ML092920163: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:004A2.11 SR09301  1 of 9  U.S. Nuclear Regulatory Commission Surry Power Station  
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Job Performance Measure 004A2.11 Applicant________________________________                                 Start Time___________________
 
Examiner_______________________________
SR09301 Job Performance Measure 004A2.11  
Date ___________________________________                                   Stop Time___________________
 
Applicant________________________________     Start Time___________________  
 
Examiner_______________________________  
 
Date ___________________________________   Stop Time___________________  
 
Title INCREASE RCS BORON CONCENTRATION 500 PPM IN ACCORDANCE WITH AP-40.00.
Title INCREASE RCS BORON CONCENTRATION 500 PPM IN ACCORDANCE WITH AP-40.00.
K/A: 004A2.11 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of  
K/A: 004A2.11 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of IAS.
Applicability                                            Estimated Time                    Actual Time RO/SRO(I)/SRO(U)                                          15 Minutes Conditions Task is to be SIMULATED in the plant.
A sustained loss of station instrument air is in progress and the team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
It is desired to increase RCS boron concentration 500 ppm in accordance with step 17.
Standards Candidate correctly manipulates valves as required by 0-AP-40.00, step 17, to allow for boration of the RCS.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.
The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
You are to perform steps 17a sub steps 1 and 2.
It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)
When you complete these actions, inform the 3rd license operator to perform subsequent actions.
When you finish the actions necessary to accomplish this, please inform me.
004A2.11                                        SR09301                                                      1 of 9


those malfunctions or operations; Loss of IAS.
Terminating Cues Completion of 0-AP-40.00, Non-Recoverable Loss of Instrument Air, step 17.
Applicability      Estimated Time Actual Time RO/SRO(I)/SRO(U)    15 Minutes                       
Procedures 0-AP-40.00, Non-Recoverable Loss of Instrument Air (Revision 26).
Tools and Equipment                              Safety Considerations None                                                  Standard Personal Safety Equipment 004A2.11                                SR09301                                            2 of 9


Conditions Task is to be SIMULATED in the plant. A sustained loss of station instru ment air is in progress and the team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air. It is desired to increase RCS boron concent ration 500 ppm in accordance with step 17.  
Initiating Cues A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.
Notes to the Evaluator.
Task briefing should occur in the pre-determined location.
This task is to be SIMULATED.        Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
Task critical elements are bolded and noted by the words Critical Step at the end of the step.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.
The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
You are to perform steps 17a sub steps 1 and 2.
It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)
When you complete these actions, inform the 3rd license operator to perform subsequent actions.
When you finish the actions necessary to accomplish this, please inform me.
Notes Expected RWP to be used for 08.1 SROU Class is -
RWP 0-0001 Dose ALARM - 5 mr Dose RATE ALARM- 20 mr/hr 004A2.11                                        SR09301                                                      3 of 9


Standards  Candidate correctly manipulates valves as required by 0-AP-40.00, step 17, to allow for boration of the RCS.  
PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted by the words Critical Step at the end of the step.
 
START TIME:
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves. I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air. The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air. You are to perform steps 17a sub steps 1 and 2. It is desired to throttle 1-CH-305 a half turn open.  (1/2 turn open from full closed)  When you complete these actions, inform the 3 rd license operator to per form subsequent actions. When you finish the actions necessary to accomplish this, please inform me.  
STEP 1:
 
_______ SAT CAUTIONS AND NOTE PRIOR TO STEP 17.
004A2.11 SR09301 2 of 9 Terminating Cues Completion of 0-AP-40.00, Non-Recover able Loss of Instrument Air, step 17.
_______ UNSAT STANDARD:
Procedures
Reads caution regarding RWST overflow.
Reads caution regarding minimum charging flow.
Reads note regarding pressurizer level control EVALUATORS NOTE:
If asked: No personnel are working in the safeguards valve pit area.
COMMENTS:
004A2.11                                   SR09301                                                       4 of 9


0-AP-40.00, Non-Recoverable Loss of Instrument Air (Revision 26).
STEP 2:
Tools and Equipment    Safety Considerations
_______ SAT STEP 17a- INCREASE INITIAL RCS BORON 500 PPM:
 
_______ UNSAT a) Align Charging Line Isolation valves:
None      Standard Personal Safety Equipment 004A2.11 SR09301  3 of 9  Initiating Cues
 
A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.
Notes to the Evaluator
. Task briefing should occur in the pre-determined location.
This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
 
Task critical elements are bolded and noted by the words "Critical Step' at the end of the step.
 
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves. I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air. The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air. You are to perform steps 17a sub steps 1 and 2. It is desired to throttle 1-CH-305 a half turn open.  (1/2 turn open from full closed)  When you complete these actions, inform the 3 rd license operator to per form subsequent actions. When you finish the actions necessary to accomplish this, please inform me.
 
Notes Expected RWP to be used for 08.1 SROU Class is - 
 
RWP 0-0001  Dose ALARM - 5 mr  Dose RATE ALARM- 20 mr/hr
 
004A2.11 SR09301  4 of 9 PERFORMANCE CHECKLIST Notes to the Evaluator
 
Task critical elements are bolded and noted by the words "Critical Step' at the end of the step.
START TIME:         
 
STEP 1:  CAUTIONS AND NOTE PRIOR TO STEP 17.
STANDARD:
Reads caution regarding RWST overflow. Reads caution regarding minimum charging flow. Reads note regarding pressurizer level control EVALUATOR'S NOTE:
If asked:  No personnel are worki ng in the safeguards valve pit area.
COMMENTS:  
 
_______ SAT  
 
_______ UNSAT
 
004A2.11 SR09301  5 of 9  STEP 2:  STEP 17a- INCREASE INITIAL RCS BORON 500 PPM:
a) Align Charging Line Isolation valves:
: 1) Verify closed or close ( )-CH-304, Chg Hdr FCV-1122 Outlet Isol
: 1) Verify closed or close ( )-CH-304, Chg Hdr FCV-1122 Outlet Isol
: 2) Throttle ( )-CH-305, Chg Hdr FCV-1122 Byp, to limit charging flow STANDARD:
: 2) Throttle ( )-CH-305, Chg Hdr FCV-1122 Byp, to limit charging flow STANDARD:
Proceeds to aux building basement, unit one side, locates and CLOSES 1-CH-304. This is a critical step. Locates 1-CH-305 and throttles valve 1/2 turn open. Directs the 3 rd RO to perform substep 3.
Proceeds to aux building basement, unit one side, locates and CLOSES 1-CH-304. This is a critical step.
EVALUATOR'S NOTE:
Locates 1-CH-305 and throttles valve 1/2 turn open.
1-CH-304 will be found open- report initial valve position 'as it appears' Candidate will open 1-CH-305 only 1/2 turn. When valve is being opened, cue operator that flow noise can be heard.  
Directs the 3rd RO to perform substep 3.
 
EVALUATORS NOTE:
EVALUATOR'S CUES:
1-CH-304 will be found open- report initial valve position as it appears Candidate will open 1-CH-305 only 1/2 turn. When valve is being opened, cue operator that flow noise can be heard.
When candidate reports to 3 rd license of step completion, report that while attempting to open 1-CH-MOV-1350 in accordance with step 17b, the valve failed to respond and you are to locally open 1-CH-228.
EVALUATORS CUES:
COMMENTS:  
When candidate reports to 3rd license of step completion, report that while attempting to open 1-CH-MOV-1350 in accordance with step 17b, the valve failed to respond and you are to locally open 1-CH-228.
 
COMMENTS:
_______ SAT  
STEP 3:
 
_______ SAT Step 17b RNO- Locally open: 1-CH-228
_______ UNSAT
_______ UNSAT STANDARD:
 
Candidate proceeds to unit one side of the boric acid flats (13 elevation of Aux Building) and locates 1-CH-228.
STEP 3:  Step 17b RNO- Locally open: 1-CH-228 STANDARD:
Locally opens 1-CH-228. This is a critical step.
Candidate proceeds to unit one side of the bor ic acid flats (13' elevation of Aux Building) and locates 1-CH-228. Locally opens 1-CH-228. This is a critical step.
EVALUATORS NOTE: N/A EVALUATORS CUES:
EVALUATOR'S NOTE: N/A EVALUATOR'S CUES:
When 1-CH-228 is simulated open, report that task is complete and leave the boric acid flats (ALARA).
When 1-CH-228 is simulated open, report that task is complete and leave the boric acid flats (ALARA).
COMMENTS:  
COMMENTS:
004A2.11                                      SR09301                                              5 of 9


_______ SAT
STOP TIME:
 
____________________________________________________________________________________
_______ UNSAT
____________________________________________________________________________________
 
____________________________________________________________________________________
004A2.11 SR09301 6 of 9   STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
004A2.11                           SR09301                                         6 of 9


____________________________________________________________________________________
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
004A2.11 SR09301  7 of 9  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task Task is to be SIMULATED in the plant.
Task Task is to be SIMULATED in the plant.
Increase RCS boron concentration 500 ppm in accordance with 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
Increase RCS boron concentration 500 ppm in accordance with 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
Directions The evaluator will explain the initial c onditions of the task to be performed and w ill provide the initiating cue. Ensure you indicate to the evaluator w hen you understand your assigned task.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.  
Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.
The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
You are to perform steps 17a sub steps 1 and 2.
It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)
When you complete these actions, inform the 3rd license operator to perform subsequent actions.
When you finish the actions necessary to accomplish this, please inform me.
004A2.11                                        SR09301                                                        7 of 9


Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves. I am the Nuclear Shift Manager. Both units are current ly experiencing a complete loss of instrument air. The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air. You are to perform steps 17a sub steps 1 and 2. It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed) When you complete these actions, inform the 3 rd license operator to per form subsequent actions. When you finish the actions necessary to accomplish this, please inform me.  
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.
The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.
You are to perform steps 17a sub steps 1 and 2.
It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)
When you complete these actions, inform the 3rd license operator to perform subsequent actions.
When you finish the actions necessary to accomplish this, please inform me.


Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
NUMBER                                          PROCEDURE TI TLE                                       REVIS REV ISION ION 26 O-AP-40.00                       NON-RECOVERABLE NON  -RECOVERABLE LOSS OF INSTRUMENT AIR PAGE 11 of 25 ACTION !/ EXPECTED RESPONSE                                 RESPONS E NOT OBTAINED
Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.
* * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
 
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves. I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air. The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air. You are to perform steps 17a sub steps 1 and 2. It is desired to throttle 1-CH-305 a half turn open.  (1/2 turn open from full closed)  When you complete these actions, inform the 3 rd license operator to per form subsequent actions. When you finish the actions necessary to accomplish this, please inform me.
 
NUMB E R PROCED UR E TI TLE RE V ISION 26 O-AP-40.00 NON-RECO V ERABLE L OSS OF I NS TRUMENT AIR PAGE 11 of 25 ACTION! E XP E CT E D RESPONSE RESP ONS E NOT OBTA I NED * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
* CAUTION:
* CAUTION:
* Keep personne l clear of safeguards va l v e pit. T he R W ST may overflow during inc rease o f boron flo w , if let d ow n is aligned to R W ST. To obtain proper CSD Boron concentrat i on i n two hours , a min i m u m flo w of 22 GPM is required.  
* Keep personnel personnel clear of safeguards va lve pit. The RWST may overflow during increase of boron flow, if letdown letdown is aligned to RWST.
* * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
To obtain proper CSD Boron concentration in      in two hours , a minimum flow of 22 GPM is required.
* NOTE: Coo l down o f ReS may be necessary to control pressurizer l e v el in crease unti l a le tdo w n flo w pat h is es ta b li shed. 17. IN C REASE INITIAL RCS BORON 500 PPM: a) Align Charging Line I solat i on va l ves: o 1) V er i f y closed o r close ( )-CH-304 , Chg Hdr F CV-1122 Outlet 1501 o 2) Thrott le ( )-C H-305 , Chg Hdr FC V-1 122 B yp, to li mit charging fto w o 3) V er i f y open or op en ( )-CH-MOV-( )289 A and B b) Open EMERGENCY BORA TE valve o . ()-C H-MO V-( )350 o c) V er i f y bo r ic acid trans f er pump running i n s l o w speed o d) Ad ju st cha r ging flo w to match bo r ic ac id fto w o e) Continue borat i on for mi ni m um of two hours a) Locally open: 0 ( )-CH-MOV-( )3 50 OR 0 * ()-CH-228 0 b) Ma n u ally start bor i c acid transfer pump i n slo w speed. NUMB E R PROC E DUR E TI T L E REVIS I ON 26 O-AP-40.00 NON-R E COVERABLE L OSS OF I NSTRUMENT AIR PAG E 11 of 25 ACTION/EXP E CTED RESPONSE R E SPONS E NOT OBTA I NED * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
requ ired .
* CAUT I ON:
      * * * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * **
* Keep personnel clear of safeguards va l ve pit. T he R WS T may overflow during increase o f boron flow , if letdown is aligned to R WS T. To obtain proper CSD Boron concent r at i on in two hours , a min i mum flow of 22 GPM i s requ i red. * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * ** *. N O TE: Cooldown of ReS may be necessary to control pressurizer level i ncrease until a l etdo w n flo w path is es t ab li shed. 17. INCR E AS E IN IT IAL RCS BORON 500 PPM: a) Align Charging Line I solat i on va l ves: o 1) Verify closed or close ( )-CH-304 , Chg Hdr F CV-1122 Outlet 150 1 o 2) Thrott l e ( )-CH-305, Chg Hdr FCV-1122 Byp , to l imit charging flow o 3) Veri f y open or open ( )-CH-MOV-( )289A and B b) Open EM E RGENCY BORA TE valve o . ()-CH-MOV-( )350 o c) Verify boric acid transfer pump running in slow speed o d) Ad j ust charging flo w to match boric acid fto w o e) Continue borat i on for min i mum of two hours a) L ocally open: 0 ( )-CH-MOV-( )350 OR 0 * ()-CH-228 0 b) Manua ll y start bor i c acid transfer pump in s l ow speed.
* * * **                                                                                               * * * * * **
076A2.01 SR09301  1 of 10  U.S. Nuclear Regulatory Commission  Surry Power Station
                                                                                                                  * * *.
 
NOTE: Cooldown of ReS may be necessary to control pressurizer level       level increase until until a letdown flow path path is establi esta bli shed.
SR09301 Job Performance Measure 076A2.01 (3.5/3.7)  
: 17. INCREAS INCREASE    E INITIAL IN ITIAL RCS BORON 500 PPM:
 
a) Align Charging Line Isolation va lves:
Applicant________________________________    Start Time___________________
o       1) Verify closed or close ( )-CH -304 ,
 
Chg Hdr FCV-1122 Outlet 1501    1501 o       2) Throttle ( )-CH-305,
Examiner_______________________________
                                )-CH -305, Chg Hdr FCV-1 FCV-1122       Byp, to limit charging 122 Byp, flow ftow o       3) Verify open or open ( )-CH-MOV-(
 
                            )-CH-MOV- ( )289A and B b) Open EMERGENCY BORATE valve                               a) Locally open:
Date ___________________________________   Stop Time___________________
o       . ()-CH-MOV-( )350                                   0         ( )-CH -MOV-( )350 OR 0     * ()-CH-228 oo  c) Verify Verify boric acid transfer pump running in    in    0   b) Manually Manually start boric acid transfer pump in in slow speed                                                  slow speed.
 
o  d) Adjust Adju st charging cha rging flow to match boric acid ac id ftow o   e) Continue boration for minimum of two hours
Title ISOLATE SERVICE WATER TO #3 MER DURING FLOODING
 
K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those
 
malfunctions or operations; Loss of SWS. (3.5/3.7)
Applicability      Estimated Time Actual Time RO/SRO(I)/SRO(U)    15 Minutes                       
 
Conditions Task is to be SIMULATED in the plant. Any plant mode/condition where a lar ge SW leak in #3 MER has occurred.
 
Standards  Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0-AP-13.00 steps  36 and 37.
Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 36. Shift Manager direction.


U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Job Performance Measure 076A2.01 (3.5/3.7)
Applicant________________________________                            Start Time___________________
Examiner_______________________________
Date ___________________________________                            Stop Time___________________
Title ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)
Applicability                                        Estimated Time                Actual Time RO/SRO(I)/SRO(U)                                    15 Minutes Conditions Task is to be SIMULATED in the plant.
Any plant mode/condition where a large SW leak in #3 MER has occurred.
Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0-AP-13.00 steps        36 and 37.
Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 36.
Shift Manager direction.
Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 37 completed.
Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 37 completed.
Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding.  
Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding.
076A2.01                                    SR09301                                                  1 of 10


076A2.01 SR09301  2 of 10 Tools and Equipment   Safety Considerations None       Standard Personal Safety Equipment Confined Space Entry Requirements Notes to the Evaluator
Tools and Equipment                                   Safety Considerations None                                                     Standard Personal Safety Equipment Confined Space Entry Requirements Notes to the Evaluator.
. Task briefing should occur in the pre-determined location.
Task briefing should occur in the pre-determined location.
This task is to be SIMULATED. Do NOT allow the operator to manipulate cont rols, operate switches or reposition valves.  
This task is to be SIMULATED.       Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
 
Task critical elements are bolded and noted by the words Critical Step at the end of the step.
Task critical elements are bolded and noted by the words "Critical Step' at the end of the step.  
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
 
I am the Shift Manager. There is a major Service Water leak in #3 MER.
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves.  
Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, Steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
 
1-SW-P-10B and 2-SW-P-10B have been secured.
I am the Shift Manager. There is a major Service Water leak in #3 MER.  
1-VS-E-4A, 4B, and 4C have been secured.
 
When you finish the actions necessary to accomplish this, please inform me.
Here is a copy of 0-AP-13.00, Turbine Building or
Notes 076A2.01                                     SR09301                                                     2 of 10
#3 MER Flooding, Steps 36 and
: 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
1-SW-P-10B and 2-SW-P
-10B have been secured.  
 
1-VS-E-4A, 4B, and 4C have been secured.  
 
When you finish the actions necessary to accomplish this, please inform me.  
 
Notes  
 
076A2.01 SR09301 3 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator
 
Task critical elements are bolded and noted by the words "Critical Step' at the end of the step.
START TIME:         
 
STEP 1:      Step 36a-  ISOLATE SW TO MER 3:
a)  Fail 1-SW-263 closed by opening Ci rcuit 8 on Lighting Panel 2T3 (located north of 2-FW-E-2A)


PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted by the words Critical Step at the end of the step.
START TIME:
STEP 1:
_______ SAT Step 36a-      ISOLATE SW TO MER 3:
_______ UNSAT a)    Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2-FW-E-2A)
STANDARD:
STANDARD:
(a) Locates lighting panel 2T3 (located north of 2-FW-E-2A). (b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.  
(a) Locates lighting panel 2T3 (located north of 2-FW-E-2A).
(b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.
EVALUATORS NOTE:
If asked: No personnel are working in the safeguards valve pit area.
COMMENTS:
STEP 2:
_______ SAT STEP 36b- Verify open or open 1-SW-500, SW Header Crosstie (MER 4)
_______ UNSAT STANDARD:
(a)  Proceeds to #4 MER.
(b)  Locates manual valve 1-SW-500 (halfway across room under smoke detector).
(c)  Pulls pin from handwheel actuator.
(d)  Opens or verifies open 1-SW-500 by rotating valve handwheel in the counter clockwise direction- This is a critical step.
Evaluators Cues Tell operator: Actual valve position in plant may be open or closed.            Provide appropriate cue based on initial valve position.
COMMENTS:
076A2.01                                      SR09301                                                      3 of 10


EVALUATOR'S NOTE:
STEP 3:
If asked:  No personnel are worki ng in the safeguards valve pit area.
_______ SAT Step 36c- Close 2-SW-476, Water Box 2C Isol (MER 4)
COMMENTS:
_______ UNSAT STANDARD:
 
(a) Locates 2-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side.
_______ SAT  
(b) Attempts to close 2-SW-476 by removing the locking pin and rotating the handwheel clockwise.
 
