ML091050600: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091050600
| number = ML091050600
| issue date = 04/15/2009
| issue date = 04/15/2009
| title = Diablo Canyon, Units 1 and 2 -Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000275-09-0008 and 0500323-09-008) Request for Information
| title = Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000275-09-0008 and 0500323-09-008) Request for Information
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Conway J T
| addressee name = Conway J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:April 15, 2009  
{{#Wiki_filter:UNITED STATES
  John T. Conway Senior Vice President &
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
     Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424  
                                                    R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
                                          AR LI N GTON , TEXAS 76011-4125
                                              April 15, 2009
John T. Conway
Senior Vice President &
     Chief Nuclear Officer
Pacific Gas and Electric Company
P. O. Box 3
Mail Code 104/6/601
Avila Beach, CA 93424
SUBJECT:          DIABLO CANYON, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL
                  FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                  REPORT 05000275/2009008 and 05000323/2009008) REQUEST FOR
                  INFORMATION
Dear Mr. Conway:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at your Diablo Canyon
facility in July 2009. The inspection team will be comprised of reactor inspectors from the NRC
Region IV office. The team will conduct the inspection in accordance with the baseline
Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."
The schedule for the inspection is as follows:
          *      Information gathering visit:      June 10 - 11, 2009
          *      Onsite inspection:                July 06 - 10, 2009
                                                    July 20 - 24, 2009
Three individuals will participate in the information gathering visit, to select the fire areas for
evaluation, identify additional documents needed to support the inspection, obtain unescorted
access, meet with the key personnel who will support the inspection, and become familiar with
your fire protection program. The enclosure to this letter provides an initial list of the documents
the team will want to review. We request that your staff transmit copies of the documents listed
in the enclosure to the NRC Region IV office for team use in preparation for the inspection.
Please send this information so that it will arrive in our office in Arlington, Texas, by the dates
listed in the enclosure.
We request that during the onsite inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest are those documents that establish that your fire
protection program satisfies the NRC regulatory requirements and conforms to applicable NRC
and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant
systems required to achieve and maintain safe shutdown conditions from inside and outside the
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant


SUBJECT: DIABLO CANYON, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000275/2009008 and 05000323/2009008) REQUEST FOR INFORMATION
Pacific Gas and Electric                    -2-
  Dear Mr. Conway:
fire protection systems, and (4) the fire protection program and its implementation should be
available to support the team at the site during the inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection team's information or logistical needs, please
contact the lead inspector, John Mateychick, at 817-276-6560.
                                              Sincerely,
                                              /RA/
                                              Neil OKeefe, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Dockets: 50-275; 50-323
Licenses: DPR-80; DPR-82
Enclosure: Triennial Fire Protection
  Inspection Supporting Documentation
DISTRIBUTION:
Sierra Club San Lucia Chapter
ATTN: Andrew Christie
P. O. Box 15755
San Luis Obispo, CA 93406
Nancy Culver
San Luis Obispo
  Mothers for Peace
P. O. Box 164
Pismo Beach, CA 93448
Chairman
San Luis Obispo County
  Board of Supervisors
1055 Monterey Street, Suite D430
San Luis Obispo, CA 93408
Truman Burns\Robert Kinosian
California Public Utilities Commission
505 Van Ness Ave., Rm. 4102
San Francisco, CA 94102


The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC), Region IV staff will conduct a triennial fire protection baseline inspection at your Diablo Canyon facility in July 2009. The inspection team will be comprised of reactor inspectors from the NRC Region IV office. The team will conduct the inspection in accordance with the baseline
Pacific Gas and Electric              -3-
Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."  
Diablo Canyon Independent Safety Committee
The schedule for the inspection is as follows:
Attn: Robert R. Wellington, Esq.
* Information gathering visit:  June 10 - 11, 2009
Legal Counsel
857 Cass Street, Suite D
Monterey, CA 93940
Director, Radiological Health Branch
State Department of Health Services
P. O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
City Editor
The Tribune
3825 South Higuera Street
P. O. Box 112
San Luis Obispo, CA 93406-0112
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 31)
Sacramento, CA 95814
James R. Becker, Site Vice President &
  Station Director
Diablo Canyon Power Plant
P. O. Box 56
Avila Beach, CA 93424
Jennifer Tang
Field Representative
United States Senator Barbara Boxer
1700 Montgomery Street, Suite 240
San Francisco, CA 94111
Chief, Radiological Emergency Preparedness Section
FEMA Region 9
1111 Broadway, Suite 1200
Oakland, CA 94607-4052


