Senior Reactor and Reactor Operator Initial Examinations - (Salem Generating Station)
ML081060248
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/11/2008
From: Hansell S
Operations Branch I
To: Levis W
Public Service Enterprise Group
Shared Package
ML080030005 List:
References
Download: ML081060248 (7)


Text

April 11, 2008 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -

(SALEM GENERATING STATION)

Dear Mr. Levis:

In a telephone conversation on April 2, 2008, between Mr. Brian C. Haagensen, and Mr. Glen Marshall, arrangements were made for the administration of licensing examinations at Salem Nuclear Station during the week of August 25, 2008. Exam validation is scheduled for the week of July 21, 2008.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC=s regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 12, 2008. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by July 1, 2008. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

Mr. W. Levis 2 examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, which expires on June 30, 2009, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosures will be available electronically for public inspection in the NRC=s Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Glenn Marshall has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Brian C. Haagensen at (610) 337-5084, or me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75

Mr. W. Levis 2 examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, which expires on June 30, 2009, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosures will be available electronically for public inspection in the NRC=s Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Glenn Marshall has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Brian C. Haagensen at (610) 337-5084, or me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 SUNSI Review Complete: BCH (Reviewer=s Initials)

ADAMS PKG #ML080030005 ADAMS ACC#ML081060248 DOCUMENT NAME: T:\DRS\Operations Branch\HAAGENSEN\Exam FY08 Salem Aug 2008\120dayexamltr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

OFFICE RI/DRS RI/DRS RI/DRS NAME CJBixler/CJB BCHaagensen/BCH SLHansell/SLH DATE 04/9/08 04/9/08 04/11/08 OFFICIAL RECORD COPY

Mr. W. Levis 3 cc w/encl:

T. Joyce, Senior Vice President, Operations R. Braun, Site Vice President K. Chambliss, Vice President, Nuclear Oversight J. Spears, Acting Director of Finance G. Gellrich, Salem Plant Manager J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan, Chief, NJ Bureau of Nuclear Engineering, DEP H. Otto, Ph.D., Administrator, DE Interagency Programs, DNREC Div of Water Resources Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance M. Kafantaris, Training Director (Salem Generating Station)

Mr. W. Levis 4 Distribution w/encl: (via e-mail)

S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS D. Roberts, DRS S. Hansell, DRS B. Haagensen, DRS D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP J. Tomlinson, DRP D. Schroeder, DRP, Sr Resident Inspector H. Balian, DRP, Resident Inspector K. Venuto, DRP, Resident OA S. Williams, RI OEDO J. Lubinski, NRR H. Chernoff, NRR R. Ennis, NRR, PM J. Shea, NRR, Backup D. Collins, NRR S. Bailey, NRR T. Valentine, NRR Region I Docket Room (with concurrences)

Distribution w/encl:

DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File