{{#Wiki_filter:From: Pickett, Douglas Sent: Tuesday, June 16, 2009 9:37 AM To: 'Harding Jr, Thomas' Cc: Sullivan, Ted; Mitchell, Matthew; David, Marshall; Feintuch, Karl; Lingam, Siva  
{{#Wiki_filter:From:                     Pickett, Douglas Sent:                     Tuesday, June 16, 2009 9:37 AM To:                       'Harding Jr, Thomas' Cc:                       Sullivan, Ted; Mitchell, Matthew; David, Marshall; Feintuch, Karl; Lingam, Siva


==Subject:==
==Subject:==
Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)  
Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)


==Dear Mr. Harding:==
==Dear Mr. Harding:==


By letter dated May 22, 2009, R.E. Ginna Nuclear Power Plant, LLC (the licensee) submitted a proposed relief request for the inservice inspection program for the R.E. Ginna Nuclear Power Plant (TAC No. ME1364). In lieu of performing a bare metal visual examination of the reactor vessel bottom mounted instrumentation nozzles as required by ASME Code Case N-722 during the 2009 refueling outage, the licensee has proposed performing visual examinations during both the 2009 and 2011 refueling outages combined with a volumetric examination during the 2011 refueling outage. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff
By letter dated May 22, 2009, R.E. Ginna Nuclear Power Plant, LLC (the licensee) submitted a proposed relief request for the inservice inspection program for the R.E. Ginna Nuclear Power Plant (TAC No. ME1364). In lieu of performing a bare metal visual examination of the reactor vessel bottom mounted instrumentation nozzles as required by ASME Code Case N-722 during the 2009 refueling outage, the licensee has proposed performing visual examinations during both the 2009 and 2011 refueling outages combined with a volumetric examination during the 2011 refueling outage. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.  
 
The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
A copy of this email will be made publicly available in ADAMS. Please contact me if you have any questions.  
A copy of this email will be made publicly available in ADAMS. Please contact me if you have any questions.
 
Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()
Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()  


==Subject:==
==Subject:==
Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)
Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)
Sent Date:       06/16/2009 9:25:12 AM Received Date:        06/16/2009 9:37:00 AM From:                Pickett, Douglas
Sent Date:       06/16/2009 9:25:12 AM
 
Created By:        Douglas.Pickett@nrc.gov


Recipients:
Received Date:      06/16/2009 9:37:00 AM From:            Pickett, Douglas Created By:        Douglas.Pickett@nrc.gov Recipients:
Thomas.HardingJr@constellation.com ('Harding Jr, Thomas')
Thomas.HardingJr@constellation.com ('Harding Jr, Thomas')
Tracking Status: None Ted.Sullivan@nrc.gov (Sullivan, Ted)
Tracking Status: None Ted.Sullivan@nrc.gov (Sullivan, Ted)
Tracking Status: None  
Tracking Status: None Matthew.Mitchell@nrc.gov (Mitchell, Matthew)
 
Tracking Status: None Marshall.David@nrc.gov (David, Marshall)
Matthew.Mitchell@nrc.gov (Mitchell, Matthew)                 Tracking Status: None Marshall.David@nrc.gov (David, Marshall)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None  
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
 
Tracking Status: None Post Office:
Karl.Feintuch@nrc.gov (Feintuch, Karl)                 Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Files         Size       Date & Time MESSAGE         14505       06/16/2009 Options Expiration Date:
Tracking Status: None  
Priority:               olImportanceNormal ReplyRequested:        False Return Notification:       False Sensitivity:     olNormal Recipients received:}}
 
Post Office:  
 
Files               Size       Date & Time  
 
MESSAGE       14505       06/16/2009  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:        False Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 04:53, 14 November 2019

Acceptance Review for Ginna Relief Request No. 24
ML091670167
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/16/2009
From: Pickett D
Plant Licensing Branch 1
To: Harding T
Constellation Energy Group
Pickett , NRR/DLPM, 415-1364
References
TAC ME1364
Download: ML091670167 (2)


Text

From: Pickett, Douglas Sent: Tuesday, June 16, 2009 9:37 AM To: 'Harding Jr, Thomas' Cc: Sullivan, Ted; Mitchell, Matthew; David, Marshall; Feintuch, Karl; Lingam, Siva

Subject:

Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)

Dear Mr. Harding:

By letter dated May 22, 2009, R.E. Ginna Nuclear Power Plant, LLC (the licensee) submitted a proposed relief request for the inservice inspection program for the R.E. Ginna Nuclear Power Plant (TAC No. ME1364). In lieu of performing a bare metal visual examination of the reactor vessel bottom mounted instrumentation nozzles as required by ASME Code Case N-722 during the 2009 refueling outage, the licensee has proposed performing visual examinations during both the 2009 and 2011 refueling outages combined with a volumetric examination during the 2011 refueling outage. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

A copy of this email will be made publicly available in ADAMS. Please contact me if you have any questions.

Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review for Ginna Relief Request No. 24 (TAC No. ME1364)

Sent Date: 06/16/2009 9:25:12 AM

Received Date: 06/16/2009 9:37:00 AM From: Pickett, Douglas Created By: Douglas.Pickett@nrc.gov Recipients:

Thomas.HardingJr@constellation.com ('Harding Jr, Thomas')

Tracking Status: None Ted.Sullivan@nrc.gov (Sullivan, Ted)

Tracking Status: None Matthew.Mitchell@nrc.gov (Mitchell, Matthew)

Tracking Status: None Marshall.David@nrc.gov (David, Marshall)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 14505 06/16/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: