ML081930252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/11/2008
| issue date = 07/11/2008
| title = Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482-08-010) and Request for Information
| title = Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482-08-010) and Request for Information
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRS/EB2
| author affiliation = NRC/RGN-IV/DRS/EB2
| addressee name = Muench R A
| addressee name = Muench R
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000482/2008010]]
See also: [[see also::IR 05000482/2008010]]


=Text=
=Text=
{{#Wiki_filter:July 11, 2008  
{{#Wiki_filter:UNITE D S TATES
   
                                NUC LEAR RE GULATOR Y C OMMIS SI ON
Rick A. Muench, President and   Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839  
                                                    R EG I O N I V
                                        612 EAST LAMAR BLVD , SU ITE 400
                                          AR L IN GTON , TEXAS 7 6 011 - 4125
                                                July 11, 2008
Rick A. Muench, President and
  Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT:        WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                REPORT 05000482/2008010) AND REQUEST FOR INFORMATION
Dear Mr. Muench:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at your Wolf Creek
Generating Station in September and October of 2008. The inspection team will be comprised
of reactor inspectors from the NRC Region IV office and a contractor. The team will conduct the
inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection
(Triennial)."
The schedule for the inspection is as follows:
        *      Information gathering visit:        September 10 - 11, 2008
        *      Onsite inspection:                  September 29 - October 3, 2008
                                                    October 20 - 24, 2008
The team will visit the Wolf Creek Generating Station on September 10-11, 2008, to gather
information, select the fire areas for evaluation, identify documents needed to support the
inspection, obtain unescorted access, and to become familiar with your fire protection program.
The enclosure to this letter provides an initial list of the documents the team will want to review.
You are requested to transmit copies of the documents listed in the enclosure to the NRC
Region IV office for team use in preparation for the inspection. We would appreciate it if you
could send this information so that it will arrive in our office in Arlington, Texas, by the dates
listed in the enclosure.
We request that during the onsite inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest are those documents that establish that your fire
protection program satisfies the NRC regulatory requirements and conforms to applicable NRC


SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000482/2008010) AND REQUEST FOR INFORMATION
Wolf Creek Nuclear Operating Corp.          -2-
Dear Mr. Muench:  
and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant
systems required to achieve and maintain safe shutdown conditions from inside and outside the
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC), Region IV staff will conduct a triennial fire protection baseline inspection at your Wolf Creek Generating Station in September and October of 2008.  The inspection team will be comprised of reactor inspectors from the NRC Region IV office and a contractor. The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection  
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant
(Triennial).
fire protection systems, and (4) the fire protection program and its implementation should be
The schedule for the inspection is as follows:
available to support the team at the site during the inspection.
* Information gathering visit:  September 10 - 11, 2008
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection team's information or logistical needs, please
contact the lead inspector, John Mateychick, at 817-276-6560.
                                              Sincerely,
                                                /RA/
                                              Neil OKeefe, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket: 50-482
License: DPR-42
Enclosure: Triennial Fire Protection
  Inspection Supporting Documentation
cc w/enclosure:
Vice President Operations/Plant Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037


* Onsite inspection:  September 29 - October 3, 2008    October 20 - 24, 2008
Wolf Creek Nuclear Operating Corp.      -3-
The team will visit the Wolf Creek Generating Station on September 10-11, 2008, to gather
Supervisor Licensing
information, select the fire areas for evaluation, identify documents needed to support the inspection, obtain unescorted access, and to become familiar with your fire protection program. The enclosure to this letter provides an initial list of the documents the team will want to review. You are requested to transmit copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection.  We would appreciate it if you could send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612
Attorney General
120 S.W. 10th Avenue, 2nd Floor
Topeka, KS 66612-1597
County Clerk
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839
Chief, Radiation and Asbestos
  Control Section
Kansas Department of Health and
  Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366


We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review.  Of specific interest are those documents that establish that your fire
Wolf Creek Nuclear Operating Corp.       -4-
protection program satisfies the NRC regulatory requirements and conforms to applicable NRC UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Electronic distribution by RIV:
Wolf Creek Nuclear Operating Corp. - 2 -  
Regional Administrator (Elmo.Collins@nrc.gov )
  and industry fire protection guidance.  Also, appropriate personnel knowledgeable of: (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant
DRP Director (Dwight.Chamberlain@nrc.gov)
fire protection systems, and (4) the fire protection program and its implementation should be available to support the team at the site during the inspection.  
DRP Deputy Director (Anton.Vegel@nrc.gov )
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
DRS Director (Roy.Caniano@nrc.gov )
  Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact the lead inspector, John Mateychick, at 817-276-6560.  
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov )
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick Deese@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
DRS STA (Dale.Powers@nrc.gov )
P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov )
ROPreports
WC Site Secretary (Shirley.Allen@nrc.gov )
SUNSI Review Completed: ______ADAMS: Yes                G No    Initials: ______
  Publicly Available      G Non-Publicly Available G Sensitive      Non-Sensitive
S :DRS\REPORTS\WC 2008010 tfp-JMM.
SRI:DRS/EB2          C: EB2
JMM/tek              NFOKeefe
/RA/                /RA/
07/7/08              07/10/08
OFFICIAL RECORD COPY T=Telephone                E=E-mail    F=Fax