(c) Recognizes that 2-SW-476 will not close and transitions to step 35b RNO column.
_______ UNSAT  
Evaluators Cues Tell operator: As operator attempts to close valve, the handwheel will not move.
 
COMMENTS:
STEP 2:  STEP 36b- Verify open or open 1-SW-500, SW Header Crosstie (MER 4)
076A2.01                                  SR09301                                                  4 of 10


STEP 4:
_______ SAT Step 36c RNO-Do the following:                                                                        _______ UNSAT
: 1) Verify open or open 2-SW-533.
: 2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit.
STANDARD:
STANDARD:
(a) Proceeds to #4 MER. (b) Locates manual valve 1-SW-500 (halfw ay across room under smoke detector). (c) Pulls pin from handwheel actuator. (d) Opens or verifies open 1-SW-500 by rotating valve handwheel in the counter clockwise direction- This is a critical step.
(a) Verifies or opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction- this is a critical step.
 
(b) Proceeds to Unit 2 BC HX SW MOV pit.
Evaluator's Cues Tell operator:  Actual valve position in plant may be open or closed. Provide appropriate cue based on initial valve position.
(c) Locates manual valve 2-SW-474.
COMMENTS:
(d) Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction- this is a critical step.
 
Evaluators Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant.
_______ SAT
If asked: After trainee identifies 2-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.
 
If asked: Confined Space meter obtained and Security notified for entry.
_______ UNSAT
Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT), the evaluator can then state the label reads 2-SW-474. The trainee can describe actions to complete valve manipulation from above.
 
Safety concern: The valve pits have been classified as confined spaces. Do not allow the trainee to enter the valve pits. The trainee should mention that the valve pits are confined spaces and indicate that additional actions are required to enter this space. If the trainee does not mention the confined space aspect, a follow-up question should be asked.
076A2.01 SR09301  4 of 10  STEP 3:  Step 36c- Close 2-SW-476, Water Box 2C Isol (MER 4)
STANDARD:
(a) Locates 2-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2-SW-476 by removing the locking pin and rotating the handwheel clockwise. (c) Recognizes that 2-SW-476 will not clos e and transitions to step 35b RNO column.
Evaluator's Cues
 
Tell operator:
As operator attempts to close valve, the handwheel will not move.
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
076A2.01 SR09301  5 of 10  STEP 4:  Step 36c RNO-  Do the following:  1) Verify open or open 2-SW-533. 2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit.
STANDARD:
(a) Verifies or opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction- this is a critical step. (b) Proceeds to Unit 2 BC HX SW MOV pit. (c) Locates manual valve 2-SW-474. (d) Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction- this is a critical step.
Evaluator's Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2-SW-474. If wrong valve ident ified, tell trainee that what they expected is not what it reads.
If asked:
Confined Space meter obtained and Security notified for entry.
 
Evaluator's Note Safety concern:
Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT
), the evaluator can then state the label reads 2-SW-474. The trainee can describe actions to complete valve manipulation from above.
Safety concern:
The valve pits have been classified as confined spaces. Do not allow the trainee to enter the valve pits. The trainee s hould mention that the valve pits are confined spaces and indicate that additional actions are required to enter this space. If the trainee does not mention the confined space aspect, a follow-up question should be asked.
Confined space gas sampler is maintained in the unit two PCS room on a shelf above the I&C workstation or they can be obtained from the tool room.
Confined space gas sampler is maintained in the unit two PCS room on a shelf above the I&C workstation or they can be obtained from the tool room.
Security concern:
Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security must be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s) - utilize hand crank to raise grating access door.
Certain valve pits are now covered by grates. If the enclosure is to be opened, security must be contacted. It is acc eptable for the trainee to describe the actions required to raise the grate(s) - utiliz e hand crank to raise grating access door.
COMMENTS:
COMMENTS:  
076A2.01                                      SR09301                                                      5 of 10


_______ SAT
STEP 5:
 
_______ SAT Step 36d-     Close 2-SW-478, SW Header Crosstie. (MER 4)
_______ UNSAT
_______ UNSAT STANDARD:
 
(a) Locates 2-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side).
076A2.01 SR09301  6 of 10  STEP 5: Step 36d- Close 2-SW-478, SW Header Crosstie. (MER 4)
(b) Pulls pin from handwheel actuator.
STANDARD:
(c) Closes or verifies closed 1-SW-478 by rotating valve handwheel in the clockwise direction- This is a critical step.
(a) Locates 2-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator. (c) Closes or verifies closed 1-SW-478 by rotating valve handwheel in the clockwise direction- This is a critical step.
Evaluators Cues Tell operator: Provide appropriate cue for valve operation based on actual in plant valve position.
Evaluator's Cues Tell operator:
Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads 2-SW-478 if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.
Provide appropriate cue for valve operation based on actual in plant valve position.
      .
Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER. . COMMENTS:  
COMMENTS:
 
STEP 6:
_______ SAT  
_______ SAT Step 37-     CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2-PL-LI-201 -
 
DECREASING                                                                       _______ UNSAT STANDARD:
_______ UNSAT
 
STEP 6:  Step 37- CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2-PL-LI-201 -
DECREASING STANDARD:
(a) Locates MER 3 level gauge 2-PL-LI-201 in MER 4.
(a) Locates MER 3 level gauge 2-PL-LI-201 in MER 4.
(b) Checks that level in MER 3 is decreasing.  
(b) Checks that level in MER 3 is decreasing.
 
Evaluators Cues Tell operator: After the operator locates MER 3 level gauge, tell him the level is 50 H 2 O and slowly decreasing.
Evaluator's Cues Tell operator: After the operator locates MER 3 level gauge, tell him the level is 50" H 2 O and slowly decreasing.
COMMENTS:
COMMENTS:  
076A2.01                                     SR09301                                                   6 of 10
 
_______ SAT
 
_______ UNSAT
 
076A2.01 SR09301 7 of 10 STEP 7:  REPORT TO SHIFT SU PERVISOR (EVALUATOR).
STANDARD:
Verbal status report that steps 36 and 37 of 1-AP-13.00 are complete.
 
EVALUATOR'S NOTE: N/A STOP TIME:           
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
STOP TIME:
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________


STEP 7:
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
_______ UNSAT STANDARD:
Verbal status report that steps 36 and 37 of 1-AP-13.00 are complete.
EVALUATORS NOTE: N/A STOP TIME:
COMMENTS:
STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
076A2.01 SR09301 8 of 10 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
076A2.01                                     SR09301                                 7 of 10
Task  Task is to be SIMULATED in the plant. Any plant mode/condition where a lar ge SW leak in #3 MER has occurred.
 
Directions The evaluator will explain the initial c onditions of the task to be performed and w ill provide the initiating cue. Ensure you indicate to the evaluator w hen you understand your assigned task.
Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
 
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves.
 
I am the Shift Manager. There is a major Service Water leak in #3 MER.


Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task Task is to be SIMULATED in the plant.
Any plant mode/condition where a large SW leak in #3 MER has occurred.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Shift Manager. There is a major Service Water leak in #3 MER.
Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
1-SW-P-10B and 2-SW-P
1-SW-P-10B and 2-SW-P-10B have been secured.
-10B have been secured.  
1-VS-E-4A, 4B, and 4C have been secured.
 
When you finish the actions necessary to accomplish this, please inform me.
1-VS-E-4A, 4B, and 4C have been secured.  
076A2.01                                        SR09301                                                          8 of 10
 
When you finish the actions necessary to accomplish this, please inform me.  
 
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
 
Initiating Cues This task is to be SIMULATED. Do NOT turn sw itches, manipulate controls or reposition valves.
 
I am the Shift Manager. There is a major Service Water leak in #3 MER.


Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
I am the Shift Manager. There is a major Service Water leak in #3 MER.
Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.
1-SW-P-10B and 2-SW-P
1-SW-P-10B and 2-SW-P-10B have been secured.
-10B have been secured.  
1-VS-E-4A, 4B, and 4C have been secured.
When you finish the actions necessary to accomplish this, please inform me.


1-VS-E-4A, 4B, and 4C have been secured.  
NUMBER                                    PROCEDURE PROC EDURE TI TLE                                  REVISION REVISION 20 O-AP-13.00 O-AP-1 3 .00                    TURB INE BUILDING BUILDIN G OR MER 3 FLOODING PAGE PAG  E 150f1 8 150f18 ACTION ! EXPECTE D RESPONSE ACTION!                                              RESPONSE RESPONS E NOT OBTAINED 36.
: 36. ISOLATE SW TO MER 3:      3:
0  a) FaiI FaiI1-SW-263 1-SW-263 closed by opening Circuit 8 on Lighting Panel Pane l 2T3 (located north of 2-FW-E-2A) 0  b) Verify open cropen oropen 1-SW-500, 1-SW-500 , SW Header Crosstie Cross tie (MER 4) 0  c) Close 2-SW-476, Water Box 2C Isol                  c) Do the following:
(MER 4 4))
0    1) Verify open or open 2-SW-533.
0    2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit.
0  d) Close 2-SW-478, SW Header Crosstie.
(MER 4)4)
: 37. CHECK WATER LEVEL IN MER 3 ON        ON MER 4        Do the foll following:
owi ng:
GAUGE 2-PL-Ll-201 2-PL-L1 -20 1 - DECREASING DECREAS ING a) Secure CHG Pump SW Pumps:
0
* 1-SW-P-10A 0
* 2-SW-P-10A 0  b) Close 1-SW-499, WaterWate r Box 1D Isol.
0  c) Close 1-SW-500, SW Header Crosstie.
38.
: 38. VERI VERIFYFY RUNN RUNNING ING AN MCR CHILLER IN                Do the following:
foll owi ng:
MER 5 lAW 0-OP-VS-006, 0-OP-VS-006 , CONTROL ROOM AND RELAY ROOM VENTILATION SYSTE M:                0  a) Start start 1-VS-E 1-VS-E-4D-4D or 1-VS-E-4 1-VS-E-4E.
E.
0    1-VS-E-4D                                      0  b) J£ an MCR Chiller can    NOT be started ,
0  . 1-VS-E-4E                                            TH THENEN initiate 0-AP-13.02, 0-AP-13.02, LOSS OF ESGR COO      LI NG COOLING


When you finish the actions necessary to accomplish this, please inform me.  
Surry                                            2009-301                              Load #3 EDG on 1J bus U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure EPE055A1.06 Applicant________________________________                            Start Time___________________
Examiner_______________________________
Date ___________________________________                              Stop Time___________________
Title RESPOND TO #3 EDG FAILURE TO LOAD IAW AP-17.05 K/A: EPE055EA1.06 Restoration of power with on ED/G (4.1/4.5)
Applicability                                        Estimated Time                    Actual Time RO/SRO(I)/SRO(U)                                    10 Minutes Conditions Task is to be PERFORMED in the simulator.
A loss of A RSST has occurred and #3 EDG failed to load.
Standards
    #3 EDG loaded onto the 1J bus in accordance with 0-AP-17.05, EDG 3 - Emergency Operations.
Initiating Cues 0-AP-10.07, Loss of Unit One Power, attachment 1.
Nuclear Shift Manager direction.
Terminating Cues 1J bus re-energized from #3 EDG. (Step 4 of attachment 2 will re-energize the bus).
Procedures 0-AP-17.05, EDG 3 - Emergency Operations Tools and Equipment                                  Safety Considerations None                                                  None Page 1 of 15


NUMBER PROCEDURE TI TLE REVISION 20 O-AP-13.00 TURB INE BUILDING OR MER 3 FL OOD IN G PAGE 150f18 ACTION! E XPEC TE D RESPONSE RESPONSE NOT OBTA I N ED 36. ISOLATE S W TO M E R 3: 0 a) F aiI 1-S W-263 c l osed by opening C ir cuit 8 on Li ghting Pane l 2 T 3 (located north o f 2-F W-E-2A) 0 b) Verify open oropen 1-S W-500 , S W H eader Crosstie (MER 4) 0 c) C l ose 2-S W-476 , W ater Bo x 2C I sol c) Do the fo ll o w ing: (M ER 4) 0 1) Verify open or open 2-S W-533. 0 2) C l ose 2-S W-47 4 , l ocated in U nit 2 BC HX S W MOV p i t. 0 d) C l ose 2-S W-478 , S W Header Crosstie.
Surry                                               2009-301                           Load #3 EDG on 1J bus Simulator Setup Recall IC-1 and initialize (or IC-317).
(M ER 4) 37. CH E CK W ATER LE VEL IN M ER 3 ON MER 4 Do the follo w ing: GAUGE 2-PL-Ll-201 -DECREASING a) Sec u re CHG Pump S W Pumps: 0
Enter the following malfunctions and place on Trigger 1 o EL0501 (Loss of A RSST) o EL1102 (Failure to start #3 EDG)
* 1-S W-P-10A 0
Initiate Trigger 1. Place the #3 EDG in EXERCISE.
* 2-S W-P-10A 0 b) Close 1-S W-499, W ate r Box 1D Iso l. 0 c) C l ose 1-S W-500 , S W H eade r Crosstie.
Delete malfunction EL1102.
: 38. V ERIF Y RUNNING AN MCR CHIL LE R IN Do the follo w ing: MER 5 l A W 0-OP-V S-006 , CONTROL ROOM AND RELAY ROOM V ENTIL ATION SYS TE M: 0 a) Start 1-V S-E-4D or 1-V S-E-4 E. 0 1-V S-E-4D 0 b) J£ a n MCR Chi l ler can NO T be started , 0 . 1-V S-E-4E TH E N init i ate 0-AP-13.02 , LOSS OF ESGR COO LI NG N U M B E R P ROC E D UR E TI T L E RE V I S I O N 20 O-AP-1 3.00 T U RB I NE B U I LDIN G OR M ER 3 F L OO D I NG P AG E 1 50 f1 8 ACTIO N! E XP E C TED R E S P ONS E R E SPONS E NO T OB T A I N E D 36. I SO L AT E SW T O M ER 3: 0 a) FaiI1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (loca ted north of 2-FW-E-2A) 0 b) Verify open cropen 1-SW-500 , SW Header Cross tie (MER 4) 0 c) Close 2-SW-476 , Water Box 2C Isol c) Do the follo w ing: (MER 4) 0 1) Verify open or open 2-SW-533. 0 2) Close 2-SW-474 , located in Unit 2 BC HX SW MOV pit. 0 d) Close 2-SW-478 , SW Header Crosstie. (M ER 4) 3 7. C H E C K WA TER L E V E L IN M E R 3 ON M E R 4 D o the f o ll owi ng: GAUG E 2-P L-L1-201 -DE C RE AS I N G a) Secure CHG Pump SW Pumps: 0
Using XtremeView EDG 3 ECC, silence and reset local alarms.
* 1-S W-P-10A 0
Place Simulator in FREEZE.
* 2-SW-P-10A 0 b) Close 1-S W-499, Wa ter Box 1D Isol. 0 c) Close 1-S W-500 , SW Header Crosstie.
Unit 2 manipulations may be controlled from a MONITOR screen (lcjpm5506.mon)
: 38. V E RI F Y RUNN I N G AN MC R C HIL L ER IN D o t he f o ll owi ng: MER 5 l AW 0-O P-VS-006 , CO NTR OL R OOM A ND REL AY R OO M V E NT IL A T ION SYS TE M: 0 a) start 1-VS-E-4D or 1-VS-E-4E. 0 1-VS-E-4D 0 b) J£ an MCR Chiller can NOT be started , 0 . 1-VS-E-4E THEN initiate 0-AP-13.02, LOSS OF ESGR COOLING Surry 2009-301 Load #3 EDG on 1J bus Page 1 of 15 U.S. Nuclear Regulatory Commission  Surry Power Station
Initiating Cues 0-AP-10.07, Loss of Unit One Power, attachment 1.
 
Nuclear Shift Manager direction.
SR09301  Simulator Job Performance Measure EPE055A1.06
Directions to the Applicant I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.
 
Maintenance has identified and corrected the problem.
Applicant________________________________    Start Time___________________
Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.
 
Maintenance personnel are standing by to assist as required.
Examiner_______________________________
When you finish the actions necessary to accomplish this, please inform me.
 
Notes Page 2 of 15
Date ___________________________________  Stop Time___________________
 
Title RESPOND TO #3 EDG FAILURE TO LOAD IAW AP-17.05
 
K/A: EPE055EA1.06 Restoration of power with on ED/G (4.1/4.5)
Applicability      Estimated Time Actual Time RO/SRO(I)/SRO(U)    10 Minutes                       
 
Conditions
 
Task is to be PERFORMED in the simulator. A loss of "A" RSST has occurred and #3 EDG failed to load.
 
Standards 
#3 EDG loaded onto the 1J bus in accordance wi th 0-AP-17.05, EDG 3 - Emergency Operations.
 
Initiating Cues
 
0-AP-10.07, Loss of Unit One Power, attachment 1. Nuclear Shift Manager direction.
 
Terminating Cues
 
1J bus re-energized from #3 EDG.  (Step 4 of attachment 2 will re-energize the bus).
 
Procedures
 
0-AP-17.05, EDG 3 - Emergency Operations Tools and Equipment    Safety Considerations
 
None      None Surry 2009-301 Load #3 EDG on 1J bus Page 2 of 15 Simulator Setup Recall IC-1 and initialize (or IC-317). Enter the following malfunctions and place on Trigger 1 o EL0501 (Loss of "A" RSST) o EL1102 (Failure to start #3 EDG) Initiate Trigger 1. Place the #3 EDG in EXERCISE. Delete malfunction EL1102. Using XtremeView EDG 3 ECC, silence and reset local alarms. Place Simulator in FREEZE. Unit 2 manipulations may be controll ed from a MONITOR screen (lcjpm5506.mon)
Initiating Cues 0-AP-10.07, Loss of Unit One Power, attachment 1. Nuclear Shift Manager direction.  
 
Directions to the Applicant I am the Shift Manager and you are the 3 RD license. A loss of the "A" RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07. Maintenance has identified and corrected the problem. Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05. Maintenance personnel are standing by to assist as required. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2009-301 Load #3 EDG on 1J bus Page 3 of 15 PERFORMANCE CHECKLIST Notes to the Evaluator
 
Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. 


