ML093440877

From kanterella
Jump to navigation Jump to search

Proposed License Amendment Request Regarding Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR References
ML093440877
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/24/2009
From: Giitter J
Division of Operating Reactor Licensing
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Cotton, Karen -301-415-1438 NRR/DORL
References
TAC ME2591, TAC ME2592
Download: ML093440877 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2, PROPOSED LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF CORE OPERATING LIMITS TO THE CORE OPERATING LIMITS REPORT (COLR) AND ADDITION OF COLR REFERENCES (TAC NOS. ME2591 AND ME2592)

Dear Mr. Heacock:

On October 16, 2009, a license amendment request (LAR) entitled "Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and addition of COLR references" (Reference

1) was submitted. Subsequently, on November 20, 2009, an LAR entitled "Removal of Mixing Vane Grid Spacing Restriction Appendix B to Fleet Report DOM-NAF-2-Evaluation of 4X4 Departure from Nucleate Boiling (DNB) Test of 15X15 Vantage+ with Intermediate Flow Mixer (IFMs) Grids Using Versatile Internals and Components Programs for Reactors-EPRI (VIPRE)-Dominion (D)/WRB-1" (Reference 2) was also submitted. This letter responds to your requested concurrent review of the Reference 1 LAR while the Reference 2 LAR is still under review. The Nuclear Regulatory Commission (NRC) staff reviewed your letter and concluded that the linking of the two amendments satisfies the criteria for "rare circumstances" stated in Office Instruction L1C-109, "Acceptance Review Procedures," Revision1 and is, therefore, justified.

Accordingly, we will accept the application for Reference 1 LAR while the Reference 2 LAR is still ongoing.

In order to ensure a smooth review of Reference 1 LAR, I urge you to work closely with the NRC staff through your project manager, Ms. Karen Cotton, 301-415-1438.

Sincerely, Jo eph Giitter, Director Di ision of Operating Reactor Licensing Ice of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv

ML093440877 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA SRXB/BC NRR/LPL2-1/BC DORUD NAME KCotton MO'Brien (CSola for) GCranston GKulesa JGiitter DATE 12/24/09 12/24/09 12/22/09 12/24/09 12/24/09