MONTHYEARML16035A0152016-02-0404 February 2016 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML16053A1272016-03-0303 March 2016 Acceptance of Requested Licensing Action Application to Review Technical Specifications to Adopt TSTF-490 Project stage: Acceptance Review ML16075A1192016-03-17017 March 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications Project stage: RAI ML16180A4482016-06-28028 June 2016 Supplement to Response to Request for Additional Information for the Review of TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec Project stage: Supplement ML16279A3812016-10-0505 October 2016 NRR E-mail Capture - Ginna Nuclear Power Plant - Request for Additional Information Regarding: Deletion of E BAR Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications Project stage: RAI ML16278A0772016-11-0707 November 2016 Request for Additional Information Regarding: Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications Project stage: RAI ML16336A0482016-11-30030 November 2016 Response to Request for Additional Information for the Review of TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Response to RAI ML16358A4242017-02-0909 February 2017 R. E. Ginna Nuclear Power Plant - Issuance of Amendment to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec Project stage: Approval 2016-02-04
[Table View] |
Similar Documents at Ginna |
---|
Category:Acceptance Review Letter
MONTHYEARML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML22269A4522022-09-22022 September 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report (COLR) ML21293A1332021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML20335A5692020-11-30030 November 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: Alternative to ASME Code, Section XI ML20325A1002020-11-20020 November 2020 Acceptance Review: Force-on-Force Temporary Exemption Request ML20294A4942020-10-20020 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications for Steam Generator Tube Inspection Frequency ML20276A1032020-10-0202 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review - Exemptions from 10 CFR 2.109(b), Effect of Timely Renewal Application ML20106F2482020-04-15015 April 2020 Acceptance Review: R. E. Ginna Nuclear Power Plant to Implement WCAP, TSTF-411, and TSTF-418 ML19084A2872019-03-25025 March 2019 R. E. Ginna Nuclear Power Plant - Acceptance Review: Changes to Emergency Plan Staffing (EPID-L-2019-LLA-0053) ML19078A1262019-03-19019 March 2019 R. E. Ginna Nuclear Power Station - Acceptance Review: TS 5.5.15, Containment Leakage Testing Program, to Extend the Integrated Leakage Rate Testing Program Test Interval from 10 Years to 15 Years ML18249A0312018-09-0404 September 2018 R. E. Ginna Nuclear Power Plant - Acceptance Review: Relief Request ISI-18 to Extend the Reactor Pressure Vessel Inservice Inspection ML18197A2262018-06-25025 June 2018 R. E. Ginna Nuclear Power Plant - Acceptance Review: License Amendment Request to Adopt - TSTF-547, Rev 1 Clarification of Rod Position Requirements ML17340A9762017-12-0606 December 2017 R. E. Ginna Nuclear Power Plant - Acceptance Review to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability ML17331A0082017-11-22022 November 2017 R. E. Ginna Nuclear Power Plant - E-mail Regarding Acceptance Review for Revise TSs Surveillance Requirement SR 3.8.4.3, DC Sources to Allow for a Modified Performance Discharge Test ML17192A1752017-07-11011 July 2017 Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes ML16053A1272016-03-0303 March 2016 Acceptance of Requested Licensing Action Application to Review Technical Specifications to Adopt TSTF-490 ML12261A2992012-09-17017 September 2012 R. E. Gina Nuclear Power Plant - Acceptance Review for Relief Request RR-09 ML12156A1352012-06-0404 June 2012 Acceptance Review for Relief Request Number ISI-06 for Fifth Inservice Inspection Program, Regarding the Examination of Bottom Mounted Instrumentation Penetrations ML1035003842010-12-16016 December 2010 Acceptance Review for Ginna TAC ME5120: ISI-04 ML0916701672009-06-16016 June 2009 Acceptance Review for Ginna Relief Request No. 24 ML0909101862009-04-0101 April 2009 Acceptance Review for Ginna Request to Extend Appendix H Reporting Requirements ML0905703152009-02-26026 February 2009 Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna ML0905000312009-02-19019 February 2009 Acceptance Review for Ginna Diesel Generator Amendment ML0904902592009-02-18018 February 2009 Acceptance Review of Ginna Relief Request VR-14 ML0834600332008-12-11011 December 2008 Acceptance Review for Relief Request No. 22 ML0816505892008-06-18018 June 2008 Acceptance Review Regarding Fourth Ten-Year Interval Inservice Inspection Program Submittal of Relief Request Numbers 18, 19, 20 and 21 2024-02-14
[Table view] |
Text
UNITED STATES
~
< NUCLEAR REGULATORY COMMISSION
< ~
WASHINGTON, D.C. 20555-0001 J ,, 111111 /. ,:
... M:rrd1 3 I 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear R. E. Ginna Nuclear Power Plant 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: APPLICATION TO REVIEW TECHNICAL SPECIFICATIONS TO ADOPT TSTF-490 (CAC NO. MF7339)
Dear Mr. Hanson:
By application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A015), Exelon Generation Company, LLC (the licensee) submitted a license amendment for R.E. Ginna Nuclear Power Plant (Ginna). The proposed amendment would revise Ginna's Technical Specifications limit for Reactor Coolant System (RCS) gross specific activity with a new limit based upon RCS noble gas specific activity. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plar:it.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
B. Hanson If you have any questions, please contact me at (301) 415-3629.
Diane Render, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244 cc: Distribution via Listserv
ML16053A127 *via email OFFICE LPL 1-1/PM LPL 1-1/LA* LPL1-1/BC LPL 1-1/PM NAME DRender KGoldstein (JBurkhardt for) TT ate DRender DATE 2/26/16 2/25/16 3/1/16 3/3/16