* Onsite inspection:  July 06 - 10, 2009    July 20 - 24, 2009
Pacific Gas and Electric                  -4-
Three individuals will participate in the information gathering visit, to select the fire areas for
Electronic distribution by RIV:
evaluation, identify additional documents needed to support the inspection, obtain unescorted access, meet with the key personnel who will support the inspection, and become familiar with your fire protection programThe enclosure to this letter provides an initial list of the documents the team will want to reviewWe request that your staff transmit copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection. Please send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.  
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov)
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
DC Site Secretary (Agnes.Chan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
File located: R:REACTORS\DC 2009008 RFI-TFP                          ML091050600
  SUNSI Rev Compl. X Yes No              ADAMS    X Yes No      Reviewer Initials  JMM
  Publicly Avail          X Yes No      Sensitive  Yes X No    Sens. Type Initials JMM
EB2                      C: EB 2
J. Mateychick            N.OKeefe
/RA/                    /RA/
04/13 /09                04/15/09
OFFICIAL RECORD COPY                                T=Telephone      E=E-mail      F=Fax


We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest are those documents that establish that your fire  
                                              ENCLOSURE
protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
                Triennial Fire Protection Inspection Documentation Requested
Pacific Gas and Electric
Please provide the following documentation items 1 - 4 prior to the onsite information-gathering
- 2 - fire protection systems, and (4) the fire protection program and its implementation should be available to support the team at the site during the inspection.  
visit, preferably no later than June 1, 2009. Where practical, please provide copies
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
electronically.
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
1.      The current version of your fire protection program and fire hazards analysis.
2.      Post-fire safe shutdown analysis and the supporting calculations that demonstrate
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact the lead inspector, John Mateychick, at 817-276-6560.  
        acceptable plant response.
      Sincerely, 
3.       Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,
      /RA/
        pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters
        to/from the NRC regarding fire protection/fire safe shutdown, etc.).
4.      The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant
        Examination for External Events report addressing fire events.
Please provide the following documentation items 5 - 37 during the information-gathering visit or
by June 29, 2009, in order to support inspection preparation. Whenever practical, please
provide copies electronically. However, drawings should be provided as paper copies of
sufficient size that all details are legible.
5.      Plant layout and equipment drawings for the selected fire areas (these areas will be
        selected during the information gathering trip) that identify: (a) the physical plant
        locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or
        fire zone delineation; and (c) the locations of fire protection equipment, such as
        detection, suppression, and post-fire emergency lighting units; and (d) fire area
        boundaries.
6.      Fire protection program implementing procedures (e.g., administrative controls, operator
        response procedures for fires, fire fighting procedures, etc.).
7.       Operating procedures used for achieving and maintaining hot and cold shutdown
        conditions from the control room in the event of a fire outside the control room (III.G.2
        areas).
8.       Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)
        capability with or without control room evacuation.
9.      Pre-fire plans for the selected fire areas (areas to be selected by the team during the
        information-gathering trip).
10.      A list of equipment used to achieve and maintain hot standby and cold shutdowns in the
        event of a fire (safe shutdown equipment lists).
                                              -1-                                  Enclosure