      Sincerely,
                                              ENCLOSURE
/RA/
                Triennial Fire Protection Inspection Documentation Requested
      Neil O'Keefe, Chief      Engineering Branch 2       Division of Reactor Safety
Please provide the following documentation prior to the onsite information-gathering trip,
Docket:  50-482
preferably no later than August 29, 2008. Where practical, please provide copies electronically.
License:  DPR-42
1.      The current version of your fire protection program and fire hazards analysis.
Enclosure:  Triennial Fire Protection     Inspection Supporting Documentation
2.      Post-fire safe shutdown analysis and the supporting calculations that demonstrate
        acceptable plant response.
cc w/enclosure: Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
3.      Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,
        pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters
        to/from the NRC regarding fire protection/fire safe shutdown, etc.).
4.      The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant
        Examination for External Events report addressing fire events.
Please provide the following documentation during the information-gathering visit or by
September 19, 2008, in order to support inspection preparation. Where practical, please
provide copies electronically. However, drawings should be provided as paper copies of
sufficient size that all details are legible.
5.      Fire protection program implementing procedures (e.g., administrative controls, operator
        response procedures for fires, fire fighting procedures, etc.).
6.      Operating procedures used for achieving and maintaining hot and cold shutdown
        conditions from the control room in the event of a fire outside the control room (III.G.2
        areas).
7.      Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)
        capability with or without control room evacuation.
8.      Pre-fire plans for the selected fire areas (areas to be selected by the team during the
        information-gathering trip).
9.      A list of equipment used to achieve and maintain hot standby and cold shutdowns in the
        event of a fire (safe shutdown equipment lists).
10.     Piping and instrumentation (flow) diagrams showing the components used to achieve
        and maintain hot standby and cold shutdown for normal and alternate shutdown. Please
        provide two copies of the piping and instrumentation (flow) diagrams for these systems
        of a size sufficient to read all details. These should include the systems used for RCS
        makeup, RCS pressure control, decay heat removal, and reactivity control, including the
        essential support systems.
                                              -1-                                Enclosure


Jay Silberg, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC  20037 
11. Plant layout and equipment drawings for the selected fire areas (these areas will be
Wolf Creek Nuclear Operating Corp. - 3 -
    selected during the information gathering trip) that identify: (a) the physical plant
  Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411
    locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or
Burlington, KS  66839 Chief Engineer Utilities Division
    fire zone delineation; and (c) the locations of fire protection equipment, such as
Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS  66604-4027 Office of the Governor State of Kansas Topeka, KS  66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS  66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS  66839 Chief, Radiation and Asbestos    Control Section Kansas Department of Health and   Environment Bureau of Air and Radiation
    detection, suppression, and post-fire emergency lighting units; and (d) fire area
1000 SW Jackson, Suite 310 Topeka, KS  66612-1366 
    boundaries.
Wolf Creek Nuclear Operating Corp. - 4 -
12. A listing of design change packages which were determined to impact fire protection and
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov ) Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/B (Rick Deese@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) DRS STA (Dale.Powers@nrc.gov ) P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov ) ROPreports WC Site Secretary (Shirley.Allen@nrc.gov )
    post-fire safe shutdowns, performed in the last 3 years.
   
