ML083250062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:November 19, 2008 Michael Perito Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 November 19, 2008 Michael Perito Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775  
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775


==SUBJECT:==
==SUBJECT:==
RIVER BEND STATION, UNIT 1, - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000458/2008301
RIVER BEND STATION, UNIT 1, - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000458/2008301


==Dear Mr. Perito:==
==Dear Mr. Perito:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at River Bend Station, Unit 1.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at River Bend Station, Unit 1.
 
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to John Fralick, Superintendent Operations Initial Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to John Fralick, Superintendent Operations Initial Training. Note that any examination waivers and application denials have been addressed in separate correspondence.  
 
The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, on November 21, 2008. The NRC staff will administer the operating tests during the week of December 1, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 860-8159.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, on November 21, 2008. The NRC staff will administer the operating tests during the week of December 1, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 860-8159.
Please contact your Chief Examiner, Brian Larson, at (817) 860-8172, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Please contact your Chief Examiner, Brian Larson, at (817) 860-8172, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
Sincerely,
                                                  /RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety


      /RA/        Ryan E. Lantz, Chief Operations Branch      Division of Reactor Safety UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
Entergy Operations, Inc.                   Docket: 50-458 License: NPF-47
Docket:   50-458 License: NPF-47  


==Enclosure:==
==Enclosure:==
ES-201-4 cc w/enclosure:
ES-201-4 cc w/enclosure:
John Fralick, Superintendent   Operation Initial Training Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 cc w/o enclosure Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995  
John Fralick, Superintendent Operation Initial Training Entergy Operations, Inc.
 
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 cc w/o enclosure Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.
Senior Vice President and COO Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995  
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc.
 
P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995  
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806
 
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995  
 
Manager, Licensing Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9005  
 
Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806  
 
Entergy Operations, Inc.
President of West Feliciana  Police Jury P.O. Box 1921 St. Francisville, LA  70775 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA  71497
 
Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX  78701-3326
 
Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX  78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and  Response Division P.O. Box 4312 Baton Rouge,  LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge,  LA 70821-4312 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX  76209


Entergy Operations, Inc.
Entergy Operations, Inc.                   President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) Resident Inspector (Charles.Norton@nrc.gov) Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov) RBS Site Secretary (Lisa.Day@nrc.gov) Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)


SUNSI Review Completed: LAH ADAMS:   Yes   No           Initials: LAH     Publicly Available         Non-Publicly Available         Sensitive   Non-Sensitive LA:OB SOE:OB C:OB   LAHurley BTLarson RELantz   /RA/ /RA/ /RA/
Entergy Operations, Inc.                      Electronic distribution by RIV:
11/06/08 11/18/08 11/18/08   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax}}
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Resident Inspector (Charles.Norton@nrc.gov)
Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)
RBS Site Secretary (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
SUNSI Review Completed: LAH ADAMS: Yes No                   Initials: LAH Publicly Available       Non-Publicly Available   Sensitive           Non-Sensitive LA:OB                 SOE:OB           C:OB LAHurley             BTLarson         RELantz
/RA/                 /RA/             /RA/
11/06/08             11/18/08         11/18/08 OFFICIAL RECORD COPY T=Telephone                   E=E-mail   F=Fax}}

Latest revision as of 12:00, 14 November 2019

RBS - 12/2008 - Initial Examination - Examination Approval Letter
ML083250062
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/19/2008
From: Ryan Lantz
Operations Branch IV
To: Mike Perito
Entergy Operations
References
IR-08-301
Download: ML083250062 (4)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 November 19, 2008 Michael Perito Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1, - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000458/2008301

Dear Mr. Perito:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at River Bend Station, Unit 1.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to John Fralick, Superintendent Operations Initial Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, on November 21, 2008. The NRC staff will administer the operating tests during the week of December 1, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 860-8159.

Please contact your Chief Examiner, Brian Larson, at (817) 860-8172, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety

Entergy Operations, Inc. Docket: 50-458 License: NPF-47

Enclosure:

ES-201-4 cc w/enclosure:

John Fralick, Superintendent Operation Initial Training Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 cc w/o enclosure Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806

Entergy Operations, Inc. President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Resident Inspector (Charles.Norton@nrc.gov)

Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)

RBS Site Secretary (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

SUNSI Review Completed: LAH ADAMS: Yes No Initials: LAH Publicly Available Non-Publicly Available Sensitive Non-Sensitive LA:OB SOE:OB C:OB LAHurley BTLarson RELantz

/RA/ /RA/ /RA/

11/06/08 11/18/08 11/18/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax