ML16053A127

From kanterella
Jump to navigation Jump to search

Acceptance of Requested Licensing Action Application to Review Technical Specifications to Adopt TSTF-490
ML16053A127
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/03/2016
From: Render D
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Nuclear
Render D, NRR-DORL 415-3629
References
CAC MF7339
Download: ML16053A127 (3)


Text

UNITED STATES

~

< NUCLEAR REGULATORY COMMISSION

< ~

WASHINGTON, D.C. 20555-0001 J ,, 111111 /. ,:

... M:rrd1 3 I 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear R. E. Ginna Nuclear Power Plant 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: APPLICATION TO REVIEW TECHNICAL SPECIFICATIONS TO ADOPT TSTF-490 (CAC NO. MF7339)

Dear Mr. Hanson:

By application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A015), Exelon Generation Company, LLC (the licensee) submitted a license amendment for R.E. Ginna Nuclear Power Plant (Ginna). The proposed amendment would revise Ginna's Technical Specifications limit for Reactor Coolant System (RCS) gross specific activity with a new limit based upon RCS noble gas specific activity. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plar:it.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

B. Hanson If you have any questions, please contact me at (301) 415-3629.

Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 cc: Distribution via Listserv

ML16053A127 *via email OFFICE LPL 1-1/PM LPL 1-1/LA* LPL1-1/BC LPL 1-1/PM NAME DRender KGoldstein (JBurkhardt for) TT ate DRender DATE 2/26/16 2/25/16 3/1/16 3/3/16