      Neil O'Keefe, Chief      Engineering Branch 2      Division of Reactor Safety  
11. Piping and instrumentation (flow) diagrams showing the components used to achieve
    and maintain hot standby and cold shutdown for normal and alternate shutdown. Please
Dockets:  50-275; 50-323 Licenses:  DPR-80; DPR-82
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of
Enclosure:  Triennial Fire Protection    Inspection Supporting Documentation
    a size sufficient to read all details. These should include the systems used for RCS
    makeup, RCS pressure control, decay heat removal, and reactivity control, including the
    essential support systems.
12. A listing of design change packages which were determined to impact fire protection and
    post-fire safe shutdowns, performed in the last 3 years.
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
14. A listing of open and closed corrective action documents initiated in the last 3 years,
    which relate to the fire protection program or equipment. Include corrective action
    document number, date, and subject.
15. A listing of the applicable codes and standards (with the versions) related to the design
    of plant fire protection features and evaluations of any code deviations.
16. Drawings of the portions of the emergency lighting system which support fire response
    and post-fire safe shutdown.
17. Procedures used to remove smoke from safety-related areas and the engineering
    studies or calculations which support the design basis.
18. Drawings of communication systems credited in the license basis for firefighting and
    plant operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years performance
    history for fire protection program systems or functions monitored within the
    Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation,
    surveillance test requirements) covered by Technical Specifications, Technical
    Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar
    reviews related to post-fire safe shutdown capability or the fire protection program
    completed since January 1, 2006.
24. A list of manual actions taken outside the control room which are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
    group actions by the initiating fire area or zone and indicate the location where the action
    must take place.
                                          -2-                                 Enclosure


  DISTRIBUTION: Sierra Club San Lucia Chapter ATTN:  Andrew Christie 
25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design
P. O. Box 15755 San Luis Obispo, CA  93406
    basis documents that describe the purpose/function/operating characteristics of the safe
Nancy Culver San Luis Obispo
    shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay
Mothers for Peace P. O. Box 164 Pismo Beach, CA 93448
    heat removal, and reactivity control, including the essential support systems).
Chairman San Luis Obispo County    Board of  Supervisors
26. Two copies of one-line diagrams of the electrical distribution system. These should
1055 Monterey Street, Suite D430 San Luis Obispo, CA  93408
    depict how power gets from the switchyard to the engineered safety feature loads (480V
Truman Burns\Robert Kinosian California Public Utilities Commission
    and 4160V). Also, include the vital DC distribution system one-line diagrams.
505 Van Ness Ave., Rm. 4102 San Francisco, CA  94102
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
 
    giving location and the key equipment being protected.
Pacific Gas and Electric
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or
- 3 -  Diablo Canyon Independent Safety Committee Attn:  Robert R. Wellington, Esq. Legal Counsel 857 Cass Street, Suite D
    maintain hot shutdown and b) reach and/or maintain cold shutdown.
Monterey, CA  93940
29. A list of high to low pressure interface valves.
  Director, Radiological Health Branch State Department of Health Services
30. A copy of procedures governing the training and operation of the fire brigade.
P. O. Box 997414 (MS 7610) Sacramento, CA  95899-7414
31. Organization charts of site personnel down to the level of fire protection staff personnel.
City Editor The Tribune 3825 South Higuera Street P. O. Box 112
32. A contact list of key site personnel who will be supporting this inspection, giving location
San Luis Obispo, CA  93406-0112
    of their office and phone number onsite.
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
Sacramento, CA  95814
    during the week of July 20, 2009. Please put us in contact with the appropriate
James R. Becker, Site Vice President &  Station Director Diablo Canyon Power Plant
    personnel for planning drills during the onsite information gathering trip.
P. O. Box 56 Avila Beach, CA  93424
34. The team would like to perform a walkthrough of the procedure for control room
Jennifer Tang Field Representative
    evacuation due to fire with qualified operators in the plant during the week of
United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA  94111
    July 6, 2009. Please put us in contact with the appropriate personnel for planning the
Chief, Radiological Emergency Preparedness Section
    walkthrough during the onsite information gathering trip.
FEMA Region 9 1111 Broadway, Suite 1200 Oakland, CA  94607-4052
35. Corrective action documents listing fire protection program deficiencies,
 
    non-compliances and past violations to be resolved during the transition to NFPA 805.
Pacific Gas and Electric
36. A list of compensatory measures in place for the fire protection program identifying those
- 4 -  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Resident Inspector (Tony.Brown@nrc.gov)
    that are in place due to issues to be addressed by the transition to NFPA 805.
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) DC Site Secretary (Agnes.Chan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
37. Drawings showing the installed location details for fire suppression and detection
    systems for the selected fire areas (areas to be selected by the team during the
   
    information-gathering trip).
   