Surry                                              2009-301                            Load #3 EDG on 1J bus PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
START TIME:
STEP 1: CAUTIONS PRIOR TO STEP 1 STANDARD:
STEP 1:
a) Reads caution that EDG should not run unloaded for >10 minutes if the associated emergency bus is deenergized.  
_______ SAT CAUTIONS PRIOR TO STEP 1
 
_______ UNSAT STANDARD:
b) Reads caution that the cooldown cycle should complete before initiating a start sequence on the EDG.  
a) Reads caution that EDG should not run unloaded for >10 minutes if the associated emergency bus is deenergized.
 
b) Reads caution that the cooldown cycle should complete before initiating a start sequence on the EDG.
c) Reads caution that the shift supervisor should determine bus priority for #3 EDG.  
c) Reads caution that the shift supervisor should determine bus priority for #3 EDG.
 
d) Reads caution regarding #3 EDG output breaker permissive.
d) Reads caution regarding #3 EDG output breaker permissive.
UNIT TWO CUE: If asked , 2J bus is energiz ed by offsite power.  
UNIT TWO CUE: If asked, 2J bus is energized by offsite power.
COMMENTS:
STEP 2:
_______ SAT STEP 1 -    ASK ELECTRICAL AND MECHANICAL DEPARTMENTS TO PROVIDE ASSISTANCE.                                                                      _______ UNSAT STANDARD:
Asks Shift Manager for Maintenance support.
EVALUATORS NOTE: N/A COMMENTS:
Page 3 of 15


COMMENTS:
Surry                                                 2009-301                     Load #3 EDG on 1J bus STEP 3:
 
_______ SAT Step 2 - CHECK EDG 3 - WILL BE ALIGNED TO UNIT 1
_______ SAT
_______ UNSAT STANDARD:
 
Recalls from initial direction that #3 EDG desired to be loaded on Unit 1 EVALUATORS NOTE:
_______ UNSAT
If asked:   It is desired to load #3 EDG on 1J bus.
 
COMMENTS:
STEP 2:  STEP 1 -  ASK ELECTRICAL AND MECHANI CAL DEPARTMENTS TO PROVIDE ASSISTANCE.
STEP 4:
STANDARD:
_______ SAT Step 3 - COMMIT EDG 3 TO UNIT 1:
 
a) Place the UNIT 2 PNL 3-2 SWITCH 43-15J3 IN BYP COMMITS NO. 3 EDG           _______ UNSAT TO UNIT 1 in BYP- this is a critical step.
Asks Shift Manager for Maintenance support.
b) Place Emergency Supply Breaker 25J3 in PTL - this is critical step.
 
STANDARD:
EVALUATOR'S NOTE: N/A COMMENTS:
Directs Unit Two to perform the two actions.
 
EVALUATORS NOTE: N/A BOOTH NOTE:
_______ SAT
When the operator requests the bypass switch:
 
set u2_eg3_bypass = TRUE Report it is in bypass When the operator requests 25J3 in PTL:
_______ UNSAT
Set ed25j3_lock = TRUE.
 
Report 25J3 is in PTL.
Surry 2009-301 Load #3 EDG on 1J bus Page 4 of 15 STEP 3: Step 2 - CHECK EDG 3 - WILL BE ALIGNED TO UNIT 1 STANDARD:
Recalls from initial direction that #3 EDG desired to be loaded on Unit 1 EVALUATOR'S NOTE:
If asked: It is desired to load #3 EDG on 1J bus.  
 
COMMENTS:  
 
_______ SAT  
 
_______ UNSAT
 
STEP 4:  Step 3 - COMMIT EDG 3 TO UNIT 1:
a) Place the UNIT 2 PNL 3-2 SWITCH 43-15J3 IN BYP COMMITS NO. 3 EDG TO UNIT 1 in BYP- this is a critical step. b) Place Emergency Supply Breaker 25J3 in PTL - this is critical step.
STANDARD:   Directs Unit Two to perform the two actions.  
 
EVALUATOR'S NOTE: N/A BOOTH NOTE: When the operator requests the bypass switch: set u2_eg3_bypass = TRUE Report it is in bypass   When the operator requests 25J3 in PTL: Set ed25j3_lock = TRUE. Report 25J3 is in PTL.
COMMENTS:
COMMENTS:
_______ SAT
Page 4 of 15
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 5 of 15 STEP 5:  NOTE PRIOR TO STEP 4 STANDARD:


Surry                                            2009-301            Load #3 EDG on 1J bus STEP 5:
_______ SAT NOTE PRIOR TO STEP 4
_______ UNSAT STANDARD:
Reads note regarding effects of a START FAILURE on EDG operation.
Reads note regarding effects of a START FAILURE on EDG operation.
 
EVALUATORS CUE: If asked, a start failure did not previously occur.
EVALUATOR'S CUE: If asked, a start failure did not previously occur.
COMMENTS:
COMMENTS:  
STEP 6:
 
_______ SAT Step 4 - CHECK ANNUNCIATOR VSP-B5, EMERG GEN 3 TRBL - NOT LIT
_______ SAT  
_______ UNSAT STANDARD:
 
_______ UNSAT
 
STEP 6:  Step 4 - CHECK ANNUNCIATOR VSP-B5, EMERG GEN 3 TRBL - NOT LIT STANDARD:
Verifies annunciator VSP-B5 NOT LIT.
Verifies annunciator VSP-B5 NOT LIT.
EVALUATOR'S NOTE: N/A  
EVALUATORS NOTE: N/A COMMENTS:
STEP 7:
_______ SAT Step 5 - VERIFY AUXILIARY TRIP RELAY - RESET:
Amber light on Unit 1 EDG 3 Control Panel - NOT LIT        _______ UNSAT STANDARD:
Verifies amber light on Unit One EDG 3 control panel NOT LIT.
EVALUATORS NOTE: N/A COMMENTS:
Page 5 of 15


COMMENTS:  
Surry                                            2009-301                            Load #3 EDG on 1J bus STEP 8:
_______ SAT Step 6 - CHECK EDG - RUNNING
_______ UNSAT STANDARD:
Verifies EDG NOT running by observing engine speed indicator at 0 (zero) rpm.
Performs RNO action and GOES TO ATTACHMENT 2 EVALUATORS NOTE: N/A COMMENTS:
STEP 9:
_______ SAT  - Step 1 - Place AUTO-EXERCISE EMERG GEN 3 switch to EXERCISE.
_______ UNSAT STANDARD:
Identifies AUTO/EXERCISE switch and verifies position to be in EXERCISE EVALUATORS NOTE: N/A COMMENTS:
STEP 10:
_______ SAT Attachment 2 - Step 2-    IF ( )J Bus de-energized, THEN strip loads IAW Attachment 3 (1J Bus) or Attachment 4 (2J Bus).                              _______ UNSAT STANDARD:
Verifies 1J bus deenergized by observing bus 1J voltmeter at 0 (zero) volts.
GOES TO ATTACHMENT 3 EVALUATORS NOTE: N/A COMMENTS:
Page 6 of 15


_______ SAT
Surry                                           2009-301                             Load #3 EDG on 1J bus STEP 11:
 
_______ SAT - Step 1- To strip the 1J Bus, place the following control switches in PULL-TO-LOCK.                                                           _______ UNSAT 1-SI-P-1B (14J3) 1-CS-P-1B (14J5) 1-RS-P-1B (14J4) 1-RS-P-2B (14J8) 1-VS-F-1B (14J7)
_______ UNSAT
PRZR Heater Group A (14J9) 1-VS-F-58B, if powered from ALTERNATE source, 14J1-3 1-CH-P-1B (15J5) 1-CH-P-1C (15J2, ALT) 1-FW-P-3B (15J4)
 
STEP 7:  Step 5 -  VERIFY AUXILIARY TRIP RELAY - RESET:  Amber light on Unit 1 EDG 3 Control Panel - NOT LIT STANDARD:
Verifies amber light on Unit One EDG 3 control panel NOT LIT.
 
EVALUATOR'S NOTE: N/A
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 6 of 15 STEP 8:  Step 6 - CHECK EDG - RUNNING STANDARD:
Verifies EDG NOT running by observing engine speed indicator at 0 (zero) rpm. Performs RNO action and GOES TO ATTACHMENT 2 EVALUATOR'S NOTE: N/A
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT  
 
STEP 9:  Attachment 2 - Step 1
- Place AUTO-EXERCISE EMERG GEN 3 switch to EXERCISE.
STANDARD:
STANDARD:
Identifies AUTO/EXERCISE switch and verifies position to be in EXERCISE EVALUATOR'S NOTE: N/A  
Places the following components in PTL (the following are critical steps):
 
1-SI-P-1B (14J3) 1-CS-P-1B (14J5) 1-RS-P-1B (14J4) 1-RS-P-2B (14J8) 1-VS-F-1B (14J7)
COMMENTS:  
PRZR Heater Group A (14J9) 1-CH-P-1B (15J5) 1-FW-P-3B (15J4)
EVALUATORS NOTE:
1-VS-F-58B will be powered from the normal source and therefore should NOT be placed in PTL 1-CH-P-1C (15J2- ALT) is maintained in PTL - no action will be required.
COMMENTS:
Page 7 of 15


_______ SAT  
Surry                                                2009-301                            Load #3 EDG on 1J bus STEP 12:
 
_______ SAT  - Step 2-     Verify breakers open by checking breaker position indicating lights                      - RED LIGHTS NOT LIT                                                _______ UNSAT 1-CS-P-1B (14J5) 1-RS-P-1B (14J4)
_______ UNSAT
 
STEP 10: Attachment 2 - Step 2
- IF ( )J Bus de-energized, THEN strip loads IAW Attachment 3  (1J Bus) or Attachment 4 (2J Bus).
STANDARD:
STANDARD:
Verifies 1J bus deenergized by observing bus 1J voltmeter at 0 (zero) volts. GOES TO ATTACHMENT 3
Verifies the red lights are extinguished for both components.
 
EVALUATORS NOTE: N/A COMMENTS:
EVALUATOR'S NOTE: N/A
STEP 13:
 
_______ SAT  - Step 3-     Verify breaker open by checking breaker position indicating light -
COMMENTS:
RED LIGHT NOT LIT                                                   _______ UNSAT 1-FW-P-3B (15J4)
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 7 of 15 STEP 11:  Attachment 3 - Step 1
-  To strip the 1J Bus, place the following control switches in PULL-TO-LOCK. 1-SI-P-1B (14J3)  1-CS-P-1B (14J5)  1-RS-P-1B (14J4)  1-RS-P-2B (14J8)  1-VS-F-1B (14J7)  PRZR Heater Group A (14J9)  1-VS-F-58B, if powered from ALTERNATE source, 14J1-3  1-CH-P-1B (15J5)  1-CH-P-1C (15J2, ALT)  1-FW-P-3B (15J4)
STANDARD:
Places the following components in PTL (the following are critical steps):  1-SI-P-1B (14J3)  1-CS-P-1B (14J5)  1-RS-P-1B (14J4)  1-RS-P-2B (14J8)  1-VS-F-1B (14J7)  PRZR Heater Group A (14J9)  1-CH-P-1B (15J5)  1-FW-P-3B (15J4)
 
EVALUATOR'S NOTE:
1-VS-F-58B will be powered from the normal source and therefore should NOT be placed in PTL  1-CH-P-1C (15J2- ALT) is maintai ned in PTL - no action will be required.
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 8 of 15 STEP 12:  Attachment 3 - Step 2
-  Verify breakers open by checking breaker position indicating lights    - RED LIGHTS NOT LIT  1-CS-P-1B (14J5)  1-RS-P-1B (14J4)
STANDARD:  Verifies the red lights are extinguished for both components.  
 
EVALUATOR'S NOTE: N/A COMMENTS:  
 
_______ SAT  
 
_______ UNSAT
 
STEP 13: Attachment 3 - Step 3-Verify breaker open by checking breaker position indicating light - RED LIGHT NOT LIT 1-FW-P-3B (15J4)
STANDARD:
STANDARD:
Verifies the red lights are extinguished for 1-FW-P-3B.
Verifies the red lights are extinguished for 1-FW-P-3B.
EVALUATOR'S NOTE: N/A  
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 14:
COMMENTS:  
_______ SAT  - Step 4-     Verify open or open 15J8, 1J Bus Normal Supply Breaker.
 
_______ UNSAT STANDARD:
_______ SAT  
Verifies breaker 15J8 open by observing Green and Amber lights lit EVALUATORS NOTE:
 
Candidate may elect to green flag control switch COMMENTS:
_______ UNSAT
Page 8 of 15
 
STEP 14: Attachment 3 - Step 4-Verify open or open 15J8, 1J Bus Normal Supply Breaker.
STANDARD:
Verifies breaker 15J8 open by observing Green and Amber lights lit EVALUATOR'S NOTE:
Candidate may elect to green flag control switch COMMENTS:  


_______ SAT
Surry                                               2009-301                             Load #3 EDG on 1J bus STEP 15:
 
_______ SAT - Step 4-     Verify open or locally open 15J9, 1J Stub Bus Supply Breaker.
_______ UNSAT
_______ UNSAT STANDARD:
 
Surry 2009-301 Load #3 EDG on 1J bus Page 9 of 15 STEP 15:  Attachment 3 - Step 4-Verify open or locally open 15J9, 1J Stub Bus Supply Breaker.
STANDARD:
Checks breaker 15J9 open by any of the following means:
Checks breaker 15J9 open by any of the following means:
o Checks breaker position on PCS o Dispatches operator to loca lly verify breaker position Returns to ATTACHMENT 2 step 3.
o Checks breaker position on PCS o Dispatches operator to locally verify breaker position Returns to ATTACHMENT 2 step 3.
EVALUATOR'S NOTE: N/A
EVALUATORS NOTE: N/A BOOTH OPERATOR:
 
BOOTH OPERATOR:
If dispatched to locally verify 15J9 open, report time compression has occurred and that breaker 15J9 is OPEN.
If dispatched to locally verify 15J9 open, report time compression has occurred and that breaker 15J9 is OPEN.
COMMENTS:  
COMMENTS:
 
STEP 16:
_______ SAT  
_______ SAT  - Step 3-     Verify the Load Limit Control on the UG-8 Governor is at the maximum clockwise position, which is past the 10 mark.               _______ UNSAT STANDARD:
 
Dispatches operator to locally verify position of the Load Limit Control Knob EVALUATORS NOTE: N/A BOOTH OPERATOR:
_______ UNSAT
If dispatched to locally verify load limit control knob position, report that time compression has occurred and that the load limit control knob is in the fully clockwise position, which is past the 10 mark.
 
COMMENTS:
STEP 16: Attachment 2 - Step 3-Verify the Load Limit Control on the UG-8 Governor is at the   maximum clockwise position, which is past the 10 mark.
Page 9 of 15
STANDARD:
Dispatches operator to locally verify position of the Load Limit Control Knob EVALUATOR'S NOTE: N/A
 
BOOTH OPERATOR:
If dispatched to locally verify load limit control knob position, report that time compression has occurred and that the load limit control knob is in the fully clockwise position, which is past the 10 mark.  
 
COMMENTS:  
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 10 of 15 STEP 17:  Attachment 2 - Step 4-Press EMERG GEN NO. 3 ENGINE START pushbutton.


STANDARD:
Surry                                            2009-301                        Load #3 EDG on 1J bus STEP 17:
_______ SAT  - Step 4-    Press EMERG GEN NO. 3 ENGINE START pushbutton.
_______ UNSAT STANDARD:
Depresses the #3 EDG engine start button (critical step)
Depresses the #3 EDG engine start button (critical step)
EVALUATOR'S NOTE: N/A
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 18:
COMMENTS:  
_______ SAT  - Step 5-
 
_______ UNSAT IF engine has NOT started, THEN GO TO Step 6 of this Attachment.
_______ SAT  
 
_______ UNSAT
 
STEP 18: Attachment 2 - Step 5-     IF engine has NOT started, THEN GO TO Step 6 of this Attachment.  
 
IF engine has started, THEN do the following:
IF engine has started, THEN do the following:
: a. Verify speed at approximately 900 RP M. IF NOT at 900 RPM, THEN adjust speed using EMERG GEN NO 3 SPEED ADJ control switch.
: a. Verify speed at approximately 900 RPM. IF NOT at 900 RPM, THEN adjust speed using EMERG GEN NO 3 SPEED ADJ control switch.
: b. Place AUTO-EXERCISE EMERG GEN 3 switch to AUTO.
: b. Place AUTO-EXERCISE EMERG GEN 3 switch to AUTO.
: c. RETURN TO procedure Step 8.
: c. RETURN TO procedure Step 8.
STANDARD:
STANDARD:
Verifies engine started by observi ng engine speed at approximately 900 rpm. Places AUTO-EXERCISE switch to AUTO (Critical Step) Returns to procedure step 8.
Verifies engine started by observing engine speed at approximately 900 rpm.
EVALUATOR'S NOTE:   Candidate may fine tune engine RPM depending on individual's interpretation of "approximately". When placed in AUTO, the EDG will assume 1J bus loads. Candidate could report JPM complete at this poin
Places AUTO-EXERCISE switch to AUTO (Critical Step)
: t. This is acceptable.  
Returns to procedure step 8.
EVALUATORS NOTE:
Candidate may fine tune engine RPM depending on individuals interpretation of approximately.
When placed in AUTO, the EDG will assume 1J bus loads. Candidate could report JPM complete at this point. This is acceptable.
COMMENTS:
Page 10 of 15


COMMENTS:  
Surry                                              2009-301                            Load #3 EDG on 1J bus STEP 19:
_______ SAT Note - the candidate should now be in the body of the procedure at step 8
_______ UNSAT Step 8- CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POWER STANDARD:
Identifies that both J busses are NOT supplied by offsite power by noting breaker 15J3 closed.
Goes to RNO and then to step 10.
EVALUATORS NOTE: N/A COMMENTS:
STEP 20:
_______ SAT NOTES PRIOR TO STEP 10
_______ UNSAT STANDARD:
Reads note regarding consequence of 1B DC bus loss on EDG loading.
Reads note regarding closing permissives on EDG output breaker.
EVALUATORS NOTE: N/A COMMENTS:
Page 11 of 15


_______ SAT
Surry                                             2009-301               Load #3 EDG on 1J bus STEP 21:
 
_______ SAT Step 10-  CHECK EDG 3 - SUPPLYING J BUS 15J3 - CLOSED                                                       _______ UNSAT OR 25J3 - CLOSED STANDARD:
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 11 of 15 STEP 19:  Note - the candidate should now be in the body of the procedure at step 8 Step 8-  CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POWER STANDARD:
Identifies that both "J" busses are NOT s upplied by offsite power by noting breaker 15J3 closed. Goes to RNO and then to step 10.
EVALUATOR'S NOTE: N/A COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
STEP 20:  NOTES PRIOR TO STEP 10 STANDARD:
Reads note regarding consequence of 1B DC bus loss on EDG loading. Reads note regarding closing permissives on EDG output breaker.
EVALUATOR'S NOTE: N/A COMMENTS:
 
_______ SAT  
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 12 of 15 STEP 21:  Step 10-  CHECK EDG 3 - SUPPLYING J BUS 15J3 - CLOSED OR 25J3 - CLOSED STANDARD:
Verifies EDG supplying 1J bus by verifying breaker 15J3 closed.
Verifies EDG supplying 1J bus by verifying breaker 15J3 closed.
EVALUATOR'S NOTE: N/A COMMENTS:  
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 22:
_______ SAT  
_______ SAT NOTES PRIOR TO STEP 11
 
_______ UNSAT STANDARD:
_______ UNSAT
Reads note regarding approximate power consumed by various emergency bus loads.
 
Reads note regarding power supply to the RSST.
STEP 22:  NOTES PRIOR TO STEP 11 STANDARD:
Reads note regarding EDG MCC power verification.
Reads note regarding approximate power consumed by various emergency bus loads. Reads note regarding power supply to the RSST. Reads note regarding EDG MCC power verification.
EVALUATORS NOTE: N/A COMMENTS:
EVALUATOR'S NOTE: N/A COMMENTS:  
STEP 23:
 
_______ SAT Step 11- LOAD ( )J BUS IAW SHIFT SUPERVISION DIRECTION
_______ SAT  
_______ UNSAT STANDARD:
 
Reports to shift supervisor that EDG is ready for loading.
_______ UNSAT
EVALUATORS NOTE: N/A COMMENTS:
 
Page 12 of 15
STEP 23:  Step 11- LOAD ( )J BUS IAW SHIFT SUPERVISION DIRECTION STANDARD:
Reports to shift supervisor t hat EDG is ready for loading.
EVALUATOR'S NOTE: N/A COMMENTS:  
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Load #3 EDG on 1J bus Page 13 of 15 STEP 24:  REPORT TO SHIFT SU PERVISOR (EVALUATOR).
STANDARD:
Verbal status report that #3 ED G is loaded onto 1J emergency bus.
 
