ML082350047: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:August 21, 2008 | {{#Wiki_filter:August 21, 2008 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 | ||
Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ | |||
==SUBJECT:== | ==SUBJECT:== | ||
OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION) | OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION) | ||
==Dear Mr. Levis:== | ==Dear Mr. Levis:== | ||
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station. | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station. | ||
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence. | |||
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence. | The NRC has approved the subject examination and the NRC staff will administer the operating test in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of August 25, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046. | ||
This letter only authorizes administration of the operating test. Authorization to administer the written exam will be the subject of separate correspondence. | |||
The NRC has approved the subject examination and the NRC staff will | Please contact your Chief Examiner, Brian C. Haagensen at 610-337-5084, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (operating test) specified for each applicant. | ||
Sincerely, | |||
/RA by Darrell Roberts acting for/ | |||
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272; 50-311 | |||
Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 | |||
==SUBJECT:== | ==SUBJECT:== | ||
OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION) | OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION) | ||
==Dear Mr. Levis:== | ==Dear Mr. Levis:== | ||
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station. | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station. | ||
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence. | |||
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence. | The NRC has approved the subject examination and the NRC staff will administer the operating test in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of August 25, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046. | ||
This letter only authorizes administration of the operating test. Authorization to administer the written exam will be the subject of separate correspondence. | |||
The NRC has approved the subject examination and the NRC staff will | Please contact your Chief Examiner, Brian C. Haagensen at 610-337-5084, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (operating test) specified for each applicant. | ||
Sincerely, | |||
This letter only authorizes administration of the operating test. Authorization to administer the written exam will be the subject of separate correspondence. | /RA by Darrell Roberts acting for/ | ||
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272; 50-311 SUNSI Review Complete: BH (Reviewer=s Initials) ADAMS PKG: ML# 080030005 DOCUMENT NAME: g:\drs\opsbr\Haagensen\Exam FY 08 Salem Aug 2008\ExamApprovalLtr.doc ADAMS ACC: ML082350047 After declaring this document AAn Official Agency Record@ it will be released to the Public. | |||
Please contact your Chief Examiner, Brian C. Haagensen at 610-337-5084, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (operating test) specified for each applicant. | To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS NAME CBixler/DS/CB BHaagensen/BH SHansell/D.Roberts for DATE 08/21/08 08/21/08 08/21/08 OFFICE NAME DATE OFFICIAL RECORD COPY | ||
Sincerely, | |||
Docket Nos. 50-272; 50-311 | |||
SUNSI Review Complete: | |||
=s Initials) | |||
@ it will be released to the Public. To receive a copy of this document, indicate in the box: | |||
" C" = Copy without attachment/enclosure | |||
DATE | |||
W. Levis | W. Levis 2 cc: | ||
T. Joyce, Senior Vice President, Operations R. Braun, Site Vice President K. Chambliss, Vice President, Nuclear Oversight J. Spears, Acting Director of Finance G. Gellrich, Salem Plant Manager M. Kafantaris, Training Director J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan, Chief, NJ Bureau of Nuclear Engineering, DEP H. Otto, Ph.D., Administrator, DE Interagency Programs, DNREC Div of Water Resources Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance | |||
Distribution w/encl: | W. Levis 3 Distribution w/encl: (via e-mail) | ||
S. Collins, RA M. Dapas, DRA D. Roberts, DRS D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP D. Schroeder, DRP, Sr Resident Inspector H. Balian, DRP, Resident Inspector K. Venuto, DRP, Resident OA S. Williams, RI OEDO R. Nelson, NRR H. Chernoff, NRR R. Ennis, NRR, PM J. Shea, NRR, Backup D. Collins, NRR S. Bailey, NRR T. Valentine, NRR S. Hansell, DRS B. Haagensen, DRS Distribution w/encl: | |||
DRS Master Exam File (C. Bixler) (w/concurrences) | DRS Master Exam File (C. Bixler) (w/concurrences) | ||
DRS File}} | DRS File}} |
Latest revision as of 13:42, 14 November 2019
ML082350047 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 08/21/2008 |
From: | Hansell S Division of Reactor Safety I |
To: | Levis W Public Service Enterprise Group |
Shared Package | |
ML080030005 | List: |
References | |
Download: ML082350047 (3) | |
Text
August 21, 2008 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION)
Dear Mr. Levis:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examination and the NRC staff will administer the operating test in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of August 25, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.
This letter only authorizes administration of the operating test. Authorization to administer the written exam will be the subject of separate correspondence.
Please contact your Chief Examiner, Brian C. Haagensen at 610-337-5084, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (operating test) specified for each applicant.
Sincerely,
/RA by Darrell Roberts acting for/
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272; 50-311
Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL - OPERATING TEST (SALEM GENERATING STATION)
Dear Mr. Levis:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Salem Generating Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Marios Kafantaris, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examination and the NRC staff will administer the operating test in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of August 25, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.
This letter only authorizes administration of the operating test. Authorization to administer the written exam will be the subject of separate correspondence.
Please contact your Chief Examiner, Brian C. Haagensen at 610-337-5084, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (operating test) specified for each applicant.
Sincerely,
/RA by Darrell Roberts acting for/
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272; 50-311 SUNSI Review Complete: BH (Reviewer=s Initials) ADAMS PKG: ML# 080030005 DOCUMENT NAME: g:\drs\opsbr\Haagensen\Exam FY 08 Salem Aug 2008\ExamApprovalLtr.doc ADAMS ACC: ML082350047 After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS NAME CBixler/DS/CB BHaagensen/BH SHansell/D.Roberts for DATE 08/21/08 08/21/08 08/21/08 OFFICE NAME DATE OFFICIAL RECORD COPY
W. Levis 2 cc:
T. Joyce, Senior Vice President, Operations R. Braun, Site Vice President K. Chambliss, Vice President, Nuclear Oversight J. Spears, Acting Director of Finance G. Gellrich, Salem Plant Manager M. Kafantaris, Training Director J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan, Chief, NJ Bureau of Nuclear Engineering, DEP H. Otto, Ph.D., Administrator, DE Interagency Programs, DNREC Div of Water Resources Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance
W. Levis 3 Distribution w/encl: (via e-mail)
S. Collins, RA M. Dapas, DRA D. Roberts, DRS D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP D. Schroeder, DRP, Sr Resident Inspector H. Balian, DRP, Resident Inspector K. Venuto, DRP, Resident OA S. Williams, RI OEDO R. Nelson, NRR H. Chernoff, NRR R. Ennis, NRR, PM J. Shea, NRR, Backup D. Collins, NRR S. Bailey, NRR T. Valentine, NRR S. Hansell, DRS B. Haagensen, DRS Distribution w/encl:
DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File