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
   
14. A listing of open and closed corrective action documents initiated in the last 3 years,
   
    which relate to the fire protection program or equipment. Include corrective action
     SUNSI Review Completed:  ______ADAMS:  Yes G  No            Initials: ______    Publicly Available     
    document number, date, and subject.
G  Non-Publicly Available     
15. A listing of the applicable codes and standards (with the versions) related to the design
G  Sensitive    Non-Sensitive S :DRS\REPORTS\WC 2008010 tfp-JMM. SRI:DRS/EB2 C: EB2     JMM/tek NFO'Keefe    /RA/ /RA/    07/7/08 07/10/08   
    of plant fire protection features and evaluations of any code deviations.
OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax 
16. Drawings of the portions of the emergency lighting system which support fire response.
  - 1 - Enclosure ENCLOSURE  Triennial Fire Protection Inspection Documentation Requested
17. Procedures used to remove smoke from safety-related areas and the engineering
  Please provide the following documentation prior to the onsite information-gathering trip, preferably no later than August 29, 2008. Where practical, please provide copies electronically.
    studies or calculations which support the design basis.
1. The current version of your fire protection program and fire hazards analysis.  
18. Drawings of communication systems credited in the license basis for firefighting and
    plant operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years performance
    history for fire protection program systems or functions monitored within the
    Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation,
    surveillance test requirements) covered by Technical Specifications, Technical
     Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar
     reviews related to post-fire safe shutdown capability or the fire protection program
    completed since November 1, 2005.
24. A list of manual actions taken outside the control room which are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
    group actions by the initiating fire area or zone and indicate where the action must take
    place.
                                          -2-                                  Enclosure


2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response. 
25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design
3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports, pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
    basis documents that describe the purpose/function/operating characteristics of the safe
4. The Fire Probabilistic Risk Assessment or portions of the plant's Individual Plant Examination for External Events report addressing fire events.
    shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay
Please provide the following documentation during the information-gathering visit or by
    heat removal, and reactivity control, including the essential support systems).
September 19, 2008, in order to support inspection preparation.  Where practical, please provide copies electronically.  However, drawings should be provided as paper copies of sufficient size that all details are legible. 
26. Two copies of one-line diagrams of the electrical distribution system. These should
5. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.). 
    depict how power gets from the switchyard to the engineered safety feature loads (480V
6. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).  7. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.
    and 4160V). Also, include the vital DC distribution system one-line diagrams.
8. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip). 
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
9. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the event of a fire (safe shutdown equipment lists).
    giving location and the key equipment being protected.
10. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or
provide two copies of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for RCS makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.
    maintain hot shutdown and b) reach and/or maintain cold shutdown.
 
29. A list of high to low pressure interface valves.
  - 2 - Enclosure 11. Plant layout and equipment drawings for the selected fire areas (these areas will be selected during the information gathering trip) that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as detection, suppression, and post-fire emergency lighting units; and (d) fire area
30. A copy of procedures governing the training and operation of the fire brigade.
boundaries. 
31. Organization charts of site personnel down to the level of fire protection staff personnel.
12. A listing of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed in the last 3 years.
32. A contact list of key site personnel who will be supporting this inspection, giving location
    of their office and phone number onsite.
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
33. The team would like to observe a fire brigade drill in the plant, if possible, during the
14. A listing of open and closed corrective action documents initiated in the last 3 years, which relate to the fire protection program or equipment.  Include corrective action document number, date, and subject.
    week of October 20, 2008. Please put us in contact with the appropriate personnel for
15. A listing of the applicable codes and standards (with the versions) related to the design of plant fire protection features and evaluations of any code deviations.
    planning drills during the onsite information gathering trip.
16. Drawings of the portions of the emergency lighting system which support fire response. 
34. The team would like to perform a walkthrough of the procedure for control room
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations which support the design basis.
    evacuation due to fire with qualified operators in the plant during the week of September
18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.
    29, 2008. Please put us in contact with the appropriate personnel for planning the
    walkthrough during the onsite information gathering trip.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
                                          -3-                                  Enclosure
20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years' performance history for fire protection program systems or functions monitored within the Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since November 1, 2005.
24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate where the action must take place. 
  - 3 - Enclosure 25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems).  
26. Two copies of one-line diagrams of the electrical distribution system. These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V). Also, include the vital DC distribution system one-line diagrams.
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.  
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  
29. A list of high to low pressure interface valves.  
30. A copy of procedures governing the training and operation of the fire brigade.  
31. Organization charts of site personnel down to the level of fire protection staff personnel.  
32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  
33. The team would like to observe a fire brigade drill in the plant, if possible, during the week of October 20, 2008. Please put us in contact with the appropriate personnel for planning drills during the onsite information gathering trip.  
34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of September 29, 2008. Please put us in contact with the appropriate personnel for planning the walkthrough during the onsite information gathering trip.
}}
}}

Latest revision as of 16:01, 14 November 2019

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482-08-010) and Request for Information
ML081930252
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/11/2008
From: O'Keefe N
NRC/RGN-IV/DRS/EB2
To: Muench R
Wolf Creek
References
IR-08-010
Download: ML081930252 (7)


See also: IR 05000482/2008010

Text

UNITE D S TATES

NUC LEAR RE GULATOR Y C OMMIS SI ON

R EG I O N I V

612 EAST LAMAR BLVD , SU ITE 400

AR L IN GTON , TEXAS 7 6 011 - 4125

July 11, 2008

Rick A. Muench, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000482/2008010) AND REQUEST FOR INFORMATION

Dear Mr. Muench:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Wolf Creek

Generating Station in September and October of 2008. The inspection team will be comprised

of reactor inspectors from the NRC Region IV office and a contractor. The team will conduct the

inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection

(Triennial)."

