| number = ML17082A531
| number = ML17082A531
| issue date = 03/23/2017
| issue date = 03/23/2017
| title = Ltr 03/23/17 Completion of Actions by Davis-Besse Nuclear Power Station, As Set Forth in Letter Dated March 1, 2017, in Response to NRC Confirmatory Order Dated September 1, 2016 (RJO)
| title = Completion of Actions by Davis-Besse Nuclear Power Station, as Set Forth in Letter Dated March 1, 2017, in Response to NRC Confirmatory Order Dated September 1, 2016 (Rjo)
| author name = O'Brien K G
| author name = O'Brien K
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
| addressee name = Boles B D
| addressee name = Boles B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| docket = 05000346
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| revision = 0
| project =  
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 March 23, 2017 EA-16-022 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
==SUBJECT:==
COMPLETION OF ACTIONS BY DAVIS-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016
==Dear Mr. Boles:==
This letter acknowledges receipt of your letter dated March 1, 2017, which describes the actions you have completed up to the date of the letter in response to the Confirmatory Order issued to you by the U.S. Nuclear Regulatory Commission (NRC) on September 1, 2016. We have completed our review of the actions described in your letter, which appear to be responsive to Section V of the Confirmatory Order, and have no further questions at this time. These actions will be examined during future inspections.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you have any questions or comments, please contact Robert Orlikowski, Chief, Operations Branch, at (630) 829-9834.
Sincerely,
                                                /RA/
Kenneth G. OBrien, Director Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV
B. Boles                                  Letter to Brian D. Boles from Kenneth G. OBrien dated March 23, 2017
==SUBJECT:==
COMPLETION OF ACTIONS BY DAVIS-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016 DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ADAMs Accession Number: ML17082A531 OFFICE      RIII                RIII              RIII            RIII NAME        ROrlikowski:jw      RSkokowski        KOBrien DATE        03/23/17            03/23/17          03/23/17 OFFICIAL RECORD COPY}}

Latest revision as of 12:24, 16 November 2019

Completion of Actions by Davis-Besse Nuclear Power Station, as Set Forth in Letter Dated March 1, 2017, in Response to NRC Confirmatory Order Dated September 1, 2016 (Rjo)
ML17082A531
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/23/2017
From: O'Brien K
Division of Reactor Safety III
To: Boles B
FirstEnergy Nuclear Operating Co
References
EA-16-022
Download: ML17082A531 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 March 23, 2017 EA-16-022 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

COMPLETION OF ACTIONS BY DAVIS-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016

Dear Mr. Boles:

This letter acknowledges receipt of your letter dated March 1, 2017, which describes the actions you have completed up to the date of the letter in response to the Confirmatory Order issued to you by the U.S. Nuclear Regulatory Commission (NRC) on September 1, 2016. We have completed our review of the actions described in your letter, which appear to be responsive to Section V of the Confirmatory Order, and have no further questions at this time. These actions will be examined during future inspections.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you have any questions or comments, please contact Robert Orlikowski, Chief, Operations Branch, at (630) 829-9834.

Sincerely,

/RA/

Kenneth G. OBrien, Director Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV

B. Boles Letter to Brian D. Boles from Kenneth G. OBrien dated March 23, 2017

SUBJECT:

COMPLETION OF ACTIONS BY DAVIS-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016 DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ADAMs Accession Number: ML17082A531 OFFICE RIII RIII RIII RIII NAME ROrlikowski:jw RSkokowski KOBrien DATE 03/23/17 03/23/17 03/23/17 OFFICIAL RECORD COPY