EVALUATOR'S NOTE: N/A STOP TIME:           
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT


Surry                                              2009-301            Load #3 EDG on 1J bus STEP 24:
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
_______ UNSAT STANDARD:
Verbal status report that #3 EDG is loaded onto 1J emergency bus.
EVALUATORS NOTE: N/A STOP TIME:
COMMENTS:
STOP TIME:
STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Page 13 of 15


____________________________________________________________________________________
Surry                                                 2009-301                             Load #3 EDG on 1J bus Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
Surry 2009-301 Load #3 EDG on 1J bus Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task Task is to be performed in the simulator.
Task Task is to be performed in the simulator.
Perform Steps of 0-AP-17.05, EDG #3 - Emergenc y Operations, to energi ze 1J emergency bus.  
Perform Steps of 0-AP-17.05, EDG #3 - Emergency Operations, to energize 1J emergency bus.
 
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Directions The evaluator will explain the initial c onditions of the task to be performed and w ill provide the initiating cue. Ensure you indicate to the evaluator w hen you understand your assigned task.
Initial Conditions A RSST has been lost and #3 EDG failed to assume associated loads.
Initial Conditions "A" RSST has been lost and #3 EDG failed to assume associated loads.  
Initiating Cues I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.
 
Initiating Cues I am the Shift Manager and you are the 3 RD license. A loss of the "A" RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.
Maintenance has identified and corrected the problem.
Maintenance has identified and corrected the problem.
Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.
Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.
Maintenance personnel are standing by to assist as required.
Maintenance personnel are standing by to assist as required.
When you finish the actions necessary to accomplish this, please inform me.
When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions "A" RSST has been lost and #3 EDG failed to assume associated loads.


Initiating Cues I am the Shift Manager and you are the 3 RD license. A loss of the "A" RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions A RSST has been lost and #3 EDG failed to assume associated loads.
Initiating Cues I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.
Maintenance has identified and corrected the problem.
Maintenance has identified and corrected the problem.
Here is a copy of AP-17.05. I need you to load  
Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.
#3 EDG onto the 1J bus in accordance with AP-17.05.
Maintenance personnel are standing by to assist as required.
Maintenance personnel are standing by to assist as required.
When you finish the actions necessary to accomplish this, please inform me.  
When you finish the actions necessary to accomplish this, please inform me.


Surry 2009-301 Establish Redundant Flowpaths Page 1 of 10 U.S. Nuclear Regulatory Commission Surry Power Station  
Surry                                             2009-301                     Establish Redundant Flowpaths U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure 006A4.07 (4.4/4.4)
Applicant________________________________                            Start Time___________________
Examiner_______________________________
Date ___________________________________                            Stop Time___________________
Title ESTABLISH CHG PUMP REDUNDANT FLOW PATHS K/A: 006A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves (4.4/4.4)
Applicability                                        Estimated Time                Actual Time RO/SRO(I)/SRO(U)                                    10 Minutes Conditions Task is to be PERFORMED in the simulator.
A SBLOCA has occurred. 1-E-1 has been performed up to the point where redundant Chg/SI flow-paths are being established.
Standards 1-E-1, Loss of Reactor or Secondary Coolant, step 19 complete with one charging pump flowing on the normal SI header, one charging pump flowing on the alternate header, and the remaining charging pump secured with one discharge valve closed.
Initiating Cues 1-E-1, Loss of Reactor or Secondary Coolant, step 19.
Shift Manager direction Terminating Cues 1-E-1, step 19 completed Procedures 0-AP-17.05, EDG 3 - Emergency Operations Tools and Equipment                                  Safety Considerations Page 1 of 10


SR09301  Simulator Job Performance Measure 006A4.07 (4.4/4.4)
Surry    2009-301      Establish Redundant Flowpaths None        None Page 2 of 10


Applicant________________________________    Start Time___________________
Surry                                               2009-301                   Establish Redundant Flowpaths Simulator Setup Call up 100% power IC and initialize- or IC-315.
 
Enter malfunction for RCS non-isolable break (RC04 to 90% degradation).
Examiner_______________________________
Perform 1-AP-16.00, 1-E-0 (do not stop 3rd charging pump), and 1-E-1 up to step 19. Secure RCPs at 30 degrees subcooling and close mini-flow recircs.
 
Initiating Cues 1-E-1, Loss of Reactor or Secondary Coolant, step 19.
Date ___________________________________  Stop Time___________________
Shift Manager direction Directions to the Applicant I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.
 
Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.
Title ESTABLISH CHG PUMP REDUNDANT FLOW PATHS
When you finish the actions necessary to accomplish this, please inform me.
 
Notes Page 3 of 10
K/A: 006A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves (4.4/4.4)
Applicability      Estimated Time Actual Time RO/SRO(I)/SRO(U)    10 Minutes                       
 
Conditions
 
Task is to be PERFORMED in the simulator. A SBLOCA has occurred. 1-E-1 has been performed up to the point where redundant Chg/SI flow-paths are being established.
 
Standards 1-E-1, Loss of Reactor or Secondary Coolant, step 19 complete with one charging pump flowing on the normal SI header, one charging pump flowing on the alternate header, and the remaining charging pump secured with one discharge valve closed.
 
Initiating Cues
 
1-E-1, Loss of Reactor or Secondary Coolant, step 19. Shift Manager direction
 
Terminating Cues 1-E-1, step 19 completed
 
Procedures
 
0-AP-17.05, EDG 3 - Emergency Operations
 
Tools and Equipment    Safety Considerations
 
Surry 2009-301 Establish Redundant Flowpaths Page 2 of 10  None      None Surry 2009-301 Establish Redundant Flowpaths Page 3 of 10 Simulator Setup Call up 100% power IC and initialize- or IC-315. Enter malfunction for RCS non-isolable break (RC04 to 90% degradation). Perform 1-AP-16.00, 1-E-0 (do not stop 3 rd charging pump
), and 1-E-1 up to step 19. Secure RCPs at 30 degrees subcooling and close mini-flow recircs.
Initiating Cues 1-E-1, Loss of Reactor or Secondary Coolant, step 19. Shift Manager direction  
 
Directions to the Applicant
 
I am the Shift Manager. A LOCA has occurred on Unit
: 1. We are in procedure 1-E-1 for a loss of Reactor coolant. Here's a copy of 1-E-1, step 19. I need you to est ablish Charging pump redundant flow paths in accordance with step 19. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2009-301 Establish Redundant Flowpaths Page 4 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator
 
Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. 


Surry                                              2009-301                    Establish Redundant Flowpaths PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
START TIME:
Evaluator's note- this document represents the optimal char g in g pump confi g uration. Critical actions are considered SAT if, at task completion: one charging pump is aligned to the normal header, one pump aligned to the alternate header, and the 3 rd charging pump is secured with one discharge valve closed.
Evaluators note- this document represents the optimal charging pump configuration.
 
Critical actions are considered SAT if, at task completion: one charging pump is aligned       _______ SAT to the normal header, one pump aligned to the alternate header, and the 3rd charging pump is secured with one discharge valve closed.                                               _______ UNSAT STEP 1:
STEP 1: NOTES PRIOR TO STEP 1 STANDARD:
NOTES PRIOR TO STEP 1 STANDARD:
a) Reads note regarding charging pump priority.  
a) Reads note regarding charging pump priority.
 
b) Reads note that the highest priority charging pump should be aligned to the normal header.
b) Reads note that the highest priority charging pump should be aligned to the normal header. COMMENTS:  
COMMENTS:
 
STEP 2:
_______ SAT  
_______ SAT STEP 19a - Check CHG pumps - THREE RUNNING
 
_______ UNSAT STANDARD:
_______ UNSAT
Examines charging pump configuration and determines that three charging pumps are in service.
 
Goes to step 19b EVALUATORS NOTE: N/A COMMENTS:
STEP 2:  STEP 19a - Check CHG pumps - THREE RUNNING STANDARD:  
Page 4 of 10
 
Examines charging pump configuration and determines that three charging pumps are in service. Goes to step 19b  
 
EVALUATOR'S NOTE: N/A COMMENTS:  
 
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Establish Redundant Flowpaths Page 5 of 10 STEP 3:  STEP 19b-  Stop one CHG pump and put in PTL STANDARD:
 
In accordance with note prior to step 19, determines that 1-CH-P-1A is lowest priority charging pump  Secures 1-CH-P-1A and places in PTL- This is a critical step.
 
EVALUATOR'S NOTE: N/A COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
STEP 4:  Step 19c -  Open alternate HHSI to cold legs:  1-SI-MOV-1842- this is a critical step STANDARD:  Opens 1-SI-MOV-1842 EVALUATOR'S NOTE: N/A COMMENTS: 
 
_______ SAT
 
_______ UNSAT


Surry                                            2009-301                      Establish Redundant Flowpaths STEP 3:
_______ SAT STEP 19b- Stop one CHG pump and put in PTL
_______ UNSAT STANDARD:
In accordance with note prior to step 19, determines that 1-CH-P-1A is lowest priority charging pump Secures 1-CH-P-1A and places in PTL- This is a critical step.
EVALUATORS NOTE: N/A COMMENTS:
STEP 4:
_______ SAT Step 19c -    Open alternate HHSI to cold legs:
1-SI-MOV-1842- this is a critical step                                      _______ UNSAT STANDARD:
Opens 1-SI-MOV-1842 EVALUATORS NOTE: N/A COMMENTS:
STEP 5:
STEP 5:
Step 19d -  Align one CHG pump to flow through the normal SI HDR by closing the associated alternate discharge MOV: 1-CH-P-1A 1-CH-MOV-1287A 1-CH-P-1B 1-CH-MOV-1287B 1-CH-P-1C 1-CH-MOV-1287C STANDARD:  
_______ SAT Step 19d -  Align one CHG pump to flow through the normal SI HDR by closing the associated alternate discharge MOV:                                               _______ UNSAT 1-CH-P-1A 1-CH-MOV-1287A 1-CH-P-1B 1-CH-MOV-1287B 1-CH-P-1C 1-CH-MOV-1287C STANDARD:
 
Recalls from note prior to step that C charging pump should be aligned to the normal header and therefore closes 1-CH-MOV-1287C (1-CH-P-1C alternate discharge valve) - This is a critical step.
Recalls from note prior to step that "C" charging pump should be aligned to the normal header and therefore closes 1-CH-MOV-1287C (1-CH-P-1C alternate discharge valve) - This is a critical step.  
EVALUATORS NOTE: N/A COMMENTS:
Page 5 of 10


EVALUATOR'S NOTE: N/A COMMENTS:
Surry                                           2009-301                     Establish Redundant Flowpaths STEP 6:
 
_______ SAT Step 19e -  Align the other running CHG pump to flow through the alternate SI HDR by closing the associated normal discharge MOV:                                   _______ UNSAT 1-CH-P-1A 1-CH-MOV-1286A 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:
_______ SAT
 
_______ UNSAT
 
Surry 2009-301 Establish Redundant Flowpaths Page 6 of 10 STEP 6: Step 19e -  Align the other running CHG pump to fl ow through the alternate SI HDR by closing the associated normal discharge MOV: 1-CH-P-1A 1-CH-MOV-1286A 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:
Determines that 1-CH-P-1B is the other running charging pump and closes 1-CH-MOV-1286B (1-CH-P-1B normal discharge valve) - This is a critical step.
Determines that 1-CH-P-1B is the other running charging pump and closes 1-CH-MOV-1286B (1-CH-P-1B normal discharge valve) - This is a critical step.
EVALUATOR'S NOTE: N/A  
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 7:
COMMENTS:  
_______ SAT Step 19f -  Close the normal discharge MOV on the NON-RUNNING CHG pump:
 
1-CH-P-1A 1-CH-MOV-1286A                                                   _______ UNSAT 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:
_______ SAT  
Determines that 1-CH-P-1A is secured (in PTL) and closes 1-CH-MOV-1286A (1-CH-P-1A normal discharge valve). This is a critical step.
 
EVALUATORS NOTE: N/A COMMENTS:
_______ UNSAT
Page 6 of 10
 
STEP 7:  Step 19f -  Close the normal discharge MOV on the NON-RUNNING CHG pump: 1-CH-P-1A 1-CH-MOV-1286A 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:
Determines that 1-CH-P-1A is secured (in PTL) and closes 1-CH-MOV-1286A (1-CH-P-1A normal discharge valve). This is a critical step.      
 
EVALUATOR'S NOTE: N/A  
 
COMMENTS:  
 
_______ SAT
 
_______ UNSAT


Surry 2009-301 Establish Redundant Flowpaths Page 7 of 10 STEP 8: Step 19g - Verify HHSI flow through BOTH headers 1-SI-FI-1940 1-SI-FI-1940A 1-SI-FI-1943 1-SI-FI-1943A STANDARD:
Surry                                                 2009-301                 Establish Redundant Flowpaths STEP 8:
_______ SAT Step 19g - Verify HHSI flow through BOTH headers 1-SI-FI-1940                                                               _______ UNSAT 1-SI-FI-1940A 1-SI-FI-1943 1-SI-FI-1943A STANDARD:
Verifies flow indication on all the above listed flowmeters.
Verifies flow indication on all the above listed flowmeters.
EVALUATOR'S NOTE: N/A  
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 9:
COMMENTS:  
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
 
_______ UNSAT STANDARD:
_______ SAT  
Verbal status report that redundant flowpath have been aligned in accordance with step 19.
 
EVALUATORS NOTE: N/A STOP TIME:
_______ UNSAT
COMMENTS:
 
STEP 9:  REPORT TO SHIFT SU PERVISOR (EVALUATOR).
STANDARD:
Verbal status report that redundant flowpath have been aligned in accordance with step 19.  
 
EVALUATOR'S NOTE: N/A STOP TIME:          
 
COMMENTS:  
 
_______ SAT
 
_______ UNSAT
 
STOP TIME:
STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Page 7 of 10


____________________________________________________________________________________
Surry                                               2009-301                     Establish Redundant Flowpaths Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
____________________________________________________________________________________
 
Surry 2009-301 Establish Redundant Flowpaths Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task Task is to be performed in the simulator.
Task Task is to be performed in the simulator.
Perform Step 19 of 1-E-1, Loss of Reactor or Sec ondary Coolant, to establish redundant charging flowpaths.  
Perform Step 19 of 1-E-1, Loss of Reactor or Secondary Coolant, to establish redundant charging flowpaths.
 
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue.
Directions The evaluator will explain the initial conditions of t he task to be performed and will provide the initiating cue.
Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A Large Break LOCA has occurred on Unit 1.
Ensure you indicate to the evaluat or when you understand your assigned task Initial Conditions A Large Break LOCA has occurred on Unit 1.  
Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.
Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.
When you finish the actions necessary to accomplish this, please inform me.


Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
: 1. We are in procedure 1-E-1 for a loss of Reactor coolant.
Initial Conditions A Large Break LOCA has occurred on Unit 1.
Here's a copy of 1-E-1, step 19. I need you to est ablish Charging pump redundant flow paths in accordance with step 19.
Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.
Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.
When you finish the actions necessary to accomplish this, please inform me.
When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions A Large Break LOCA has occurred on Unit 1.


Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit
NUMBER                                  PROCEDURE TI TLE                                    REVISION 31 1-E-1 1-E-1                   LOSS OF REACTOR OR SECONDARY COOLANT PAGE 20 of 28 ACTION !/ EXPECTE EXPECTED D RESPONSE                          RESPONSE NOT OBTAINED
: 1. We are in procedure 1-E-1 for a loss of Reactor coolant.
Here's a copy of 1-E-1, step 19. I need you to est ablish Charging pump redundant flow paths in accordance with step 19.
When you finish the actions necessary to accomplish this, please inform me.


