ML093480050: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/17/2009 | | issue date = 12/17/2009 | ||
| title = Request for Withholding Information from Public Disclosure | | title = Request for Withholding Information from Public Disclosure | ||
| author name = Goodwin C | | author name = Goodwin C | ||
| author affiliation = NRC/NRR/DORL/LPLIII-2 | | author affiliation = NRC/NRR/DORL/LPLIII-2 | ||
| addressee name = Pardee C | | addressee name = Pardee C | ||
| addressee affiliation = Exelon Nuclear | | addressee affiliation = Exelon Nuclear | ||
| docket = 05000461 | | docket = 05000461 | ||
Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
| project = TAC:ME1643 | | project = TAC:ME1643 | ||
| stage = | | stage = Withholding Request Acceptance | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 Ikffilber 17, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 CLINTON POWER STATION, UNIT NO.1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME1643) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ikffilber 17, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | ||
==SUBJECT:== | |||
CLINTON POWER STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME1643) | |||
==Dear Mr. Pardee:== | ==Dear Mr. Pardee:== | ||
By letter to the Nuclear Regulatory Commission (NRC) dated December 9, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML093440271), Exelon Generation Company, LLC (EGC) submitted an affidavit dated December 4,2009, executed by James F. Harrison, Vice President, Fuel Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC. (GEH), requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to paragraph (a)(4) of Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: NEDC-33505P, "Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Clinton Power Station," Errata and Addenda, E&A Number 1, dated December 4,2009. The proprietary version of the document and the GEH affidavit are in Attachments 1 and 2 to the letter dated December 9, 2009, from EGC to the U.S. Nuclear Regulatory Commission (NRC), for the Clinton Power Station, Unit NO.1. A non-proprietary copy of the document, provided as Attachment 3 to the letter dated December 9, 2009, has been added to the ADAMS Public Electronic Reading Room (ADAMS Accession No. ML093440276). | |||
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture. | By letter to the Nuclear Regulatory Commission (NRC) dated December 9, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML093440271), Exelon Generation Company, LLC (EGC) submitted an affidavit dated December 4,2009, executed by James F. Harrison, Vice President, Fuel Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC. (GEH), requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to paragraph (a)(4) of Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: | ||
shipment, installation, assurance of quality, or licensing of a similar product; C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | * NEDC-33505P, "Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Clinton Power Station," Errata and Addenda, E&A Number 1, dated December 4,2009. | ||
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | The proprietary version of the document and the GEH affidavit are in Attachments 1 and 2 to the letter dated December 9, 2009, from EGC to the U.S. Nuclear Regulatory Commission (NRC), | ||
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information. | for the Clinton Power Station, Unit NO.1. | ||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | A non-proprietary copy of the document, provided as Attachment 3 to the letter dated December 9, 2009, has been added to the ADAMS Public Electronic Reading Room (ADAMS Accession No. ML093440276). | ||
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: | ||
(a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture. shipment, installation, assurance of quality, or licensing of a similar product; | |||
C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | |||
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | |||
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information. | |||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | |||
If you have any questions regarding this matter, please contact me at (301)415-3719. | If you have any questions regarding this matter, please contact me at (301)415-3719. | ||
Sincerely, I I) /. | Sincerely, I I) / . | ||
Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page Clinton power Station, Unit NO.1 James F. Harrison, Vice President Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, M/C Wilmington, NC Additional Distribution via ListServ C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | (!<:Jl~:z~./A/'/\~ | ||
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section | Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page | ||
If the need arises, we may send copies of this information to our consultants working in this area. | |||
We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information. | Clinton power Station, Unit NO.1 cc: James F. Harrison, Vice President Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, M/C A-55 Wilmington, NC 28401 Additional Distribution via ListServ | ||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | |||
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | ||
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | |||
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information. | |||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | |||
If you have any questions regarding this matter, please contact me at (301 )415-3719. | If you have any questions regarding this matter, please contact me at (301 )415-3719. | ||
Sincerely, IRA! Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page DISTRIBUTION: | Sincerely, IRA! | ||
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalie Resource RidsNrrLATHarris Resource RidsNrrDorlDpr Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No ML093480050 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME CGoodwin THarris SCampbell DATE 12/16/09 12/16/09 12/17109 OFFICIAL RECORD COpy}} | Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page DISTRIBUTION: | ||
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalie Resource RidsNrrLATHarris Resource RidsNrrDorlDpr Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No ML093480050 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME CGoodwin THarris SCampbell DATE 12/16/09 12/16/09 12/17109 OFFICIAL RECORD COpy}} |
Latest revision as of 23:32, 13 November 2019
ML093480050 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 12/17/2009 |
From: | Goodwin C Plant Licensing Branch III |
To: | Pardee C Exelon Nuclear |
Goodwin C | |
References | |
TAC ME1643 | |
Download: ML093480050 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ikffilber 17, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME1643)
Dear Mr. Pardee:
By letter to the Nuclear Regulatory Commission (NRC) dated December 9, 2009 (Agencywide Documents Access and Management System (ADAMS) Package No. ML093440271), Exelon Generation Company, LLC (EGC) submitted an affidavit dated December 4,2009, executed by James F. Harrison, Vice President, Fuel Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC. (GEH), requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to paragraph (a)(4) of Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- NEDC-33505P, "Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Clinton Power Station," Errata and Addenda, E&A Number 1, dated December 4,2009.
The proprietary version of the document and the GEH affidavit are in Attachments 1 and 2 to the letter dated December 9, 2009, from EGC to the U.S. Nuclear Regulatory Commission (NRC),
for the Clinton Power Station, Unit NO.1.
A non-proprietary copy of the document, provided as Attachment 3 to the letter dated December 9, 2009, has been added to the ADAMS Public Electronic Reading Room (ADAMS Accession No. ML093440276).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture. shipment, installation, assurance of quality, or licensing of a similar product;
C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, please contact me at (301)415-3719.
Sincerely, I I) / .
(!<:Jl~:z~./A/'/\~
Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page
Clinton power Station, Unit NO.1 cc: James F. Harrison, Vice President Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, M/C A-55 Wilmington, NC 28401 Additional Distribution via ListServ
C. Pardee -2 We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, please contact me at (301 )415-3719.
Sincerely, IRA!
Cameron S. Goodwin, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalie Resource RidsNrrLATHarris Resource RidsNrrDorlDpr Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No ML093480050 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME CGoodwin THarris SCampbell DATE 12/16/09 12/16/09 12/17109 OFFICIAL RECORD COpy