                                          -3-                                  Enclosure
   
File located:  R:REACTORS\DC 2009008 RFI-TFP    ML091050600 SUNSI Rev Compl. X Yes  No ADAMS X Yes  No Reviewer Initials JMM Publicly Avail X Yes  No Sensitive  Yes X No Sens. Type Initials JMM
EB2 C: EB 2    J. Mateychick N.O'Keefe    /RA/ /RA/    04/13 /09 04/15/09    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
 
 
  - 1 - Enclosure ENCLOSURE 
Triennial Fire Protection Inspection Documentation Requested
Please provide the following documentation items 1 - 4 prior to the onsite information-gathering visit, preferably no later than June 1, 2009.  Where practical, please provide copies electronically. 
 
1. The current version of your fire protection program and fire hazards analysis.
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response. 
3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports, pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
4. The Fire Probabilistic Risk Assessment or portions of the plant's Individual Plant Examination for External Events report addressing fire events.
Please provide the following documentation items 5 - 37 during the information-gathering visit or by June 29, 2009, in order to support inspection preparation.  Whenever practical, please provide copies electronically.  However, drawings should be provided as paper copies of sufficient size that all details are legible. 
 
5. Plant layout and equipment drawings for the selected fire areas (these areas will be selected during the information gathering trip) that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as
detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.
6. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.). 
7. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).  8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.
9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip). 
10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the event of a fire (safe shutdown equipment lists). 
  - 2 - Enclosure 11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for RCS
makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.
12. A listing of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed in the last 3 years.
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
14. A listing of open and closed corrective action documents initiated in the last 3 years, which relate to the fire protection program or equipment.  Include corrective action document number, date, and subject.
15. A listing of the applicable codes and standards (with the versions) related to the design of plant fire protection features and evaluations of any code deviations.
16. Drawings of the portions of the emergency lighting system which support fire response and post-fire safe shutdown. 
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations which support the design basis.
18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years' performance history for fire protection program systems or functions monitored within the Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program
completed since January 1, 2006.
24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate the location where the action
must take place. 
  - 3 - Enclosure
25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay  
heat removal, and reactivity control, including the essential support systems).  
26. Two copies of one-line diagrams of the electrical distribution system. These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V). Also, include the vital DC distribution system one-line diagrams.
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.  
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  
29. A list of high to low pressure interface valves.  
30. A copy of procedures governing the training and operation of the fire brigade.  
31. Organization charts of site personnel down to the level of fire protection staff personnel.  
 
32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of July 20, 2009. Please put us in contact with the appropriate personnel for planning drills during the onsite information gathering trip.  
34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of  
July 6, 2009. Please put us in contact with the appropriate personnel for planning the walkthrough during the onsite information gathering trip.  
35. Corrective action documents listing fire protection program deficiencies, non-compliances and past violations to be resolved during the transition to NFPA 805.  
36. A list of compensatory measures in place for the fire protection program identifying those that are in place due to issues to be addressed by the transition to NFPA 805.  
37. Drawings showing the installed location details for fire suppression and detection systems for the selected fire areas (areas to be selected by the team during the information-gathering trip).
}}
}}

Latest revision as of 07:06, 14 November 2019

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000275-09-0008 and 0500323-09-008) Request for Information
ML091050600
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/15/2009
From: O'Keefe N
NRC/RGN-IV/DRS/EB-2
To: Conway J
Pacific Gas & Electric Co
References
IR-09-008
Download: ML091050600 (7)


See also: IR 05000002/1975009

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

April 15, 2009

John T. Conway

Senior Vice President &

Chief Nuclear Officer

Pacific Gas and Electric Company

P. O. Box 3

Mail Code 104/6/601

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000275/2009008 and 05000323/2009008) REQUEST FOR

INFORMATION

Dear Mr. Conway:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Diablo Canyon

facility in July 2009. The inspection team will be comprised of reactor inspectors from the NRC

Region IV office. The team will conduct the inspection in accordance with the baseline

Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."

The schedule for the inspection is as follows:

  • Information gathering visit: June 10 - 11, 2009
  • Onsite inspection: July 06 - 10, 2009

July 20 - 24, 2009

Three individuals will participate in the information gathering visit, to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, meet with the key personnel who will support the inspection, and become familiar with

your fire protection program. The enclosure to this letter provides an initial list of the documents

the team will want to review. We request that your staff transmit copies of the documents listed

in the enclosure to the NRC Region IV office for team use in preparation for the inspection.

