| | number = ML093440877 | | | number = ML093440877 |
| | issue date = 12/24/2009 | | | issue date = 12/24/2009 |
| | title = Proposed License Amendment Request Regarding Relocation of Core Operating Limits to the Core Operating Limits Report (Colr) and Addition of Colr References | | | title = Proposed License Amendment Request Regarding Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR References |
| | author name = Giitter J G | | | author name = Giitter J |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000280, 05000281 | | | docket = 05000280, 05000281 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 24, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SURRY POWER STATION, UNIT NOS. 1 AND 2, PROPOSED LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF CORE OPERATING LIMITS TO THE CORE OPERATING LIMITS REPORT (COLR) AND ADDITION OF COLR REFERENCES (TAC NOS. ME2591 AND ME2592) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| | |
| | ==SUBJECT:== |
| | SURRY POWER STATION, UNIT NOS. 1 AND 2, PROPOSED LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF CORE OPERATING LIMITS TO THE CORE OPERATING LIMITS REPORT (COLR) AND ADDITION OF COLR REFERENCES (TAC NOS. ME2591 AND ME2592) |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
|
| |
|
| On October 16, 2009, a license amendment request (LAR) entitled "Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and addition of COLR references" (Reference 1) was submitted. | | On October 16, 2009, a license amendment request (LAR) entitled "Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and addition of COLR references" (Reference |
| Subsequently, on November 20, 2009, an LAR entitled "Removal of Mixing Vane Grid Spacing Restriction Appendix B to Fleet Report DOM-NAF-2-Evaluation of 4X4 Departure from Nucleate Boiling (DNB) Test of 15X15 Vantage+ with Intermediate Flow Mixer (IFMs) Grids Using Versatile Internals and Components Programs for Reactors-EPRI (VIPRE)-Dominion (D)/WRB-1" (Reference 2) was also submitted. This letter responds to your requested concurrent review of the Reference 1 LAR while the Reference 2 LAR is still under review. The Nuclear Regulatory Commission (NRC) staff reviewed your letter and concluded that the linking of the two amendments satisfies the criteria for "rare circumstances" stated in Office Instruction L1C-109, "Acceptance Review Procedures," Revision1 and is, therefore, justified. | | : 1) was submitted. Subsequently, on November 20, 2009, an LAR entitled "Removal of Mixing Vane Grid Spacing Restriction Appendix B to Fleet Report DOM-NAF-2-Evaluation of 4X4 Departure from Nucleate Boiling (DNB) Test of 15X15 Vantage+ with Intermediate Flow Mixer (IFMs) Grids Using Versatile Internals and Components Programs for Reactors-EPRI (VIPRE)-Dominion (D)/WRB-1" (Reference 2) was also submitted. This letter responds to your requested concurrent review of the Reference 1 LAR while the Reference 2 LAR is still under review. The Nuclear Regulatory Commission (NRC) staff reviewed your letter and concluded that the linking of the two amendments satisfies the criteria for "rare circumstances" stated in Office Instruction L1C-109, "Acceptance Review Procedures," Revision1 and is, therefore, justified. |
| Accordingly, we will accept the application for Reference 1 LAR while the Reference 2 LAR is still ongoing. In order to ensure a smooth review of Reference 1 LAR, I urge you to work closely with the NRC staff through your project manager, Ms. Karen Cotton, 301-415-1438. | | Accordingly, we will accept the application for Reference 1 LAR while the Reference 2 LAR is still ongoing. |
| Sincerely, Jo eph Giitter, Director Di ision of Operating Reactor Licensing Ice of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv December 24, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SURRY POWER STATION, UNIT NOS. 1 AND 2, PROPOSED LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF CORE OPERATING LIMITS TO THE CORE OPERATING LIMITS REPORT (COLR) AND ADDITION OF COLR REFERENCES (TAC NOS. ME2591 AND ME2592) | | In order to ensure a smooth review of Reference 1 LAR, I urge you to work closely with the NRC staff through your project manager, Ms. Karen Cotton, 301-415-1438. |
| | Sincerely, Jo eph Giitter, Director Di ision of Operating Reactor Licensing Ice of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv |
|
| |
|
| ==Dear Mr. Heacock:==
| | ML093440877 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA SRXB/BC NRR/LPL2-1/BC DORUD NAME KCotton MO'Brien (CSola for) GCranston GKulesa JGiitter DATE 12/24/09 12/24/09 12/22/09 12/24/09 12/24/09}} |
| On October 16, 2009, a license amendment request (LAR) entitled "Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and addition of COLR references" (Reference 1) was submitted.
