Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing
ML080601230
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/04/2008
From: Thorpe-Kavanaugh M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Pardee C
Exelon Generation Co
Thorpe-Kavanaugh Meghan, LP3-2, 415-5735
Shared Package
ml080601238 List:
References
TAC MD8158, TAC MD8159
Download: ML080601230 (3)


Text

March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.

If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.

Sincerely,

/RA/

Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457

Enclosure:

Notice of Consideration cc w/encl: See next page

March 4, 2008 Mr. Charles G Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD8158 AND MD8159)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 25, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080560512), to revise the Braidwood Station, Units 1 and 2 (Braidwood), Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would replace the existing alternate repair criteria (ARC) in the provisions for SG tube repair criteria during Braidwood, Unit 2, refueling outage 13 and the subsequent operating cycle. For TS 5.6.9, three new reporting requirements are proposed to be added to the existing seven requirements. The proposed changes would only affect Braidwood, Unit 2, however this is docketed for Braidwood, Units 1 and 2, since the TS are common to Units 1 and 2.

If you have any questions, please contact me at 301-415-5735 or via e-mail at MMT@nrc.gov.

Sincerely,

/RA/

Meghan M. Thorpe-Kavanaugh, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457

Enclosure:

Notice of Consideration cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsAcrsAcnw&mMailCenter RidsNrrDorlDpr RidsNrrDorlLpl3-2 RidsNrrLAEWhitt RidsNrrPMMDavid RidsOgcRp RidsNrrPMMThorpe-Kavanaugh RidsRgn3MailCenter Package ADAMS Accession No.: ML080601238 Letter ADAMS Accession No.: ML080601230 Federal Register Notice ADAMS Accession No.: ML080601246 OFFICE LPL3-2/PM LPL3-2/PM NRR/LPL3-2/LA NRR/LPL3-2/BC NAME MThorpe-Kavanaugh MDavid EWhitt RGibbs DATE 3/4/08 3/4/08 3/3/08 3/4/08 OFFICIAL AGENCY RECORD

Braidwood Station, Units 1 and 2 cc:

Corporate Distribution Exelon Generation Company, LLC Via e-mail Braidwood Distribution Exelon Generation Company, LLC Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Ms. Bridget Little Rorem Appleseed Coordinator Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Braidwood Senior Resident Inspector U.S. Nuclear Regulatory Commission Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness Via e-mail Will County Executive Via e-mail Will County Executive Secretary Via e-mail Attorney General 500 S. Second Street Springfield, IL 62701 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061