Please send this information so that it will arrive in our office in Arlington, Texas, by the dates

listed in the enclosure.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies the NRC regulatory requirements and conforms to applicable NRC

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

Pacific Gas and Electric -2-

fire protection systems, and (4) the fire protection program and its implementation should be

available to support the team at the site during the inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact the lead inspector, John Mateychick, at 817-276-6560.

Sincerely,

/RA/

Neil OKeefe, Chief

Engineering Branch 2

Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

DISTRIBUTION:

Sierra Club San Lucia Chapter

ATTN: Andrew Christie

P. O. Box 15755

San Luis Obispo, CA 93406

Nancy Culver

San Luis Obispo

Mothers for Peace

P. O. Box 164

Pismo Beach, CA 93448

Chairman

San Luis Obispo County

Board of Supervisors

1055 Monterey Street, Suite D430

San Luis Obispo, CA 93408

Truman Burns\Robert Kinosian

California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102

Pacific Gas and Electric -3-

Diablo Canyon Independent Safety Committee

Attn: Robert R. Wellington, Esq.

Legal Counsel

857 Cass Street, Suite D

Monterey, CA 93940

Director, Radiological Health Branch

State Department of Health Services

P. O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

City Editor

The Tribune

3825 South Higuera Street

P. O. Box 112

San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, CA 95814

James R. Becker, Site Vice President &

Station Director

Diablo Canyon Power Plant

P. O. Box 56

Avila Beach, CA 93424

Jennifer Tang

Field Representative

United States Senator Barbara Boxer

1700 Montgomery Street, Suite 240

San Francisco, CA 94111

Chief, Radiological Emergency Preparedness Section

FEMA Region 9

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Pacific Gas and Electric -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

DC Site Secretary (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

File located: R:REACTORS\DC 2009008 RFI-TFP ML091050600

SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials JMM

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials JMM

EB2 C: EB 2

J. Mateychick N.OKeefe

/RA/ /RA/

04/13 /09 04/15/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation items 1 - 4 prior to the onsite information-gathering

visit, preferably no later than June 1, 2009. Where practical, please provide copies

electronically.

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant

Examination for External Events report addressing fire events.

Please provide the following documentation items 5 - 37 during the information-gathering visit or

by June 29, 2009, in order to support inspection preparation. Whenever practical, please

provide copies electronically. However, drawings should be provided as paper copies of

sufficient size that all details are legible.

5. Plant layout and equipment drawings for the selected fire areas (these areas will be

selected during the information gathering trip) that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and (c) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units; and (d) fire area

boundaries.

6. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

7. Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

-1- Enclosure

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for normal and alternate shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of

a size sufficient to read all details. These should include the systems used for RCS

makeup, RCS pressure control, decay heat removal, and reactivity control, including the

essential support systems.

12. A listing of design change packages which were determined to impact fire protection and

post-fire safe shutdowns, performed in the last 3 years.

13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14. A listing of open and closed corrective action documents initiated in the last 3 years,

which relate to the fire protection program or equipment. Include corrective action

document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations.

16. Drawings of the portions of the emergency lighting system which support fire response

and post-fire safe shutdown.

17. Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21. Maintenance Rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

Maintenance Rule program.

22. A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, Updated Final Safety Analysis Report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since January 1, 2006.

24. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate the location where the action

must take place.

-2- Enclosure

25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay

heat removal, and reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to the engineered safety feature loads (480V

and 4160V). Also, include the vital DC distribution system one-line diagrams.

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of July 20, 2009. Please put us in contact with the appropriate

personnel for planning drills during the onsite information gathering trip.

34. The team would like to perform a walkthrough of the procedure for control room

evacuation due to fire with qualified operators in the plant during the week of

July 6, 2009. Please put us in contact with the appropriate personnel for planning the

walkthrough during the onsite information gathering trip.

35. Corrective action documents listing fire protection program deficiencies,

non-compliances and past violations to be resolved during the transition to NFPA 805.

36. A list of compensatory measures in place for the fire protection program identifying those

that are in place due to issues to be addressed by the transition to NFPA 805.

37. Drawings showing the installed location details for fire suppression and detection

systems for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

-3- Enclosure