NUMB E R PROCEDURE TI TLE REVISION 31 1-E-1 LOSS OF R E ACTOR OR S E CONDARY COO L ANT PAGE 20 of 28 ACTION! E XPEC TE D RESPONSE R E SPONS E NOT OBTA I NED NOTE: CHG pumps shou l d be run in the follo w ing order of priority: C, B, A. The highest priority CHG pump shou l d be aligned to the normal header. 19. ESTABLISH CHG PUMP REDUNDANT FLO W PATHS: o a) Check CHG pumps -THREE RUNN IN G o b) Stop one CHG pump and put in PTL c) Open a l ternate HHSI to co l d legs: o . 1-SI-MOV-1842 d) Align one CHG pump to fto w through the normal 81 HDR by closing the associated a lt ernate discharge MOV: o 1-CH-P-1 A 1-CH-MOV-1287 A o 1-CH-P-1 B 1-CH-MOV-1287B o 1-CH-P-1C 1-CH-MOV-1287C (STEP 19 CONTINUED ON NEXT PAGE) o a) 1£ one CHG pump running, THE N GO TO Step 20. 1£ two CHG pumps running , THE N do the fo l lo w ing: o 1) Veri f y or place the non-running CHG pump in PT L. o 2) GO TO Step 19c. NUMB E R PROC E DUR E TI T L E REVIS I ON 31 1-E-1 LOSS OF R E ACTOR OR S E CONDARY COO L ANT PAG E 20 of 28 ACTION/EXPECTED RESPONSE R E SPONSE NOT OBTAINED NOTE: CHG pumps shou l d be run i n the follo w ing order of priority: C, B, A. The highest priority CHG pump shou l d be aligned to the normal header. 19. ES T ABLISH CHG PUMP REDUNDANT FLOW PATHS: o a) Check CHG pumps -THR EE RUNN I NG o b) Stop one CHG pump and put in P T L c) Open a l ternate HHSI to cold legs: o . 1-SI-MOV-1842 d) Align one CHG pump to ftow through the normal 81 HDR by clos i ng the assoc i ated alternate discharge MOV: o 1-CH-P-1A 1-CH-MOV-1287A o 1-CH-P-1 B 1-CH-MOV-1287B o 1-CH-P-1C 1-CH-MOV-1287C (STEP 19 CONTINUED ON NEXT PAGE) o a) 1£ one CHG pump runn i ng, T HEN GO TO Step 20. 1£ two CHG pumps runn i ng , THEN do the follo w ing: o 1) Veri f y or place the non-running CHG pump in PT L. o 2) GO TO Step 19c.
===RESPONSE===
NUMB E R PROCEDURE TI TLE REVISION 3 1 1-E-1 LOSS OF R E ACTOR OR S E CONDARY COO L ANT ACTION! E XPECT E D RESPONSE 19. ESTABLISH CHG PUMP REDUNDANT FLO W PATHS: (Continu ed) e) Align the other running CHG pump to ftow through the alternate SI HDR by c l os in g the associated normal discharge MOV: o l-CH-P-1 A 1-CH-MOV-1286A o l-CH-P-1 B l-CH-MO V-1286B o l-CH-P-1C l-CH-MOV-1286C f) Close the normal d i scharge MOV on the NO N-RUNN I NG CHG pump: o l-CH-P-1 A l-CH-MOV-1286A o l-CH-P-1 B l-CH-MOV-1286B o l-CH-P-1 C l-CH-MOV-1286C g) V erif y HHSI fto w through BOTH headers o l-SI-FI-1 940 o l-SI-FI-1940A o l-SI-FI-1 943 o l-SI-FI-1 943A 20. CHECK IF RCS COOL DO W N AND DEPRESSURIZATION IS REQUIRED:
NOTE:     CHG pumps shou ld be run in the following order of priority: C, B, A.
o a) RCS pressure -GR E AT ER THAN 250 PSIG [4 00 PS I G] o b) GO T O l-ES-1.2 , POST L OCA COOL DO W N AND DEPRESSURIZATION PAGE 21 of 28 R E SPONS E NOT OBTA I NED o a) 1£ LH S I pump fto w greater than 1 000 gpm , THEN GO TO Step 21. NUMB E R PROCEDURE TITLE REVISION 31 1-E-1 LOSS OF R E AC TOR OR S E CONDARY COO L ANT ACTION! E XP E CT E D RESPONSE 19. ESTABLISH CHG PUMP REDUNDANT FLO W PATHS: (Continu ed) e) Align the other running CHG pump to now through the alternate SI HDR by clos in g the assoc i ated normal discharge MOV: o 1-CH-P-1A 1-CH-MOV-1286A o 1-CH-P-1 B 1-CH-MO V-1 286B o 1-CH-P-1C 1-CH-MOV-1286C f) Close the normal d i scharge MOV on the NON-RUNN I NG CHG pump: o 1-CH-P-1 A 1-CH-MOV-1286A o 1-CH-P-1 B 1-CH-MOV-1286B o 1-CH-P-1C 1-CH-MOV-1286C g) V erif y HHSI no w through BOTH headers o 1-SI-FI-1940 o 1-SI-FI-1940A o 1-SI-F I-1 943 o 1-SI-F I-1 943A 20. CHECK IF RCS COOL DO W N AND DEPRESSURIZATION IS REQUIRED:
The highest priority CHG pump should be aligned to the normal header.
o a) RCS pressure -GR E AT ER THAN 250 PSIG [4 00 PS I G] o b) GO TO 1-ES-1.2 , POST L OCA COOL DO W N AND DEPRESSURIZ A TION PAGE 21 of 28 R E SPONS E NOT OBTAINED o a) 1£ LH S I pump no w g r eater than 1000 gpm , THEN GO T O Step 21.
header.
Surry 2009-301 Align CS iaw ECA-1.1 Page 1 of 12 U.S. Nuclear Regulatory Commission  Surry Power Station
: 19. ESTABLISH CHG PUMP REDUNDANT FLOW PATHS:
PATHS:
o a) Check CHG pumps - THR  THREEEE RUNN ING        o   a) 1£ one CHG pump runnrunning, ing, THEN GO TO Step 20.
1£ two CHG pumps running , THEN do the following :
o       1) Verify or place the non-running CHG pump in PTL.
o       2) GO TO Step 19c.19c.
o   b) Stop one CHG pump and put in PTL c) Open alternate HHSI to cold legs:
o     . 1-SI-MOV-1842 1-SI -MOV-1842 d) Align one CHG pump to ftow through the normal 81 HDR by closing the associated alternate discharge MOV:
o         1-CH-P-1 A 1-CH-P-1A     1-CH-MOV-1287A 1-CH-MOV-1287A o         1-CH-P-1 B     1-CH-MOV-1287B o         1-CH-P-1C     1-CH-MOV-1287C (STEP 19 CONTINUED ON NEXT PAGE) PAGE )


SR09301  Simulator Job Performance Measure 026A2.03 (4.1/4.4)
NUMBER                                    PROCEDURE TITLE TI TLE                              REVISION 31 31 1-E-1                      LOSS OF REACTOR OR SECONDARY COOLANT PAGE 21 of 28 ACTION ! EXPECTED RESPONSE                          RESPONSE RESPONS E NOT OBTAINED
Alternate Path
: 19. ESTABLISH CHG PUMP REDUNDANT FLOW PATHS: (Continued)
(Continued )
e) Align the other running CHG pump to nowftow through the alternate SI HDR by closing the associated normal discharge MOV:
o        1-CH-P-1A l -CH-P-1 A        1-CH-MOV-1286A 1-CH  -MOV-1286A o        1-CH-P-1 l-CH-P-1 B        1-CH-MOV-1  286B l-CH-MOV-1286B o        1-CH-P-1C l-CH-P-1C          1-CH-MOV-1286C l-CH-MOV-1286C f) Close the normal discharge MOV on the NON-RUNN ING CHG pump:
o        1-CH-P-1 l -CH-P-1 A        1-CH-MOV-1286A l -CH -MOV-1286A o        1-CH-P-1 l -CH-P-1 B        1-CH l -CH -MOV-1286B o        1-CH-P-1C l -CH-P-1 C        1-CH-MOV-1286C l -CH -MOV-1286C g) Verify HHSI now ftow through BOTH headers o        1-SI-FI-1940 l -SI -FI-1 940 o        1-SI-FI-1940A l-SI-FI-1940A o        1-SI-FI-1 l -SI -FI-1 943 o        1-SI-FI-1 l -SI -FI-1 943A
: 20. CHECK IF RCS COOL DOWN AND DEPRESSURIZATION IS REQUIRED:
o  a) RCS pressure - GREAT ER                        o  a) 1£ LH SI pump now ftow greater THAN 250 PSIG [4 00 PSIG]                            than 1000 gpm, THEN GO TO Step 21.
o  b) GO TO 1-ES-1.2, l-ES-1.2, POST LOCA COOL DOWN AND DEPRESSURIZATION


Applicant________________________________     Start Time___________________  
Surry                                              2009-301                              Align CS iaw ECA-1.1 U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure 026A2.03 (4.1/4.4)
Alternate Path Applicant________________________________                             Start Time___________________
Examiner_______________________________
Date ___________________________________                              Stop Time___________________
Title CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA-1.1 (LOSS OF EMERGENCY RECIRCULATION).
K/A: 026A2.03 Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; and (b) based on those predications, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Failure of ESF Applicability                                          Estimated Time                Actual Time RO/SRO(I)/SRO(U)                                      10 Minutes Conditions Task is to be PERFORMED in the simulator.
A LBLOCA has occurred and both LHSI pumps are inoperable.            1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1-RS-P-2B in service to 1-RS-E-1D (with service water aligned) and 1-CS-P-1A and 1B in service.
Initiating Cues 1-ECA-1.1 step 8.
Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.
Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation.
Page 1 of 12


Examiner_______________________________
Surry                                               2009-301                             Align CS iaw ECA-1.1 Tools and Equipment                                     Safety Considerations None                                                         None Simulator Setup Call up 100% power IC and initialize (or IC-316).
 
Enter the following malfunctions:
Date ___________________________________  Stop Time___________________
o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B - Trigger 4 o SI0901- LHSI PUMP SI-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI-P-1B OVERCURRENT TRIP- Trigger 1 Setup the following event trigger- Event action- rsp1b_amp>0.1 - Event 4 Set up the following switch override- MOVSW104A_OPEN- OFF - INSERT Set up the following MOV override - SWMOV105C_RACKIN - set to RACKOUT and INSERT.
 
Place the simulator in RUN and perform 1-E-0 steps, then transition to 1-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1-ECA-1.1. Do not worry about stopping unloaded EDGs in E-1.
Title CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WI TH ECA-1.1 (LOSS OF EMERGENCY RECIRCULATION).
Start 1-CS-P-1A and open 1-CS-MOV-101A/B and 1-CS-MOV-102A Ensure containment sump level is >4.
 
Initiating Cues 1-ECA-1.1, Loss of Emergency Coolant Recirculation, step 8.
K/A: 026A2.03 Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; and (b) based on those predications, use procedures to correct, control, or mitigate the consequences of those
Shift Manager direction Directions to the Applicant I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.
 
Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.
malfunctions or operations; Failure of ESF Applicability      Estimated Time Actual Time RO/SRO(I)/SRO(U)    10 Minutes                       
When you finish the actions necessary to accomplish this, please inform me.
 
Notes Page 2 of 12
Conditions
 
Task is to be PERFORMED in the simulator. A LBLOCA has occurred and both LHSI pumps are i noperable. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
 
Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are comple te which result in 1-RS-P-2B in service to 1-RS-E-1D (with service water aligned) and 1-CS-P-1A and 1B in service.
 
Initiating Cues
 
1-ECA-1.1 step 8. Shift Manager direction
 
Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.
 
Procedures
 
1-ECA-1.1, Loss of Emergency Coolant Recirculation.
 
Surry 2009-301 Align CS iaw ECA-1.1 Page 2 of 12 Tools and Equipment     Safety Considerations None       None   Simulator Setup Call up 100% power IC and initialize (or IC-316). Enter the following malfunctions:
o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B - Trigger 4 o SI0901- LHSI PUMP SI-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI-P-1B OVERCURRENT TRIP- Trigger 1 Setup the following event trigger- Event action- rsp1b_amp>0.1 - Event 4 Set up the following switch override- MOVSW104A_OPEN- OFF - INSERT Set up the following MOV override - SWMOV 105C_RACKIN - set to RACKOUT and INSERT. Place the simulator in RUN and perform 1-E-0 steps, then transition to 1-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1-ECA-1.1. Do not worry about stopping unloaded EDGs in E-1.
Start 1-CS-P-1A and open 1-CS-MOV-101A/B and 1-CS-MOV-102A Ensure containment sump level is >4'.
 
Initiating Cues 1-ECA-1.1, Loss of Emergency Coolant Recirculation, step 8. Shift Manager direction  
 
Directions to the Applicant
 
I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculat ion, and is currently at step 8. Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2009-301 Align CS iaw ECA-1.1 Page 3 of 12 PERFORMANCE CHECKLIST Notes to the Evaluator
 
Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. 


Surry                                              2009-301                                Align CS iaw ECA-1.1 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
START TIME:
STEP 1: CAUTION AND NOTE PRIOR TO STEP 8 CAUTION:
STEP 1:
Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.
_______ SAT CAUTION AND NOTE PRIOR TO STEP 8
NOTE: If CLS can NOT be reset, local break er operation will be required to   stop CS and ISRS pumps.
_______ UNSAT CAUTION: Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.
 
NOTE:         If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.
STANDARD:
STANDARD:
Acknowledges caution and note.
Acknowledges caution and note.
COMMENTS:  
COMMENTS:
 
STEP 2:
_______ SAT  
_______ SAT STEP 8a -     Check for EITHER of the following:
 
_______ UNSAT
_______ UNSAT
 
STEP 2:  STEP 8a - Check for EITHER of the following:
* Any CS pump - RUNNING OR REQUIRED OR
* Any CS pump - RUNNING OR REQUIRED OR
* RWST level - LESS THAN 20%
* RWST level - LESS THAN 20%
STANDARD:
Observes 1-CS-P-1A running and continues to substep b.
EVALUATOR'S NOTE: N/A COMMENTS:
_______ SAT
_______ UNSAT
Surry 2009-301 Align CS iaw ECA-1.1 Page 4 of 12 STEP 3:  Step 8b -  Verify CTMT sump level - GREATER THAN 4.0 ft.
STANDARD:
STANDARD:
Verifies containment sump level >4'.
Observes 1-CS-P-1A running and continues to substep b.
EVALUATOR'S NOTE: N/A
EVALUATORS NOTE: N/A COMMENTS:
Page 3 of 12


COMMENTS:  
Surry                                            2009-301                          Align CS iaw ECA-1.1 STEP 3:
_______ SAT Step 8b -    Verify CTMT sump level - GREATER THAN 4.0 ft.
_______ UNSAT STANDARD:
Verifies containment sump level >4.
EVALUATORS NOTE: N/A COMMENTS:
STEP 4:
_______ SAT Step 8c -    Verify SW aligned to at least two RS HXs
_______ UNSAT STANDARD:
Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO.
EVALUATORS NOTE: N/A COMMENTS:
Page 4 of 12


_______ SAT  
Surry                                            2009-301                            Align CS iaw ECA-1.1 STEP 5:
_______ SAT Step 8c RNO -    Align SW to at least two RS HXs.
_______ UNSAT STANDARD:
Opens 1-SW-MOV-103A- either this valve or 103B must be opened- one valve must be open as a critical step.
Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.
Opens 1-SW-MOV-103C.
Opens 1-SW-MOV-103D.
Opens 1-SW-MOV-104A - Determines that valve will not open Opens 1-SW-MOV-104B.
Opens 1-SW-MOV-104C.
Opens 1-SW-MOV-104D - This is a critical step.
Opens 1-SW-MOV-105A.
Opens 1-SW-MOV-105B.
Opens 1-SW-MOV-105C - Determines that valve will not open Opens 1-SW-MOV-105D - This is a critical step.
EVALUATORS NOTE: N/A BOOTH NOTE:
If asked:    Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A Report time compression has occurred and there are no abnormal indication on 1-SW-MOV-104A (1H1-2N-7B) supply breaker.
If asked:  Trainee may dispatch operator to investigate supply breaker for 1-SW-MOV-105C Report time compression has occurred and that the supply breaker (1H1-2N-8C) has tripped.
COMMENTS:
Page 5 of 12


_______ UNSAT
Surry                                             2009-301                             Align CS iaw ECA-1.1 STEP 6:
 
_______ SAT Step 8d -     Start RS pumps associated with aligned RS HXs
STEP 4:  Step 8c -  Verify SW aligned to at least two RS HXs STANDARD:  Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A COMMENTS: 
_______ UNSAT STANDARD:
 
Trainee starts 1-RS-P-1B (B RS HX)
_______ SAT
Trainee observes that 1-RS-P-1B tripped and continues.
 
Trainee starts 1-RS-P-2B (D RS HX) - This is a critical step.
_______ UNSAT
EVALUATORS NOTE: N/A BOOTH NOTE: If directed to investigate breaker for 1-RS-P-1B (14J4), report that breaker is tripped as indicated by a Bell Lockout.
 
COMMENTS:
Surry 2009-301 Align CS iaw ECA-1.1 Page 5 of 12 STEP 5:  Step 8c RNO -
STEP 7:
Align SW to at least two RS HXs.
_______ SAT CAUTIONS PRIOR TO STEP 9
STANDARD:  
_______ UNSAT CAUTION:
 
CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.
Opens 1-SW-MOV-103A- either this valve or 103B must be opened- one valve must be open as a critical step. Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step. Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open  Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C. Opens 1-SW-MOV-104D - This is a critical step. Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open  Opens 1-SW-MOV-105D - This is a critical step.
CS pumps taking suction from the RWST must be stopped when level decreases to 3%.
 
EVALUATOR'S NOTE:  N/A
 
BOOTH NOTE:  If asked:  Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A Report time compression has occurred and there are no
 
abnormal indication on 1-SW-MOV-104A (1H1-2N-7B) supply breaker.
If asked:  Trainee may dispatch operator to investigate supply breaker for 1-SW-MOV-105C Report time compression has occurred and that the supply breaker (1H1-2N-8C) has tripped.
 
COMMENTS:
 
_______ SAT  
 
_______ UNSAT
 
Surry 2009-301 Align CS iaw ECA-1.1 Page 6 of 12 STEP 6:  Step 8d - Start RS pumps associated with aligned RS HXs STANDARD:
Trainee starts 1-RS-P-1B ("B" RS HX) Trainee observes that 1-RS-P-1B tripped and continues. Trainee starts 1-RS-P-2B ("D" RS HX) - This is a critical step. EVALUATOR'S NOTE: N/A  
 
BOOTH NOTE: If directed to investigate breaker for 1-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.
 
COMMENTS:  
 
_______ SAT  
 
_______ UNSAT
 
STEP 7:  CAUTIONS PRIOR TO STEP 9 CAUTION:
CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%. CS pumps taking suction from the RWST must be stopped when level decreases to 3%.
STANDARD:
STANDARD:
Acknowledges cautions       EVALUATOR'S NOTE: N/A  
Acknowledges cautions EVALUATORS NOTE: N/A COMMENTS:
Page 6 of 12


COMMENTS:
Surry                                           2009-301                               Align CS iaw ECA-1.1 STEP 8:
 
_______ SAT Step 9a -  Determine number of CS pumps required:
_______ SAT
_______ UNSAT STANDARD:
 
_______ UNSAT
 
Surry 2009-301 Align CS iaw ECA-1.1 Page 7 of 12 STEP 8: Step 9a -  Determine number of CS pumps required:
STANDARD:
Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.
Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.
EVALUATOR'S CUE: If asked , there are no abnormalities noted on either containment spray pump.
EVALUATORS CUE:         If asked, there are no abnormalities noted on either containment spray pump.
 
COMMENTS:
COMMENTS:  
STEP 9:
 
_______ SAT Step 9b -  CS pumps running - EQUAL TO NUMBER REQUIRED
_______ SAT  
_______ UNSAT STANDARD:
 
Determines that 2 CS pumps are required, but only 1 currently in service.
_______ UNSAT
Goes to step 9 RNO.
 