The schedule for the inspection is as follows:

  • Information gathering visit: September 10 - 11, 2008
  • Onsite inspection: September 29 - October 3, 2008

October 20 - 24, 2008

The team will visit the Wolf Creek Generating Station on September 10-11, 2008, to gather

information, select the fire areas for evaluation, identify documents needed to support the

inspection, obtain unescorted access, and to become familiar with your fire protection program.

The enclosure to this letter provides an initial list of the documents the team will want to review.

You are requested to transmit copies of the documents listed in the enclosure to the NRC

Region IV office for team use in preparation for the inspection. We would appreciate it if you

could send this information so that it will arrive in our office in Arlington, Texas, by the dates

listed in the enclosure.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies the NRC regulatory requirements and conforms to applicable NRC

Wolf Creek Nuclear Operating Corp. -2-

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

fire protection systems, and (4) the fire protection program and its implementation should be

available to support the team at the site during the inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact the lead inspector, John Mateychick, at 817-276-6560.

Sincerely,

/RA/

Neil OKeefe, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-482

License: DPR-42

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

cc w/enclosure:

Vice President Operations/Plant Manager

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N Street, NW

Washington, DC 20037

Wolf Creek Nuclear Operating Corp. -3-

Supervisor Licensing

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Road

Topeka, KS 66604-4027

Office of the Governor

State of Kansas

Topeka, KS 66612

Attorney General

120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

County Clerk

Coffey County Courthouse

110 South 6th Street

Burlington, KS 66839

Chief, Radiation and Asbestos

Control Section

Kansas Department of Health and

Environment

Bureau of Air and Radiation

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Wolf Creek Nuclear Operating Corp. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov )

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick Deese@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

DRS STA (Dale.Powers@nrc.gov )

P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov )

ROPreports

WC Site Secretary (Shirley.Allen@nrc.gov )

SUNSI Review Completed: ______ADAMS: Yes G No Initials: ______

Publicly Available G Non-Publicly Available G Sensitive Non-Sensitive

S :DRS\REPORTS\WC 2008010 tfp-JMM.

SRI:DRS/EB2 C: EB2

JMM/tek NFOKeefe

/RA/ /RA/

07/7/08 07/10/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation prior to the onsite information-gathering trip,

preferably no later than August 29, 2008. Where practical, please provide copies electronically.

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant

Examination for External Events report addressing fire events.

Please provide the following documentation during the information-gathering visit or by

September 19, 2008, in order to support inspection preparation. Where practical, please

provide copies electronically. However, drawings should be provided as paper copies of

sufficient size that all details are legible.

5. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

6. Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

7. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

8. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

9. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

10. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for normal and alternate shutdown. Please

provide two copies of the piping and instrumentation (flow) diagrams for these systems

of a size sufficient to read all details. These should include the systems used for RCS

makeup, RCS pressure control, decay heat removal, and reactivity control, including the

essential support systems.

-1- Enclosure

11. Plant layout and equipment drawings for the selected fire areas (these areas will be

selected during the information gathering trip) that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and (c) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units; and (d) fire area

boundaries.

12. A listing of design change packages which were determined to impact fire protection and

post-fire safe shutdowns, performed in the last 3 years.

13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14. A listing of open and closed corrective action documents initiated in the last 3 years,

which relate to the fire protection program or equipment. Include corrective action

document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations.

16. Drawings of the portions of the emergency lighting system which support fire response.

17. Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21. Maintenance Rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

Maintenance Rule program.

22. A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, Updated Final Safety Analysis Report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since November 1, 2005.

24. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

-2- Enclosure

25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay

heat removal, and reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to the engineered safety feature loads (480V

and 4160V). Also, include the vital DC distribution system one-line diagrams.

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33. The team would like to observe a fire brigade drill in the plant, if possible, during the

week of October 20, 2008. Please put us in contact with the appropriate personnel for

planning drills during the onsite information gathering trip.

34. The team would like to perform a walkthrough of the procedure for control room

evacuation due to fire with qualified operators in the plant during the week of September

29, 2008. Please put us in contact with the appropriate personnel for planning the

walkthrough during the onsite information gathering trip.

-3- Enclosure