ML080601230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/04/2008
| issue date = 03/04/2008
| title = Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing
| title = Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing
| author name = Thorpe-Kavanaugh M M
| author name = Thorpe-Kavanaugh M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000456, 05000457
| docket = 05000456, 05000457
Line 15: Line 15:
| page count = 3
| page count = 3
| project = TAC:MD8158, TAC:MD8159
| project = TAC:MD8158, TAC:MD8159
| stage = Approval
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer     and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road         Warrenville, IL 60555  
{{#Wiki_filter:March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)  
BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==


The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.
The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.
This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, "Steam Generator (SG) Program," and TS 5.6.9, "Steam Generator Tube Inspection Report.For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.
This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.
If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov. Sincerely,  
If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.
/RA/ Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Sincerely,
                                              /RA/
Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457


Docket Nos. STN 50-456 and STN 50-457
==Enclosure:==
Notice of Consideration cc w/encl: See next page


==Enclosure:==
March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Notice of Consideration cc w/encl:  See next page March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer     and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)  
BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==


The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.  
The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.
 
This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.
This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, "Steam Generator (SG) Program," and TS 5.6.9, "Steam Generator Tube Inspection Report.For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.
If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.
If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov. Sincerely, /RA/ Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457  
Sincerely,
                                                /RA/
Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457


==Enclosure:==
==Enclosure:==
Notice of Consideration
Notice of Consideration cc w/encl: See next page DISTRIBUTION:
 
PUBLIC                   LPL3-2 R/F             RidsAcrsAcnw&mMailCenter             RidsNrrDorlDpr RidsNrrDorlLpl3-2       RidsNrrLAEWhitt         RidsNrrPMMDavid                       RidsOgcRp RidsNrrPMMThorpe-Kavanaugh                       RidsRgn3MailCenter Package ADAMS Accession No.: ML080601238         Letter ADAMS Accession No.: ML080601230 Federal Register Notice ADAMS Accession No.: ML080601246 OFFICE     LPL3-2/PM             LPL3-2/PM           NRR/LPL3-2/LA     NRR/LPL3-2/BC NAME       MThorpe-Kavanaugh     MDavid             EWhitt           RGibbs DATE         3/4/08                 3/4/08             3/3/08           3/4/08 OFFICIAL AGENCY RECORD
cc w/encl: See next page DISTRIBUTION
: PUBLIC   LPL3-2 R/F RidsAcrsAcnw&mMailCenter RidsNrrDorlDpr RidsNrrDorlLpl3-2 RidsNrrLAEWhitt RidsNrrPMMDavid   RidsOgcRp RidsNrrPMMThorpe-Kavanaugh   RidsRgn3MailCenter Package ADAMS Accession No.: ML080601238 Letter ADAMS Accession No.:   ML080601230 Federal Register Notice ADAMS Accession No.: ML080601246 OFFICE LPL3-2/PM LPL3-2/PM NRR/LPL3-2/LA NRR/LPL3-2/BC NAME MThorpe-Kavanaugh MDavid EWhitt RGibbs DATE   3/4/08 3/4/08   3/3/08   3/4/08 OFFICIAL AGENCY RECORD Braidwood Station, Units 1 and 2
 
cc:
Corporate Distribution Exelon Generation Company, LLC Via e-mail
 
Braidwood Distribution Exelon Generation Company, LLC Via e-mail
 
Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail
 
Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail
 
Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail
 
Braidwood Senior Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail
 
Ms. Lorraine Creek RR 1, Box 182 Manteno, IL  60950
 
Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness Via e-mail
 
Will County Executive Via e-mail
 
Will County Executive Secretary Via e-mail
 
Attorney General 500 S. Second Street Springfield, IL  62701


Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061}}
Braidwood Station, Units 1 and 2 cc:
Corporate Distribution Exelon Generation Company, LLC Via e-mail Braidwood Distribution Exelon Generation Company, LLC Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Braidwood Senior Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness Via e-mail Will County Executive Via e-mail Will County Executive Secretary Via e-mail Attorney General 500 S. Second Street Springfield, IL 62701 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061}}

Latest revision as of 20:03, 14 November 2019

Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing
ML080601230
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/04/2008
From: Thorpe-Kavanaugh M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Pardee C
Exelon Generation Co
Thorpe-Kavanaugh Meghan, LP3-2, 415-5735
Shared Package
ml080601238 List:
References
TAC MD8158, TAC MD8159
Download: ML080601230 (3)


Text

March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.

If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.

Sincerely,

/RA/

Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457

Enclosure:

Notice of Consideration cc w/encl: See next page

March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.

If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.

Sincerely,

/RA/

Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457

Enclosure:

Notice of Consideration cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsAcrsAcnw&mMailCenter RidsNrrDorlDpr RidsNrrDorlLpl3-2 RidsNrrLAEWhitt RidsNrrPMMDavid RidsOgcRp RidsNrrPMMThorpe-Kavanaugh RidsRgn3MailCenter Package ADAMS Accession No.: ML080601238 Letter ADAMS Accession No.: ML080601230 Federal Register Notice ADAMS Accession No.: ML080601246 OFFICE LPL3-2/PM LPL3-2/PM NRR/LPL3-2/LA NRR/LPL3-2/BC NAME MThorpe-Kavanaugh MDavid EWhitt RGibbs DATE 3/4/08 3/4/08 3/3/08 3/4/08 OFFICIAL AGENCY RECORD

Braidwood Station, Units 1 and 2 cc:

Corporate Distribution Exelon Generation Company, LLC Via e-mail Braidwood Distribution Exelon Generation Company, LLC Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Braidwood Senior Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness Via e-mail Will County Executive Via e-mail Will County Executive Secretary Via e-mail Attorney General 500 S. Second Street Springfield, IL 62701 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061