EVALUATORS NOTE: N/A COMMENTS:
STEP 9:  Step 9b -  CS pumps running - EQUAL TO NUMBER REQUIRED STANDARD:
Page 7 of 12
Determines that 2 CS pumps are requi red, but only 1 currently in service. Goes to step 9 RNO.       EVALUATOR'S NOTE: N/A  
 
COMMENTS:  


_______ SAT
Surry                                             2009-301                             Align CS iaw ECA-1.1 STEP 10:
 
_______ SAT Step 9b RNO- Do the following:
_______ UNSAT
: 1) Manually operate CS pump(s).                                             _______ UNSAT
 
Surry 2009-301 Align CS iaw ECA-1.1 Page 8 of 12 STEP 10: Step 9b RNO- Do the following:
: 1) Manually operate CS pump(s).
: 2) Close associated CS pump discharge MOVs for stopped pump(s):
: 2) Close associated CS pump discharge MOVs for stopped pump(s):
* 1-CS-P-1A, 1-CS-M OV-101A and 1-CS-MOV-101B
* 1-CS-P-1A, 1-CS-MOV-101A and 1-CS-MOV-101B
* 1-CS-P-1B, 1-CS-M OV-101C and 1-CS-MOV-101D  
* 1-CS-P-1B, 1-CS-MOV-101C and 1-CS-MOV-101D STANDARD:
 
STANDARD:
Trainee starts 1-CS-P-1B and opens 1-CS-MOV-101C and/or 1-CS-MOV-101D-this is a critical step.
Trainee starts 1-CS-P-1B and opens 1-CS-MOV-101C and/or 1-CS-MOV-101D-this is a critical step.
EVALUATOR'S NOTE: N/A  
EVALUATORS NOTE: N/A COMMENTS:
 
STEP 11:
COMMENTS:  
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
 
_______ UNSAT STANDARD:
_______ SAT  
 
_______ UNSAT
 
STEP 11:  REPORT TO SHIFT SU PERVISOR (EVALUATOR).
STANDARD:
Verbal status report that CS and RS have been aligned in accordance with ECA-1.1 steps 8 &
Verbal status report that CS and RS have been aligned in accordance with ECA-1.1 steps 8 &
: 9. EVALUATOR'S NOTE: N/A STOP TIME:          
9.
 
EVALUATORS NOTE: N/A STOP TIME:
COMMENTS:  
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
STOP TIME:
STOP TIME:
____________________________________________________________________________________  
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  
Page 8 of 12
 
____________________________________________________________________________________  
 
____________________________________________________________________________________


Surry 2009-301 Align CS iaw ECA-1.1 9 of 12  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Surry                                             2009-301                               Align CS iaw ECA-1.1 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task Task is to be performed in the simulator.
Task Task is to be performed in the simulator.
Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.
Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.
Directions The evaluator will explain the initial conditions of t he task to be performed and will provide the initiating cue.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue.
Ensure you indicate to the evaluat or when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculat ion, has been performed up to step 8.  
Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
 
Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.
Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculat ion, and is currently at step 8.
Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.
Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.  
When you finish the actions necessary to accomplish this, please inform me.
9 of 12


Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.
Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.
When you finish the actions necessary to accomplish this, please inform me.
When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions


A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculat ion, has been performed up to step 8.  
NUMBER                                  PROCEDURE TITLE TI TLE                                REVISION 29 1-ECA-1.1                LOSS OF EMERGEN CY COOLANT RECIRCULATION PAGE 7 of 31 ACTION !/ EXPECTE D RESPONSE                        RESPONSE RESPONS E NOT OBTAINED
****************************************************
CAUTION: Operation of an OSRS pump without the associated CS pump CQuid cause cavitation as indicated by fluctuating fluctuating amperage.
****************************************************
NOTE: If CLS CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.
S.
: 8. CHECK RECIRCULATION SPRAY SYSTEM:
a) Check for EITHER of the following:              o  a) GO TO Step 10.
o        Any CS pump - RUNN ING OR REQUIRED OR o        RWST level - LESS THAN 20%
o b) Verify CTMT sump leve l - GREATER                  b) Do the following:
THAN 4.0 ft o                            IE NOT, THEN reset
: 1) Ve rify CLS reset. If both trains of CLS.
o      2) Stop stop RS pumps.
o      3) WHEN sump level greater than 4.0 ftft,,
THEN do Steps Sc 8c and 8d Sd..
o      4) GO TO Step 9.
o c) Verify SW aligned to at least two RS HXs        o  c) Align SW to at least two RS HXs.
o d) Start RS pumps associated with aligned RS HXs


Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculat ion, and is currently at step 8.
NUMBER                                PROCEDURE TI   TITLE TLE                               REVISION 29 1-ECA-1.1               LOSS OF EMERGEN CY COO COOLANT LANT RECIRCULATION PAGE 8 of 31 ACTION ! EXPECTED RESPONSE                         RESPONSE NOT OBTAINED
Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.
* * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
 
When you finish the actions necessary to accomplish this, please inform me.
 
NUMB E R PROCEDURE TI TLE REVISION 29 1-E CA-1.1 LOSS OF E MERG EN CY COO L ANT RECIRCULATION PAGE 7 o f 31 ACTION! E XP E C TE D RESPONSE R E SPONS E NOT OBTA I NED ****************************************************
CAUTION: Ope r ation of an OSRS pump w ithout the associated CS pump CQu i d cause cavitation as indicated by fluctuating ampe r age. ****************************************************
NOTE: If C L S can NOT be reset, loca l b reaker operation w ill be required to stop CS and I SRS pumps. S. CHECK RECIRCULATION SPRAY SYSTEM: a) Check for EITHER o f the follo w ing: o Any CS pump -RUNN ING OR REQUIRED OR o R W S T le vel -LESS TH AN 20% o b) Ve r i f y CTMT sump le vel -GR E AT ER THAN 4.0 ft o c) Ve r i fy S W aligned to at least two RS HXs o d) Start RS pumps assoc i ated w ith a lig ned RS HXs o a) GO TO Step 10. b) Do the follo w ing: o 1) Ve rify C L S reset. If NOT, THEN reset both trains of CLS. o 2) Stop RS pumps. o 3) W HEN sump leve l greater than 4.0 ft, THEN do Steps Sc and Sd. o 4) GO TO Step 9. o c) Align SW to at least two RS HXs. NUMB ER PROCEDURE TITLE REVISION 29 1-ECA-1.1 LOSS OF E MERG EN CY COO L ANT RECIRCULATION PAGE 7 of 31 ACTION/E XPEC TE D RESPONSE RESPONSE NOT OBTAINED ****************************************************
CAUTION: Operat i on of an OSRS pump w ithout the associated CS pump CQuid cause cavitat i on as indicated by fluctuat in g ampe r age. ****************************************************
NOTE: If CLS can NOT be reset, loca l breaker operation w ill be required to stop CS and I SRS pumps. 8. CHECK RECIRCULATION SPRAY SYSTEM: a) Check for EITHER o f the follo w ing: o Any CS pump -RUNN ING OR REQUIRED OR o R W ST le vel -LESS TH AN 20% o b) V erify CTMT sump le ve l -GR E AT ER THAN 4.0 ft o c) Verify S W aligned to at least two RS HXs o d) Start RS pumps associated w ith aligned RS HXs o a) GO TO Step 10. b) Do the follo w ing: o 1) Ve rify C L S r eset. IE NOT, THEN reset both trains of CLS. o 2) stop RS pumps. o 3) W HEN sump leve l greater than 4.0 ft , THEN do Steps 8c and 8d. o 4) GO TO Step 9. o c) Align S W to at least tw o RS HXs.
NUMBER PROCEDURE TI TLE REVISION 29 1-E CA-1.1 LOSS OF E MERG EN CY COO L ANT RECIRCULATION PAGE 8 o f 31 ACTION! E XPECTED RESPONSE RESPONSE NOT OBTA I NED * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
* CAUTION:
* CAUTION:
* CHG and LH SI pumps taking suction from the R W S T must be stopped w hen le vel decreases to 6%. CS pumps taking suction from the R W S T must be stopped w hen le vel dec rea ses to 3%. * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
* CHG and LH SI pumps taking suction from the RWST must be stopped when level decreases to 6%.
* 9. DETER M I N E CS REQUIREMENTS:
6% .
o a) De t ermine number o f CS pumps required:
CS pumps taking suction from the RWST must be stopped when level decreases decrea ses to 3%.
CONTAINM ENT RS PUMPS CS PUMPS PRESSURE RUN N I NG R E QU IRE D GR E ATER TH AN 2 60 PSI A --------B ET W EE N 1 4 PS I A FE W ER TH AN 2 2 AND 60 PS I A 20R MOR E 1 LESS THAN 0 1 4 PSIA --------o b) CS pumps runn in g -E QUAL TO N UMB ER R E QU IRE D b) Do the follo w ing: o 1) Ma nuall y operate CS pump (s). 2) C l ose associated CS pump discharge MOVs f or stopped pump (s): o 1-CS-P-1A,1-CS-MO V-1 0 1 A and 1-CS-MOV-1 0 1B o 1-CS-P-1B ,1-CS-MO V-1 0 1 C and 1-CS-MOV-1 01D NUMB ER PROCEDURE TITLE REVISION 29 1-ECA-1.1 LOSS OF EMER G EN CY COO L ANT RECIRCULATION PAGE 8 of 31 ACTION! E XP E CTED RESPONSE RESPONSE NOT OBTAINED * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * *
* * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * ** *
* * * * * * * * * * ** * * * **
: 9. DETERMINE CS REQUIREMENTS:
* CAUTION:
o a) Determine number of CS pumps required:
* CHG and LH SI pumps taking suction from the RWST must be stopped when le vel decreases to 6%. CS pumps taking suction from the R W S T must be stopped w hen l evel decreases to 3%. * * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * *
CONTAINMENT            RS PUMPS           CS PUMPS PRESSURE               RUNNING RUN   NING        REQU IRED GREATER THAN                --------                 2 60 PSI A BETWEEN 14 PSIA          FEW ER THAN 2 FEWER                        2 AND 60 PSIA            20RMORE 20R     MORE                1 LESS THAN
* * * * * * * * * * ** * * * **
                                                  --------                 0 14 PSIA o b) CS pumps runn ing - EQUAL TO NUMBER              b) Do the following:
* 9. DETERMINE CS REQUIREMENTS:
IRED REQU IRE  D o     1) Manually operate CS pump(s).
o a) Determine number of CS pumps required:
: 2) Close associated CS pump discharge MOVs for stopped pump(s):
CONTAINM ENT RS PUMPS CS PUMPS PRESSURE RUNNING R E QU IRED GR E ATER TH AN 2 60 PSI A --------BETWEEN 1 4 PS I A FE WER TH AN 2 2 AND 60 PS I A 20RMORE 1 LESS THAN 0 14 PSIA --------o b) CS pumps runn ing -E QUAL TO NUMBER R E QU IRED b) Do the follo w ing: o 1) Manually operate CS pump (s). 2) C l ose associated CS pump discharge MOVs f or stopped pump (s): o 1-CS-P-1A,1-CS-MOV-101A and 1-CS-M OV-1 0 1B o 1-CS-P-1B,1-CS-MOV-101C and 1-CS-MOV-1 01D}}
o         1-CS-P-1A,1-CS-MOV-101A 1-CS-P-1A,1-CS-MOV-1 01A and 1-CS-M  OV-101B 1-CS-MOV-101B o         1-CS-P-1B,1-CS-MOV-101C 1-CS-P-1B,1 -CS-MOV-1 0 1C and 1-CS-MOV-101D}}

Revision as of 01:24, 14 November 2019

Initial Exam 280, 281/2009-301 Final SIM/In-Plant JPMs
ML092920163
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/17/2009
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
50-280/09-301, 50-281/09-301
Download: ML092920163 (57)


Text

U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Job Performance Measure 004A2.11 Applicant________________________________ Start Time___________________

Examiner_______________________________

Date ___________________________________ Stop Time___________________

Title INCREASE RCS BORON CONCENTRATION 500 PPM IN ACCORDANCE WITH AP-40.00.

K/A: 004A2.11 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of IAS.

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 15 Minutes Conditions Task is to be SIMULATED in the plant.

A sustained loss of station instrument air is in progress and the team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

It is desired to increase RCS boron concentration 500 ppm in accordance with step 17.

Standards Candidate correctly manipulates valves as required by 0-AP-40.00, step 17, to allow for boration of the RCS.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.

The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

You are to perform steps 17a sub steps 1 and 2.

It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)

When you complete these actions, inform the 3rd license operator to perform subsequent actions.

When you finish the actions necessary to accomplish this, please inform me.

004A2.11 SR09301 1 of 9

Terminating Cues Completion of 0-AP-40.00, Non-Recoverable Loss of Instrument Air, step 17.

Procedures 0-AP-40.00, Non-Recoverable Loss of Instrument Air (Revision 26).

Tools and Equipment Safety Considerations None Standard Personal Safety Equipment 004A2.11 SR09301 2 of 9

Initiating Cues A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.

Notes to the Evaluator.

Task briefing should occur in the pre-determined location.

This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Task critical elements are bolded and noted by the words Critical Step at the end of the step.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.

The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

You are to perform steps 17a sub steps 1 and 2.

It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)

When you complete these actions, inform the 3rd license operator to perform subsequent actions.

When you finish the actions necessary to accomplish this, please inform me.

Notes Expected RWP to be used for 08.1 SROU Class is -

RWP 0-0001 Dose ALARM - 5 mr Dose RATE ALARM- 20 mr/hr 004A2.11 SR09301 3 of 9

PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted by the words Critical Step at the end of the step.

START TIME:

STEP 1:

_______ SAT CAUTIONS AND NOTE PRIOR TO STEP 17.

_______ UNSAT STANDARD:

Reads caution regarding RWST overflow.

Reads caution regarding minimum charging flow.

Reads note regarding pressurizer level control EVALUATORS NOTE:

If asked: No personnel are working in the safeguards valve pit area.

COMMENTS:

004A2.11 SR09301 4 of 9

STEP 2:

_______ SAT STEP 17a- INCREASE INITIAL RCS BORON 500 PPM:

_______ UNSAT a) Align Charging Line Isolation valves:

1) Verify closed or close ( )-CH-304, Chg Hdr FCV-1122 Outlet Isol
2) Throttle ( )-CH-305, Chg Hdr FCV-1122 Byp, to limit charging flow STANDARD:

Proceeds to aux building basement, unit one side, locates and CLOSES 1-CH-304. This is a critical step.

Locates 1-CH-305 and throttles valve 1/2 turn open.

Directs the 3rd RO to perform substep 3.

EVALUATORS NOTE:

1-CH-304 will be found open- report initial valve position as it appears Candidate will open 1-CH-305 only 1/2 turn. When valve is being opened, cue operator that flow noise can be heard.

EVALUATORS CUES:

When candidate reports to 3rd license of step completion, report that while attempting to open 1-CH-MOV-1350 in accordance with step 17b, the valve failed to respond and you are to locally open 1-CH-228.

COMMENTS:

STEP 3:

_______ SAT Step 17b RNO- Locally open: 1-CH-228

_______ UNSAT STANDARD:

Candidate proceeds to unit one side of the boric acid flats (13 elevation of Aux Building) and locates 1-CH-228.

Locally opens 1-CH-228. This is a critical step.

EVALUATORS NOTE: N/A EVALUATORS CUES:

When 1-CH-228 is simulated open, report that task is complete and leave the boric acid flats (ALARA).

COMMENTS:

004A2.11 SR09301 5 of 9

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

004A2.11 SR09301 6 of 9

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be SIMULATED in the plant.

Increase RCS boron concentration 500 ppm in accordance with 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.

The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

You are to perform steps 17a sub steps 1 and 2.

It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)

When you complete these actions, inform the 3rd license operator to perform subsequent actions.

When you finish the actions necessary to accomplish this, please inform me.

004A2.11 SR09301 7 of 9

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A simulated loss of instrument air has occurred and it is desired to increase RCS boron concentration 500 ppm.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Nuclear Shift Manager. Both units are currently experiencing a complete loss of instrument air.

The team has reached step 17 of 0-AP-40.00, Non-Recoverable Loss of Instrument Air.

You are to perform steps 17a sub steps 1 and 2.

It is desired to throttle 1-CH-305 a half turn open. (1/2 turn open from full closed)

When you complete these actions, inform the 3rd license operator to perform subsequent actions.

When you finish the actions necessary to accomplish this, please inform me.

NUMBER PROCEDURE TI TLE REVIS REV ISION ION 26 O-AP-40.00 NON-RECOVERABLE NON -RECOVERABLE LOSS OF INSTRUMENT AIR PAGE 11 of 25 ACTION !/ EXPECTED RESPONSE RESPONS E NOT OBTAINED

  • * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
  • CAUTION:
  • Keep personnel personnel clear of safeguards va lve pit. The RWST may overflow during increase of boron flow, if letdown letdown is aligned to RWST.

To obtain proper CSD Boron concentration in in two hours , a minimum flow of 22 GPM is required.

requ ired .

  • * * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * **
  • * * ** * * * * * **
  • * *.

NOTE: Cooldown of ReS may be necessary to control pressurizer level level increase until until a letdown flow path path is establi esta bli shed.

17. INCREAS INCREASE E INITIAL IN ITIAL RCS BORON 500 PPM:

a) Align Charging Line Isolation va lves:

o 1) Verify closed or close ( )-CH -304 ,

Chg Hdr FCV-1122 Outlet 1501 1501 o 2) Throttle ( )-CH-305,

)-CH -305, Chg Hdr FCV-1 FCV-1122 Byp, to limit charging 122 Byp, flow ftow o 3) Verify open or open ( )-CH-MOV-(

)-CH-MOV- ( )289A and B b) Open EMERGENCY BORATE valve a) Locally open:

o . ()-CH-MOV-( )350 0 ( )-CH -MOV-( )350 OR 0 * ()-CH-228 oo c) Verify Verify boric acid transfer pump running in in 0 b) Manually Manually start boric acid transfer pump in in slow speed slow speed.

o d) Adjust Adju st charging cha rging flow to match boric acid ac id ftow o e) Continue boration for minimum of two hours

U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Job Performance Measure 076A2.01 (3.5/3.7)

Applicant________________________________ Start Time___________________

Examiner_______________________________

Date ___________________________________ Stop Time___________________

Title ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 15 Minutes Conditions Task is to be SIMULATED in the plant.

Any plant mode/condition where a large SW leak in #3 MER has occurred.

Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0-AP-13.00 steps 36 and 37.

Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 36.

Shift Manager direction.

Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 37 completed.

Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding.

076A2.01 SR09301 1 of 10

Tools and Equipment Safety Considerations None Standard Personal Safety Equipment Confined Space Entry Requirements Notes to the Evaluator.

Task briefing should occur in the pre-determined location.

This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Task critical elements are bolded and noted by the words Critical Step at the end of the step.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Shift Manager. There is a major Service Water leak in #3 MER.

Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, Steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.

1-SW-P-10B and 2-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

When you finish the actions necessary to accomplish this, please inform me.

Notes 076A2.01 SR09301 2 of 10

PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted by the words Critical Step at the end of the step.

START TIME:

STEP 1:

_______ SAT Step 36a- ISOLATE SW TO MER 3:

_______ UNSAT a) Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2-FW-E-2A)

STANDARD:

(a) Locates lighting panel 2T3 (located north of 2-FW-E-2A).

(b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.

EVALUATORS NOTE:

If asked: No personnel are working in the safeguards valve pit area.

COMMENTS:

STEP 2:

_______ SAT STEP 36b- Verify open or open 1-SW-500, SW Header Crosstie (MER 4)

_______ UNSAT STANDARD:

(a) Proceeds to #4 MER.

