| number = ML092010126
| number = ML092010126
| issue date = 07/14/2009
| issue date = 07/14/2009
| title = Beaver Valley, Units 1 & 2, Renewal of Quality Assurance Program Approval 0275 Request
| title = Renewal of Quality Assurance Program Approval 0275 Request
| author name = Sena P P
| author name = Sena P
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:FENOC FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Peter P. Sena III Site Vice President 724-682-5234 Fax: 724-643-8069 July 14, 2009 L-09-169 10 CFR 71.101 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:FENOC                                                                               Beaver Valley Power Station P.O. Box 4 FirstEnergyNuclear OperatingCompany Shippingport,PA 15077 PeterP. Sena III                                                                               724-682-5234 Site Vice President                                                                      Fax: 724-643-8069 July 14,       2009 L-09-169                                                     10 CFR 71.101 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 71-0275 Renewal of Quality Assurance Program Approval 0275 FirstEnergy Nuclear Operating Company's (FENOC's)
 
Quality Assurance Program Approval for radioactive material packages (Approval Number 0275, Revision Number 9) dated September 15, 2004, will expire on August 31, 2009. FENOC hereby requests renewal of the Quality Assurance Program Approval 0275 for radioactive material packages prior to August 31, 2009. In accordance with 10 CFR 71.101(f), FENOC will continue to apply the FENOC Quality Assurance Program Manual with regard to transportation packages.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-761-6071.
Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 71-0275 Renewal of Quality Assurance Program Approval 0275 FirstEnergy Nuclear Operating Company's (FENOC's) Quality Assurance Program Approval for radioactive material packages (Approval Number 0275, Revision Number 9) dated September 15, 2004, will expire on August 31, 2009. FENOC hereby requests renewal of the Quality Assurance Program Approval 0275 for radioactive material packages prior to August 31, 2009. In accordance with 10 CFR 71.101(f),
Sincerely, Peter P. Sena I11.cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative 6Q 00C/}}
FENOC will continue to apply the FENOC Quality Assurance Program Manual with regard to transportation packages.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -
Fleet Licensing, at 330-761-6071.
Sincerely, Peter P. Sena I11.
cc:   NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative 6Q 00C/}}

Latest revision as of 04:05, 14 November 2019

Renewal of Quality Assurance Program Approval 0275 Request
ML092010126
Person / Time
Site: Beaver Valley, 07100275
Issue date: 07/14/2009
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
Download: ML092010126 (1)


Text

FENOC Beaver Valley Power Station P.O. Box 4 FirstEnergyNuclear OperatingCompany Shippingport,PA 15077 PeterP. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 July 14, 2009 L-09-169 10 CFR 71.101 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 71-0275 Renewal of Quality Assurance Program Approval 0275 FirstEnergy Nuclear Operating Company's (FENOC's) Quality Assurance Program Approval for radioactive material packages (Approval Number 0275, Revision Number 9) dated September 15, 2004, will expire on August 31, 2009. FENOC hereby requests renewal of the Quality Assurance Program Approval 0275 for radioactive material packages prior to August 31, 2009. In accordance with 10 CFR 71.101(f),

FENOC will continue to apply the FENOC Quality Assurance Program Manual with regard to transportation packages.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at 330-761-6071.

Sincerely, Peter P. Sena I11.

cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative 6Q 00C/