML0801106952008-01-11011 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request, Response to Questions CSGB-07-0010 and CSGB-07-0011 Project stage: Response to RAI ML0801405702008-01-14014 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions EMCB-07-0060 Through EMCB-07-0069 and EMCB-07-0071 Through EMCB-07-0081 Project stage: Response to RAI ML0802205062008-01-18018 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question EICB-07-0106 Project stage: Response to RAI ML0802205272008-01-18018 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question SBPB-07-0105 Project stage: Response to RAI ML0802205302008-01-18018 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions SCVB-07-0091 Through SCVB-07-0104 Project stage: Response to RAI ML0802205412008-01-18018 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Questions SRXB-07-0088 Through SRXB-07-0090 Project stage: Response to RAI ML0802803752008-01-18018 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request, Response to Question AADB-07-0107 Project stage: Response to RAI ML0803203082008-01-31031 January 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question EMCB-07-0070 Project stage: Response to RAI ML0805603922008-02-25025 February 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request, Supplemental Response to Question EMCB-07-0072 Project stage: Supplement ML0805606152008-02-25025 February 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Revised and Supplemental Responses to Questions AFPB-07-0007 & AFPB-07-0008 Project stage: Supplement ML0807103912008-03-10010 March 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question SCVB-07-0091 Project stage: Response to RAI ML0807103772008-03-10010 March 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Response to Question AADB-07-0107 Project stage: Response to RAI ML0803501322008-03-13013 March 2008 Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 Project stage: Withholding Request Acceptance ML0808405272008-03-17017 March 2008 Nancy Burton Petition to Intervene and Request for Hearing Project stage: Request ML0808508942008-03-25025 March 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Supplemental Response to Question EEEB-07-0052 Project stage: Supplement ML0808802682008-03-27027 March 2008 Supplemental Information Regarding Stretch Power Uprate License Amendment Request Project stage: Supplement ML0804606202008-03-28028 March 2008 Potential Schedule Change for Proposed Stretch Power Uprate License Amendment Request Project stage: Other ML0814300142008-04-0404 April 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Supplemental Response to Question EMCB-07-0072 Project stage: Supplement ML0810800242008-04-23023 April 2008 Request for Additional Information, Stretch Power Uprate Amendment Request Project stage: RAI ML0811506792008-04-24024 April 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Supplemental Information, Rod Withdrawal at Power Event Project stage: Supplement ML0812006432008-04-29029 April 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Revised Response to Questions EEEB-07-0052, EEEB-07-0054 and EEEB-07-0055 Project stage: Response to RAI ML0813606252008-05-15015 May 2008 Response to Request for Additional Information Regarding Stretch Power Uprate License Amendment Request Revised Response to Follow-ups EEEB-08-0108 Through EEEB08-0113 to Question EEEB-07-0052 Project stage: Response to RAI ML0814204432008-05-20020 May 2008 Supplemental Information Regarding Stretch Power Uprate License Amendment Request Miscellaneous Updates to the License Amendment Request Project stage: Supplement ML0814208242008-05-21021 May 2008 Stretch Power Uprate License Amendment Request Additional Information in Connection with the NRC Audit Held on May 13, 2008 in Rockville, Maryland Project stage: Request ML0808704572008-05-29029 May 2008 Draft Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Draft Other ML0817502222008-06-16016 June 2008 Notice of Appeal Project stage: Request ML0819302742008-07-10010 July 2008 Stretch Power Uprate License Amendment Request DNC Comments on Draft Safety Evaluation - Stretch Power Uprate Project stage: Draft Request ML0819307572008-07-11011 July 2008 Follow-up to Dominion Nuclear Connecticut, Inc. Letter, Dated July 10, 2008, Regarding the Draft Safety Evaluation - Stretch Power Uprate Project stage: Draft Approval ML0819901122008-07-16016 July 2008 Stretch Power Uprate License Amendment Request - Supplement to DNC Comments on Draft Safety Evaluation - Stretch Power Uprate ML0819300702008-07-30030 July 2008 Final Environmental Assessment and Finding of No Significant Impact for Proposed Stretch Power Uprate Project stage: Other ML0816105852008-08-12012 August 2008 License Amendment, Stretch Power Uprate Project stage: Other ML0822504182008-08-12012 August 2008 Stretch Power Uprate, Tec Specs to Amd 242 Project stage: Acceptance Review 2008-03-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] |
Text
October 15, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION UNIT 3 - STRETCH POWER UPRATE ACCEPTANCE REVIEW (TAC NO. MD6070)
Dear Mr. Christian:
By letter dated July 13, 2007, as supplemented on September 12, 2007, Dominion Nuclear Connecticut, Inc. (DNC), licensee of the Millstone Power Station Unit 3 (MPS3), submitted the application, Stretch Power Uprate to the U.S. Nuclear Regulatory Commission (NRC). The proposed license amendment would allow an increase in the maximum authorized power level from 3411 megawatts thermal (MWt) to 3650 MWt, and make changes to the technical specifications as necessary to support operation at the stretch power level. The purpose of this letter is to provide the results of the NRC staff's acceptance review of DNC's stretch power uprate (SPU) application for MPS3. The acceptance review determines whether or not there is sufficiently detailed information to allow the staff to proceed with its detailed technical review.