(b) Locates manual valve 1-SW-500 (halfway across room under smoke detector).

(c) Pulls pin from handwheel actuator.

(d) Opens or verifies open 1-SW-500 by rotating valve handwheel in the counter clockwise direction- This is a critical step.

Evaluators Cues Tell operator: Actual valve position in plant may be open or closed. Provide appropriate cue based on initial valve position.

COMMENTS:

076A2.01 SR09301 3 of 10

STEP 3:

_______ SAT Step 36c- Close 2-SW-476, Water Box 2C Isol (MER 4)

_______ UNSAT STANDARD:

(a) Locates 2-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side.

(b) Attempts to close 2-SW-476 by removing the locking pin and rotating the handwheel clockwise.

(c) Recognizes that 2-SW-476 will not close and transitions to step 35b RNO column.

Evaluators Cues Tell operator: As operator attempts to close valve, the handwheel will not move.

COMMENTS:

076A2.01 SR09301 4 of 10

STEP 4:

_______ SAT Step 36c RNO-Do the following: _______ UNSAT

1) Verify open or open 2-SW-533.
2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit.

STANDARD:

(a) Verifies or opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction- this is a critical step.

(b) Proceeds to Unit 2 BC HX SW MOV pit.

(c) Locates manual valve 2-SW-474.

(d) Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction- this is a critical step.

Evaluators Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant.

If asked: After trainee identifies 2-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.

If asked: Confined Space meter obtained and Security notified for entry.

Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT), the evaluator can then state the label reads 2-SW-474. The trainee can describe actions to complete valve manipulation from above.

Safety concern: The valve pits have been classified as confined spaces. Do not allow the trainee to enter the valve pits. The trainee should mention that the valve pits are confined spaces and indicate that additional actions are required to enter this space. If the trainee does not mention the confined space aspect, a follow-up question should be asked.

Confined space gas sampler is maintained in the unit two PCS room on a shelf above the I&C workstation or they can be obtained from the tool room.

Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security must be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s) - utilize hand crank to raise grating access door.

COMMENTS:

076A2.01 SR09301 5 of 10

STEP 5:

_______ SAT Step 36d- Close 2-SW-478, SW Header Crosstie. (MER 4)

_______ UNSAT STANDARD:

(a) Locates 2-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side).

(b) Pulls pin from handwheel actuator.

(c) Closes or verifies closed 1-SW-478 by rotating valve handwheel in the clockwise direction- This is a critical step.

Evaluators Cues Tell operator: Provide appropriate cue for valve operation based on actual in plant valve position.

Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads 2-SW-478 if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.

.

COMMENTS:

STEP 6:

_______ SAT Step 37- CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2-PL-LI-201 -

DECREASING _______ UNSAT STANDARD:

(a) Locates MER 3 level gauge 2-PL-LI-201 in MER 4.

(b) Checks that level in MER 3 is decreasing.

Evaluators Cues Tell operator: After the operator locates MER 3 level gauge, tell him the level is 50 H 2 O and slowly decreasing.

COMMENTS:

076A2.01 SR09301 6 of 10

STEP 7:

_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).

_______ UNSAT STANDARD:

Verbal status report that steps 36 and 37 of 1-AP-13.00 are complete.

EVALUATORS NOTE: N/A STOP TIME:

COMMENTS:

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

076A2.01 SR09301 7 of 10

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be SIMULATED in the plant.

Any plant mode/condition where a large SW leak in #3 MER has occurred.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Shift Manager. There is a major Service Water leak in #3 MER.

Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.

1-SW-P-10B and 2-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

When you finish the actions necessary to accomplish this, please inform me.

076A2.01 SR09301 8 of 10

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Flooding is ongoing in #3 MER and the team has reached step 36 of 0-AP-13.00, Turbine Building or #3 MER Flooding.

Initiating Cues This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

I am the Shift Manager. There is a major Service Water leak in #3 MER.

Here is a copy of 0-AP-13.00, Turbine Building or #3 MER Flooding, steps 36 and 37. I need you to isolate Service Water to #3 MER in accordance with Steps 36 and 37.

1-SW-P-10B and 2-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

When you finish the actions necessary to accomplish this, please inform me.

NUMBER PROCEDURE PROC EDURE TI TLE REVISION REVISION 20 O-AP-13.00 O-AP-1 3 .00 TURB INE BUILDING BUILDIN G OR MER 3 FLOODING PAGE PAG E 150f1 8 150f18 ACTION ! EXPECTE D RESPONSE ACTION! RESPONSE RESPONS E NOT OBTAINED 36.

36. ISOLATE SW TO MER 3: 3:

0 a) FaiI FaiI1-SW-263 1-SW-263 closed by opening Circuit 8 on Lighting Panel Pane l 2T3 (located north of 2-FW-E-2A) 0 b) Verify open cropen oropen 1-SW-500, 1-SW-500 , SW Header Crosstie Cross tie (MER 4) 0 c) Close 2-SW-476, Water Box 2C Isol c) Do the following:

(MER 4 4))

0 1) Verify open or open 2-SW-533.

0 2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit.

0 d) Close 2-SW-478, SW Header Crosstie.

(MER 4)4)

37. CHECK WATER LEVEL IN MER 3 ON ON MER 4 Do the foll following:

owi ng:

GAUGE 2-PL-Ll-201 2-PL-L1 -20 1 - DECREASING DECREAS ING a) Secure CHG Pump SW Pumps:

0

  • 1-SW-P-10A 0
  • 2-SW-P-10A 0 b) Close 1-SW-499, WaterWate r Box 1D Isol.

0 c) Close 1-SW-500, SW Header Crosstie.

38.

38. VERI VERIFYFY RUNN RUNNING ING AN MCR CHILLER IN Do the following:

foll owi ng:

MER 5 lAW 0-OP-VS-006, 0-OP-VS-006 , CONTROL ROOM AND RELAY ROOM VENTILATION SYSTE M: 0 a) Start start 1-VS-E 1-VS-E-4D-4D or 1-VS-E-4 1-VS-E-4E.

E.

0 1-VS-E-4D 0 b) J£ an MCR Chiller can NOT be started ,

0 . 1-VS-E-4E TH THENEN initiate 0-AP-13.02, 0-AP-13.02, LOSS OF ESGR COO LI NG COOLING

Surry 2009-301 Load #3 EDG on 1J bus U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure EPE055A1.06 Applicant________________________________ Start Time___________________

Examiner_______________________________

Date ___________________________________ Stop Time___________________

Title RESPOND TO #3 EDG FAILURE TO LOAD IAW AP-17.05 K/A: EPE055EA1.06 Restoration of power with on ED/G (4.1/4.5)

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes Conditions Task is to be PERFORMED in the simulator.

A loss of A RSST has occurred and #3 EDG failed to load.

Standards

  1. 3 EDG loaded onto the 1J bus in accordance with 0-AP-17.05, EDG 3 - Emergency Operations.

Initiating Cues 0-AP-10.07, Loss of Unit One Power, attachment 1.

Nuclear Shift Manager direction.

Terminating Cues 1J bus re-energized from #3 EDG. (Step 4 of attachment 2 will re-energize the bus).

Procedures 0-AP-17.05, EDG 3 - Emergency Operations Tools and Equipment Safety Considerations None None Page 1 of 15

Surry 2009-301 Load #3 EDG on 1J bus Simulator Setup Recall IC-1 and initialize (or IC-317).

Enter the following malfunctions and place on Trigger 1 o EL0501 (Loss of A RSST) o EL1102 (Failure to start #3 EDG)

Initiate Trigger 1. Place the #3 EDG in EXERCISE.

Delete malfunction EL1102.

Using XtremeView EDG 3 ECC, silence and reset local alarms.

Place Simulator in FREEZE.

Unit 2 manipulations may be controlled from a MONITOR screen (lcjpm5506.mon)

Initiating Cues 0-AP-10.07, Loss of Unit One Power, attachment 1.

Nuclear Shift Manager direction.

Directions to the Applicant I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.

Maintenance has identified and corrected the problem.

Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.

Maintenance personnel are standing by to assist as required.

When you finish the actions necessary to accomplish this, please inform me.

Notes Page 2 of 15

Surry 2009-301 Load #3 EDG on 1J bus PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

STEP 1:

_______ SAT CAUTIONS PRIOR TO STEP 1

_______ UNSAT STANDARD:

a) Reads caution that EDG should not run unloaded for >10 minutes if the associated emergency bus is deenergized.

b) Reads caution that the cooldown cycle should complete before initiating a start sequence on the EDG.

c) Reads caution that the shift supervisor should determine bus priority for #3 EDG.

d) Reads caution regarding #3 EDG output breaker permissive.

UNIT TWO CUE: If asked, 2J bus is energized by offsite power.

COMMENTS:

STEP 2:

_______ SAT STEP 1 - ASK ELECTRICAL AND MECHANICAL DEPARTMENTS TO PROVIDE ASSISTANCE. _______ UNSAT STANDARD:

Asks Shift Manager for Maintenance support.

EVALUATORS NOTE: N/A COMMENTS:

Page 3 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 3:

_______ SAT Step 2 - CHECK EDG 3 - WILL BE ALIGNED TO UNIT 1

_______ UNSAT STANDARD:

Recalls from initial direction that #3 EDG desired to be loaded on Unit 1 EVALUATORS NOTE:

If asked: It is desired to load #3 EDG on 1J bus.

COMMENTS:

STEP 4:

_______ SAT Step 3 - COMMIT EDG 3 TO UNIT 1:

a) Place the UNIT 2 PNL 3-2 SWITCH 43-15J3 IN BYP COMMITS NO. 3 EDG _______ UNSAT TO UNIT 1 in BYP- this is a critical step.

b) Place Emergency Supply Breaker 25J3 in PTL - this is critical step.

STANDARD:

Directs Unit Two to perform the two actions.

EVALUATORS NOTE: N/A BOOTH NOTE:

When the operator requests the bypass switch:

set u2_eg3_bypass = TRUE Report it is in bypass When the operator requests 25J3 in PTL:

Set ed25j3_lock = TRUE.

Report 25J3 is in PTL.

COMMENTS:

Page 4 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 5:

_______ SAT NOTE PRIOR TO STEP 4

_______ UNSAT STANDARD:

Reads note regarding effects of a START FAILURE on EDG operation.

EVALUATORS CUE: If asked, a start failure did not previously occur.

COMMENTS:

STEP 6:

_______ SAT Step 4 - CHECK ANNUNCIATOR VSP-B5, EMERG GEN 3 TRBL - NOT LIT

_______ UNSAT STANDARD:

Verifies annunciator VSP-B5 NOT LIT.

EVALUATORS NOTE: N/A COMMENTS:

STEP 7:

_______ SAT Step 5 - VERIFY AUXILIARY TRIP RELAY - RESET:

Amber light on Unit 1 EDG 3 Control Panel - NOT LIT _______ UNSAT STANDARD:

Verifies amber light on Unit One EDG 3 control panel NOT LIT.

EVALUATORS NOTE: N/A COMMENTS:

Page 5 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 8:

_______ SAT Step 6 - CHECK EDG - RUNNING

_______ UNSAT STANDARD:

Verifies EDG NOT running by observing engine speed indicator at 0 (zero) rpm.

Performs RNO action and GOES TO ATTACHMENT 2 EVALUATORS NOTE: N/A COMMENTS:

STEP 9:

_______ SAT - Step 1 - Place AUTO-EXERCISE EMERG GEN 3 switch to EXERCISE.

_______ UNSAT STANDARD:

Identifies AUTO/EXERCISE switch and verifies position to be in EXERCISE EVALUATORS NOTE: N/A COMMENTS:

STEP 10:

_______ SAT Attachment 2 - Step 2- IF ( )J Bus de-energized, THEN strip loads IAW Attachment 3 (1J Bus) or Attachment 4 (2J Bus). _______ UNSAT STANDARD:

Verifies 1J bus deenergized by observing bus 1J voltmeter at 0 (zero) volts.

GOES TO ATTACHMENT 3 EVALUATORS NOTE: N/A COMMENTS:

Page 6 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 11:

_______ SAT - Step 1- To strip the 1J Bus, place the following control switches in PULL-TO-LOCK. _______ UNSAT 1-SI-P-1B (14J3) 1-CS-P-1B (14J5) 1-RS-P-1B (14J4) 1-RS-P-2B (14J8) 1-VS-F-1B (14J7)

PRZR Heater Group A (14J9) 1-VS-F-58B, if powered from ALTERNATE source, 14J1-3 1-CH-P-1B (15J5) 1-CH-P-1C (15J2, ALT) 1-FW-P-3B (15J4)

STANDARD:

Places the following components in PTL (the following are critical steps):

1-SI-P-1B (14J3) 1-CS-P-1B (14J5) 1-RS-P-1B (14J4) 1-RS-P-2B (14J8) 1-VS-F-1B (14J7)

PRZR Heater Group A (14J9) 1-CH-P-1B (15J5) 1-FW-P-3B (15J4)

EVALUATORS NOTE:

1-VS-F-58B will be powered from the normal source and therefore should NOT be placed in PTL 1-CH-P-1C (15J2- ALT) is maintained in PTL - no action will be required.

COMMENTS:

Page 7 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 12:

_______ SAT - Step 2- Verify breakers open by checking breaker position indicating lights - RED LIGHTS NOT LIT _______ UNSAT 1-CS-P-1B (14J5) 1-RS-P-1B (14J4)

STANDARD:

Verifies the red lights are extinguished for both components.

EVALUATORS NOTE: N/A COMMENTS:

STEP 13:

_______ SAT - Step 3- Verify breaker open by checking breaker position indicating light -

RED LIGHT NOT LIT _______ UNSAT 1-FW-P-3B (15J4)

STANDARD:

Verifies the red lights are extinguished for 1-FW-P-3B.

EVALUATORS NOTE: N/A COMMENTS:

STEP 14:

_______ SAT - Step 4- Verify open or open 15J8, 1J Bus Normal Supply Breaker.

_______ UNSAT STANDARD:

Verifies breaker 15J8 open by observing Green and Amber lights lit EVALUATORS NOTE:

Candidate may elect to green flag control switch COMMENTS:

Page 8 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 15:

_______ SAT - Step 4- Verify open or locally open 15J9, 1J Stub Bus Supply Breaker.

_______ UNSAT STANDARD:

Checks breaker 15J9 open by any of the following means:

o Checks breaker position on PCS o Dispatches operator to locally verify breaker position Returns to ATTACHMENT 2 step 3.

EVALUATORS NOTE: N/A BOOTH OPERATOR:

If dispatched to locally verify 15J9 open, report time compression has occurred and that breaker 15J9 is OPEN.

COMMENTS:

STEP 16:

_______ SAT - Step 3- Verify the Load Limit Control on the UG-8 Governor is at the maximum clockwise position, which is past the 10 mark. _______ UNSAT STANDARD:

Dispatches operator to locally verify position of the Load Limit Control Knob EVALUATORS NOTE: N/A BOOTH OPERATOR:

If dispatched to locally verify load limit control knob position, report that time compression has occurred and that the load limit control knob is in the fully clockwise position, which is past the 10 mark.

COMMENTS:

Page 9 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 17:

_______ SAT - Step 4- Press EMERG GEN NO. 3 ENGINE START pushbutton.

_______ UNSAT STANDARD:

Depresses the #3 EDG engine start button (critical step)

EVALUATORS NOTE: N/A COMMENTS:

STEP 18:

_______ SAT - Step 5-

_______ UNSAT IF engine has NOT started, THEN GO TO Step 6 of this Attachment.

IF engine has started, THEN do the following:

a. Verify speed at approximately 900 RPM. IF NOT at 900 RPM, THEN adjust speed using EMERG GEN NO 3 SPEED ADJ control switch.
b. Place AUTO-EXERCISE EMERG GEN 3 switch to AUTO.
c. RETURN TO procedure Step 8.

STANDARD:

Verifies engine started by observing engine speed at approximately 900 rpm.

Places AUTO-EXERCISE switch to AUTO (Critical Step)

Returns to procedure step 8.

EVALUATORS NOTE:

Candidate may fine tune engine RPM depending on individuals interpretation of approximately.

When placed in AUTO, the EDG will assume 1J bus loads. Candidate could report JPM complete at this point. This is acceptable.

COMMENTS:

Page 10 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 19:

_______ SAT Note - the candidate should now be in the body of the procedure at step 8

_______ UNSAT Step 8- CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POWER STANDARD:

Identifies that both J busses are NOT supplied by offsite power by noting breaker 15J3 closed.

Goes to RNO and then to step 10.

EVALUATORS NOTE: N/A COMMENTS:

STEP 20:

_______ SAT NOTES PRIOR TO STEP 10

_______ UNSAT STANDARD:

Reads note regarding consequence of 1B DC bus loss on EDG loading.

Reads note regarding closing permissives on EDG output breaker.

EVALUATORS NOTE: N/A COMMENTS:

Page 11 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 21:

_______ SAT Step 10- CHECK EDG 3 - SUPPLYING J BUS 15J3 - CLOSED _______ UNSAT OR 25J3 - CLOSED STANDARD:

Verifies EDG supplying 1J bus by verifying breaker 15J3 closed.

EVALUATORS NOTE: N/A COMMENTS:

STEP 22:

_______ SAT NOTES PRIOR TO STEP 11

_______ UNSAT STANDARD:

Reads note regarding approximate power consumed by various emergency bus loads.

Reads note regarding power supply to the RSST.

Reads note regarding EDG MCC power verification.

EVALUATORS NOTE: N/A COMMENTS:

STEP 23:

_______ SAT Step 11- LOAD ( )J BUS IAW SHIFT SUPERVISION DIRECTION

_______ UNSAT STANDARD:

Reports to shift supervisor that EDG is ready for loading.

EVALUATORS NOTE: N/A COMMENTS:

Page 12 of 15

Surry 2009-301 Load #3 EDG on 1J bus STEP 24:

_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).

_______ UNSAT STANDARD:

Verbal status report that #3 EDG is loaded onto 1J emergency bus.

EVALUATORS NOTE: N/A STOP TIME:

COMMENTS:

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Page 13 of 15

Surry 2009-301 Load #3 EDG on 1J bus Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Perform Steps of 0-AP-17.05, EDG #3 - Emergency Operations, to energize 1J emergency bus.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions A RSST has been lost and #3 EDG failed to assume associated loads.

Initiating Cues I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.

Maintenance has identified and corrected the problem.

Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.

Maintenance personnel are standing by to assist as required.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A RSST has been lost and #3 EDG failed to assume associated loads.

Initiating Cues I am the Shift Manager and you are the 3RD license. A loss of the A RSST has occurred and the 1J bus is de-energized because #3 EDG failed to load. The #3 EDG has been stopped in accordance with AP-10.07.

Maintenance has identified and corrected the problem.

Here is a copy of AP-17.05. I need you to load #3 EDG onto the 1J bus in accordance with AP-17.05.

Maintenance personnel are standing by to assist as required.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2009-301 Establish Redundant Flowpaths U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure 006A4.07 (4.4/4.4)

Applicant________________________________ Start Time___________________

Examiner_______________________________

Date ___________________________________ Stop Time___________________

Title ESTABLISH CHG PUMP REDUNDANT FLOW PATHS K/A: 006A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves (4.4/4.4)

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes Conditions Task is to be PERFORMED in the simulator.