| |
| Subsequently, on November 20, 2009, an LAR entitled "Removal of Mixing Vane Grid Spacing Restriction Appendix B to Fleet Report DOM-NAF-2-Evaluation of 4X4 Departure from Nucleate Boiling (DNB) Test of 15X15 Vantage+ with Intermediate Flow Mixer (IFMs) Grids Using Versatile Internals and Components Programs for Reactors-EPRI (VIPRE)-Dominion (D)/WRB-1" (Reference 2) was also submitted. This letter responds to your requested concurrent review of the Reference 1 LAR while the Reference 2 LAR is still under review. The Nuclear Regulatory Commission (NRC) staff reviewed your letter and concluded that the linking of the two amendments satisfies the criteria for "rare circumstances" stated in Office Instruction L1C-109, "Acceptance Review Procedures," Revision1 and is, therefore, justified. Accordingly, we will accept the application for Reference 1 LAR while the Reference 2 LAR is still ongoing. In order to ensure a smooth review of Reference 1 LAR, I urge you to work closely with the NRC staff through your project manager, Ms. Karen Cotton, 301-415-1438.
| |
| Sincerely, /raJ Joseph Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv DISTRIBUTION:
| |
| Public RidsNrrLAMO'Brien Resource RidsNrrDirsltsb Resource LPL2-1 R/F RidsOgcRp Resource RidsRgn2MailCenter Resource RidsNrrDorlLpl2-1 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrPMSurry Resource RidsNrrDssSrxb RidsNrrDorl Resource ADAMS Accession No ML093440877 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA SRXB/BC NRR/LPL2-1/BC DORUD NAME KCotton MO'Brien (CSola for)
| |
| GCranston GKulesa JGiitter DATE 12/24/09 12/24/09 12/22/09 12/24/09 12/24/09 OFFICIAL RECORD COPY}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML0934408772009-12-24024 December 2009 Proposed License Amendment Request Regarding Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR References Project stage: Other ML1014709052010-05-25025 May 2010 License Amendment Request Re Relocation of Core Operating Limits to the Core Operating Limits Report & Addition of Color References in Response to Request for Additional Information Project stage: Response to RAI ML1025301152010-10-19019 October 2010 Issuance of Amendments Regarding Request for Technical Specification Revisions Related to the Core Operating Limits Report(Tac Nos. ME2591 and ME2592) Project stage: Approval 2010-10-19
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NOS. 1 AND 2, PROPOSED LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF CORE OPERATING LIMITS TO THE CORE OPERATING LIMITS REPORT (COLR) AND ADDITION OF COLR REFERENCES (TAC NOS. ME2591 AND ME2592)
Dear Mr. Heacock:
On October 16, 2009, a license amendment request (LAR) entitled "Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and addition of COLR references" (Reference
- 1) was submitted. Subsequently, on November 20, 2009, an LAR entitled "Removal of Mixing Vane Grid Spacing Restriction Appendix B to Fleet Report DOM-NAF-2-Evaluation of 4X4 Departure from Nucleate Boiling (DNB) Test of 15X15 Vantage+ with Intermediate Flow Mixer (IFMs) Grids Using Versatile Internals and Components Programs for Reactors-EPRI (VIPRE)-Dominion (D)/WRB-1" (Reference 2) was also submitted. This letter responds to your requested concurrent review of the Reference 1 LAR while the Reference 2 LAR is still under review. The Nuclear Regulatory Commission (NRC) staff reviewed your letter and concluded that the linking of the two amendments satisfies the criteria for "rare circumstances" stated in Office Instruction L1C-109, "Acceptance Review Procedures," Revision1 and is, therefore, justified.
Accordingly, we will accept the application for Reference 1 LAR while the Reference 2 LAR is still ongoing.
In order to ensure a smooth review of Reference 1 LAR, I urge you to work closely with the NRC staff through your project manager, Ms. Karen Cotton, 301-415-1438.
Sincerely, Jo eph Giitter, Director Di ision of Operating Reactor Licensing Ice of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv
ML093440877 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA SRXB/BC NRR/LPL2-1/BC DORUD NAME KCotton MO'Brien (CSola for) GCranston GKulesa JGiitter DATE 12/24/09 12/24/09 12/22/09 12/24/09 12/24/09