The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant.
Based on the review of the information provided in the submittals mentioned above, the NRC staff has determined that DNC has provided the necessary information for the staff to begin a detailed technical review. Additionally, the staff has determined that your application meets the criteria for an SPU as the requested power increase is approximately 7 percent, and there are limited plant modifications required to support the uprate.
DNC requested that the NRC staff complete its detailed review by June 30, 2008, in order to be prepared for the MPS3 refueling outage currently scheduled for the fall of 2008. Mr. John G.
Lamb, NRC Senior Project Manager, discussed with your staff that your application may require more review time as a result of your proposed revisions to the licensing basis for the alternative source term dose consequence analysis. Mr. Lamb discussed a new requested completion date with Mr. Ron Thomas of your staff and agreed upon August 15, 2008.
D. Christian If you have any questions, please contact Mr. Lamb at (301) 415-3100.
Sincerely,
/ra/
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page
D. Christian If you have any questions, please contact Mr. Lamb at (301) 415-3100.
Sincerely,
/ra/
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page DISTRIBUTION PUBLIC RidsNrrDciCpnb TFrye RidsNrrAdro PDI-2 Reading JMcHale AKlein RidsNrrDorl RidsNrrDorlLpl1-2 WKemper RLobel RidsNrrDorlDpr RidsNrrPmJHughey RidsNrrDeEeeb JParillo RLaufer TAlexion RidsNrrDeEqvb BBalsam RidsRgn1MailCenter RPowell MKotzales NPatel RidsEdoMailCenter GCranston RidsNrrDeEqvb SRay RidsNrrLAABaxter RDennig RPettis GCheruvenki RidsNrrPMJLamb RidsNrrDssSnpb MHart MYoder RidsNrrLARSola TKobetz MRubin SMazumdar RidsOgcRp RidsNrrDciCsgb EBenner NIqbal RidsAcrsAcnwMailCenter MMitchell NSalgado ACCESSION NO.: ML072670216 OFFICE LPLI-2/PM LPLI-2/LA LPL2-2/LA LPLI-2/PM LPL-I-2/BC NAME JLamb ABaxter CSola JHughey HChernoff DATE 9/24/07 9/25/07 9/28/07 10/01/07 10/15/2007 OFFICIAL RECORD COPY
Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, Esquire Mr. Joseph Roy, Senior Counsel Director of Operations Dominion Resources Services, Inc. Massachusetts Municipal Wholesale Building 475, 5th Floor Electric Company Rope Ferry Road Moody Street Waterford, CT 06385 P.O. Box 426 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Mr. J. Alan Price Department of Environmental Protection Site Vice President 79 Elm Street Dominion Nuclear Connecticut, Inc.
Hartford, CT 06106-5127 Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc.
Town of Waterford 5000 Dominion Boulevard 15 Rope Ferry Road Glen Allen, VA 23060-6711 Waterford, CT 06385 Mr. David W. Dodson Mr. J. W. "Bill" Sheehan Licensing Supervisor Co-Chair NEAC Dominion Nuclear Connecticut, Inc.
19 Laurel Crest Drive Building 475, 5th Floor Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870