A SBLOCA has occurred. 1-E-1 has been performed up to the point where redundant Chg/SI flow-paths are being established.

Standards 1-E-1, Loss of Reactor or Secondary Coolant, step 19 complete with one charging pump flowing on the normal SI header, one charging pump flowing on the alternate header, and the remaining charging pump secured with one discharge valve closed.

Initiating Cues 1-E-1, Loss of Reactor or Secondary Coolant, step 19.

Shift Manager direction Terminating Cues 1-E-1, step 19 completed Procedures 0-AP-17.05, EDG 3 - Emergency Operations Tools and Equipment Safety Considerations Page 1 of 10

Surry 2009-301 Establish Redundant Flowpaths None None Page 2 of 10

Surry 2009-301 Establish Redundant Flowpaths Simulator Setup Call up 100% power IC and initialize- or IC-315.

Enter malfunction for RCS non-isolable break (RC04 to 90% degradation).

Perform 1-AP-16.00, 1-E-0 (do not stop 3rd charging pump), and 1-E-1 up to step 19. Secure RCPs at 30 degrees subcooling and close mini-flow recircs.

Initiating Cues 1-E-1, Loss of Reactor or Secondary Coolant, step 19.

Shift Manager direction Directions to the Applicant I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.

Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.

When you finish the actions necessary to accomplish this, please inform me.

Notes Page 3 of 10

Surry 2009-301 Establish Redundant Flowpaths PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

Evaluators note- this document represents the optimal charging pump configuration.

Critical actions are considered SAT if, at task completion: one charging pump is aligned _______ SAT to the normal header, one pump aligned to the alternate header, and the 3rd charging pump is secured with one discharge valve closed. _______ UNSAT STEP 1:

NOTES PRIOR TO STEP 1 STANDARD:

a) Reads note regarding charging pump priority.

b) Reads note that the highest priority charging pump should be aligned to the normal header.

COMMENTS:

STEP 2:

_______ SAT STEP 19a - Check CHG pumps - THREE RUNNING

_______ UNSAT STANDARD:

Examines charging pump configuration and determines that three charging pumps are in service.

Goes to step 19b EVALUATORS NOTE: N/A COMMENTS:

Page 4 of 10

Surry 2009-301 Establish Redundant Flowpaths STEP 3:

_______ SAT STEP 19b- Stop one CHG pump and put in PTL

_______ UNSAT STANDARD:

In accordance with note prior to step 19, determines that 1-CH-P-1A is lowest priority charging pump Secures 1-CH-P-1A and places in PTL- This is a critical step.

EVALUATORS NOTE: N/A COMMENTS:

STEP 4:

_______ SAT Step 19c - Open alternate HHSI to cold legs:

1-SI-MOV-1842- this is a critical step _______ UNSAT STANDARD:

Opens 1-SI-MOV-1842 EVALUATORS NOTE: N/A COMMENTS:

STEP 5:

_______ SAT Step 19d - Align one CHG pump to flow through the normal SI HDR by closing the associated alternate discharge MOV: _______ UNSAT 1-CH-P-1A 1-CH-MOV-1287A 1-CH-P-1B 1-CH-MOV-1287B 1-CH-P-1C 1-CH-MOV-1287C STANDARD:

Recalls from note prior to step that C charging pump should be aligned to the normal header and therefore closes 1-CH-MOV-1287C (1-CH-P-1C alternate discharge valve) - This is a critical step.

EVALUATORS NOTE: N/A COMMENTS:

Page 5 of 10

Surry 2009-301 Establish Redundant Flowpaths STEP 6:

_______ SAT Step 19e - Align the other running CHG pump to flow through the alternate SI HDR by closing the associated normal discharge MOV: _______ UNSAT 1-CH-P-1A 1-CH-MOV-1286A 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:

Determines that 1-CH-P-1B is the other running charging pump and closes 1-CH-MOV-1286B (1-CH-P-1B normal discharge valve) - This is a critical step.

EVALUATORS NOTE: N/A COMMENTS:

STEP 7:

_______ SAT Step 19f - Close the normal discharge MOV on the NON-RUNNING CHG pump:

1-CH-P-1A 1-CH-MOV-1286A _______ UNSAT 1-CH-P-1B 1-CH-MOV-1286B 1-CH-P-1C 1-CH-MOV-1286C STANDARD:

Determines that 1-CH-P-1A is secured (in PTL) and closes 1-CH-MOV-1286A (1-CH-P-1A normal discharge valve). This is a critical step.

EVALUATORS NOTE: N/A COMMENTS:

Page 6 of 10

Surry 2009-301 Establish Redundant Flowpaths STEP 8:

_______ SAT Step 19g - Verify HHSI flow through BOTH headers 1-SI-FI-1940 _______ UNSAT 1-SI-FI-1940A 1-SI-FI-1943 1-SI-FI-1943A STANDARD:

Verifies flow indication on all the above listed flowmeters.

EVALUATORS NOTE: N/A COMMENTS:

STEP 9:

_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).

_______ UNSAT STANDARD:

Verbal status report that redundant flowpath have been aligned in accordance with step 19.

EVALUATORS NOTE: N/A STOP TIME:

COMMENTS:

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Page 7 of 10

Surry 2009-301 Establish Redundant Flowpaths Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Perform Step 19 of 1-E-1, Loss of Reactor or Secondary Coolant, to establish redundant charging flowpaths.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue.

Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A Large Break LOCA has occurred on Unit 1.

Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.

Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A Large Break LOCA has occurred on Unit 1.

Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. We are in procedure 1-E-1 for a loss of Reactor coolant.

Here's a copy of 1-E-1, step 19. I need you to establish Charging pump redundant flow paths in accordance with step 19.

When you finish the actions necessary to accomplish this, please inform me.

NUMBER PROCEDURE TI TLE REVISION 31 1-E-1 1-E-1 LOSS OF REACTOR OR SECONDARY COOLANT PAGE 20 of 28 ACTION !/ EXPECTE EXPECTED D RESPONSE RESPONSE NOT OBTAINED

RESPONSE

NOTE: CHG pumps shou ld be run in the following order of priority: C, B, A.

The highest priority CHG pump should be aligned to the normal header.

header.

19. ESTABLISH CHG PUMP REDUNDANT FLOW PATHS:

PATHS:

o a) Check CHG pumps - THR THREEEE RUNN ING o a) 1£ one CHG pump runnrunning, ing, THEN GO TO Step 20.

1£ two CHG pumps running , THEN do the following :

o 1) Verify or place the non-running CHG pump in PTL.

o 2) GO TO Step 19c.19c.

o b) Stop one CHG pump and put in PTL c) Open alternate HHSI to cold legs:

o . 1-SI-MOV-1842 1-SI -MOV-1842 d) Align one CHG pump to ftow through the normal 81 HDR by closing the associated alternate discharge MOV:

o 1-CH-P-1 A 1-CH-P-1A 1-CH-MOV-1287A 1-CH-MOV-1287A o 1-CH-P-1 B 1-CH-MOV-1287B o 1-CH-P-1C 1-CH-MOV-1287C (STEP 19 CONTINUED ON NEXT PAGE) PAGE )

NUMBER PROCEDURE TITLE TI TLE REVISION 31 31 1-E-1 LOSS OF REACTOR OR SECONDARY COOLANT PAGE 21 of 28 ACTION ! EXPECTED RESPONSE RESPONSE RESPONS E NOT OBTAINED

19. ESTABLISH CHG PUMP REDUNDANT FLOW PATHS: (Continued)

(Continued )

e) Align the other running CHG pump to nowftow through the alternate SI HDR by closing the associated normal discharge MOV:

o 1-CH-P-1A l -CH-P-1 A 1-CH-MOV-1286A 1-CH -MOV-1286A o 1-CH-P-1 l-CH-P-1 B 1-CH-MOV-1 286B l-CH-MOV-1286B o 1-CH-P-1C l-CH-P-1C 1-CH-MOV-1286C l-CH-MOV-1286C f) Close the normal discharge MOV on the NON-RUNN ING CHG pump:

o 1-CH-P-1 l -CH-P-1 A 1-CH-MOV-1286A l -CH -MOV-1286A o 1-CH-P-1 l -CH-P-1 B 1-CH l -CH -MOV-1286B o 1-CH-P-1C l -CH-P-1 C 1-CH-MOV-1286C l -CH -MOV-1286C g) Verify HHSI now ftow through BOTH headers o 1-SI-FI-1940 l -SI -FI-1 940 o 1-SI-FI-1940A l-SI-FI-1940A o 1-SI-FI-1 l -SI -FI-1 943 o 1-SI-FI-1 l -SI -FI-1 943A

20. CHECK IF RCS COOL DOWN AND DEPRESSURIZATION IS REQUIRED:

o a) RCS pressure - GREAT ER o a) 1£ LH SI pump now ftow greater THAN 250 PSIG [4 00 PSIG] than 1000 gpm, THEN GO TO Step 21.

o b) GO TO 1-ES-1.2, l-ES-1.2, POST LOCA COOL DOWN AND DEPRESSURIZATION

Surry 2009-301 Align CS iaw ECA-1.1 U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure 026A2.03 (4.1/4.4)

Alternate Path Applicant________________________________ Start Time___________________

Examiner_______________________________

Date ___________________________________ Stop Time___________________

Title CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA-1.1 (LOSS OF EMERGENCY RECIRCULATION).

K/A: 026A2.03 Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; and (b) based on those predications, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Failure of ESF Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes Conditions Task is to be PERFORMED in the simulator.

A LBLOCA has occurred and both LHSI pumps are inoperable. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1-RS-P-2B in service to 1-RS-E-1D (with service water aligned) and 1-CS-P-1A and 1B in service.

Initiating Cues 1-ECA-1.1 step 8.

Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.

Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation.

Page 1 of 12

Surry 2009-301 Align CS iaw ECA-1.1 Tools and Equipment Safety Considerations None None Simulator Setup Call up 100% power IC and initialize (or IC-316).

Enter the following malfunctions:

o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B - Trigger 4 o SI0901- LHSI PUMP SI-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI-P-1B OVERCURRENT TRIP- Trigger 1 Setup the following event trigger- Event action- rsp1b_amp>0.1 - Event 4 Set up the following switch override- MOVSW104A_OPEN- OFF - INSERT Set up the following MOV override - SWMOV105C_RACKIN - set to RACKOUT and INSERT.

Place the simulator in RUN and perform 1-E-0 steps, then transition to 1-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1-ECA-1.1. Do not worry about stopping unloaded EDGs in E-1.

Start 1-CS-P-1A and open 1-CS-MOV-101A/B and 1-CS-MOV-102A Ensure containment sump level is >4.

Initiating Cues 1-ECA-1.1, Loss of Emergency Coolant Recirculation, step 8.

Shift Manager direction Directions to the Applicant I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.

Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.

When you finish the actions necessary to accomplish this, please inform me.

Notes Page 2 of 12

Surry 2009-301 Align CS iaw ECA-1.1 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

STEP 1:

_______ SAT CAUTION AND NOTE PRIOR TO STEP 8

_______ UNSAT CAUTION: Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.

NOTE: If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.

STANDARD:

Acknowledges caution and note.

COMMENTS:

STEP 2:

_______ SAT STEP 8a - Check for EITHER of the following:

_______ UNSAT

  • Any CS pump - RUNNING OR REQUIRED OR
  • RWST level - LESS THAN 20%

STANDARD:

Observes 1-CS-P-1A running and continues to substep b.

EVALUATORS NOTE: N/A COMMENTS:

Page 3 of 12

Surry 2009-301 Align CS iaw ECA-1.1 STEP 3:

_______ SAT Step 8b - Verify CTMT sump level - GREATER THAN 4.0 ft.

_______ UNSAT STANDARD:

Verifies containment sump level >4.

EVALUATORS NOTE: N/A COMMENTS:

STEP 4:

_______ SAT Step 8c - Verify SW aligned to at least two RS HXs

_______ UNSAT STANDARD:

Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO.

EVALUATORS NOTE: N/A COMMENTS:

Page 4 of 12

Surry 2009-301 Align CS iaw ECA-1.1 STEP 5:

_______ SAT Step 8c RNO - Align SW to at least two RS HXs.

_______ UNSAT STANDARD:

Opens 1-SW-MOV-103A- either this valve or 103B must be opened- one valve must be open as a critical step.

Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.

Opens 1-SW-MOV-103C.

Opens 1-SW-MOV-103D.

Opens 1-SW-MOV-104A - Determines that valve will not open Opens 1-SW-MOV-104B.

Opens 1-SW-MOV-104C.

Opens 1-SW-MOV-104D - This is a critical step.

Opens 1-SW-MOV-105A.

Opens 1-SW-MOV-105B.

Opens 1-SW-MOV-105C - Determines that valve will not open Opens 1-SW-MOV-105D - This is a critical step.

EVALUATORS NOTE: N/A BOOTH NOTE:

If asked: Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A Report time compression has occurred and there are no abnormal indication on 1-SW-MOV-104A (1H1-2N-7B) supply breaker.

If asked: Trainee may dispatch operator to investigate supply breaker for 1-SW-MOV-105C Report time compression has occurred and that the supply breaker (1H1-2N-8C) has tripped.

COMMENTS:

Page 5 of 12

Surry 2009-301 Align CS iaw ECA-1.1 STEP 6:

_______ SAT Step 8d - Start RS pumps associated with aligned RS HXs

_______ UNSAT STANDARD:

Trainee starts 1-RS-P-1B (B RS HX)

Trainee observes that 1-RS-P-1B tripped and continues.

Trainee starts 1-RS-P-2B (D RS HX) - This is a critical step.

EVALUATORS NOTE: N/A BOOTH NOTE: If directed to investigate breaker for 1-RS-P-1B (14J4), report that breaker is tripped as indicated by a Bell Lockout.

COMMENTS:

STEP 7:

_______ SAT CAUTIONS PRIOR TO STEP 9

_______ UNSAT CAUTION:

CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.

CS pumps taking suction from the RWST must be stopped when level decreases to 3%.

STANDARD:

Acknowledges cautions EVALUATORS NOTE: N/A COMMENTS:

Page 6 of 12

Surry 2009-301 Align CS iaw ECA-1.1 STEP 8:

_______ SAT Step 9a - Determine number of CS pumps required:

_______ UNSAT STANDARD:

Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.

EVALUATORS CUE: If asked, there are no abnormalities noted on either containment spray pump.

COMMENTS:

STEP 9:

_______ SAT Step 9b - CS pumps running - EQUAL TO NUMBER REQUIRED

_______ UNSAT STANDARD:

Determines that 2 CS pumps are required, but only 1 currently in service.

Goes to step 9 RNO.

EVALUATORS NOTE: N/A COMMENTS:

Page 7 of 12

Surry 2009-301 Align CS iaw ECA-1.1 STEP 10:

_______ SAT Step 9b RNO- Do the following:

1) Manually operate CS pump(s). _______ UNSAT
2) Close associated CS pump discharge MOVs for stopped pump(s):
  • 1-CS-P-1A, 1-CS-MOV-101A and 1-CS-MOV-101B
  • 1-CS-P-1B, 1-CS-MOV-101C and 1-CS-MOV-101D STANDARD:

Trainee starts 1-CS-P-1B and opens 1-CS-MOV-101C and/or 1-CS-MOV-101D-this is a critical step.

EVALUATORS NOTE: N/A COMMENTS:

STEP 11:

_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).

_______ UNSAT STANDARD:

Verbal status report that CS and RS have been aligned in accordance with ECA-1.1 steps 8 &

9.

EVALUATORS NOTE: N/A STOP TIME:

COMMENTS:

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Page 8 of 12

Surry 2009-301 Align CS iaw ECA-1.1 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue.

Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.

Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.

When you finish the actions necessary to accomplish this, please inform me.

9 of 12

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues I am the Shift Manager. A LOCA has occurred on Unit 1. Hi-Hi CLS failed to activate and both LHSI pumps have tripped. The team is performing 1-ECA-1.1, Loss of Emergency Coolant Recirculation, and is currently at step 8.

Here's a copy of 1-ECA-1.1, steps 8 and 9. I need you to align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9.

When you finish the actions necessary to accomplish this, please inform me.

NUMBER PROCEDURE TITLE TI TLE REVISION 29 1-ECA-1.1 LOSS OF EMERGEN CY COOLANT RECIRCULATION PAGE 7 of 31 ACTION !/ EXPECTE D RESPONSE RESPONSE RESPONS E NOT OBTAINED

CAUTION: Operation of an OSRS pump without the associated CS pump CQuid cause cavitation as indicated by fluctuating fluctuating amperage.

NOTE: If CLS CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.

S.

8. CHECK RECIRCULATION SPRAY SYSTEM:

a) Check for EITHER of the following: o a) GO TO Step 10.

o Any CS pump - RUNN ING OR REQUIRED OR o RWST level - LESS THAN 20%

o b) Verify CTMT sump leve l - GREATER b) Do the following:

THAN 4.0 ft o IE NOT, THEN reset

1) Ve rify CLS reset. If both trains of CLS.

o 2) Stop stop RS pumps.

o 3) WHEN sump level greater than 4.0 ftft,,

THEN do Steps Sc 8c and 8d Sd..

o 4) GO TO Step 9.

o c) Verify SW aligned to at least two RS HXs o c) Align SW to at least two RS HXs.

o d) Start RS pumps associated with aligned RS HXs

NUMBER PROCEDURE TI TITLE TLE REVISION 29 1-ECA-1.1 LOSS OF EMERGEN CY COO COOLANT LANT RECIRCULATION PAGE 8 of 31 ACTION ! EXPECTED RESPONSE RESPONSE NOT OBTAINED

  • * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * **
  • CAUTION:
  • CHG and LH SI pumps taking suction from the RWST must be stopped when level decreases to 6%.

6% .

CS pumps taking suction from the RWST must be stopped when level decreases decrea ses to 3%.

  • * * ** * * * * * * * * * * * * * * * * ** * * * ** * * * * * * * * * * * * * * * * ** * * * ** *
9. DETERMINE CS REQUIREMENTS:

o a) Determine number of CS pumps required:

CONTAINMENT RS PUMPS CS PUMPS PRESSURE RUNNING RUN NING REQU IRED GREATER THAN -------- 2 60 PSI A BETWEEN 14 PSIA FEW ER THAN 2 FEWER 2 AND 60 PSIA 20RMORE 20R MORE 1 LESS THAN


0 14 PSIA o b) CS pumps runn ing - EQUAL TO NUMBER b) Do the following:

IRED REQU IRE D o 1) Manually operate CS pump(s).

2) Close associated CS pump discharge MOVs for stopped pump(s):

o 1-CS-P-1A,1-CS-MOV-101A 1-CS-P-1A,1-CS-MOV-1 01A and 1-CS-M OV-101B 1-CS-MOV-101B o 1-CS-P-1B,1-CS-MOV-101C 1-CS-P-1B,1 -CS-MOV-1 0 1C and 1-CS-MOV-101D