ML101760513: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/10/2010
| issue date = 06/10/2010
| title = NRC Operator Licensing Initial Exam Results, Oyster Creek Generating Station, Unit 1
| title = NRC Operator Licensing Initial Exam Results, Oyster Creek Generating Station, Unit 1
| author name = Hansell S L
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Reiner R J
| addressee name = Reiner R
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000219
| docket = 05000219
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:June 10, 2010  
{{#Wiki_filter:June 10, 2010 Mr. Robert J. Reiner Jr.
 
Training Director Exelon Nuclear Oyster Creek Nuclear Generating Station Route 9 South P.O. Box 388 Forked River, NJ 08731
Mr. Robert J. Reiner Jr.
Training Director Exelon Nuclear Oyster Creek Nuclear Generating Station Route 9 South P.O. Box 388 Forked River, NJ 08731  


==Subject:==
==Subject:==
NRC Operator Licensing Initial Exam Results Oyster Creek Generating Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)  
NRC Operator Licensing Initial Exam Results Oyster Creek Generating Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)


==Dear Mr. Reiner:==
==Dear Mr. Reiner:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on May 26, 2010, and the walk-through (overall)  
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on May 26, 2010, and the walk-through (overall) and/or simulator operating tests administered May 17 to May 24, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
 
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, fourteen individuals who took the examination passed. However, as explained in paragraph D.3.c of Examination Standard (ES) 501 in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, we will not issue one license until you certify in writing that he has acquired all of the training and experience for which he was previously granted a waiver. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.
and/or simulator oper ating tests administered May 17 to May 24, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors.This information is considered "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.  
 
As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary, "fourteen individuals who took the examination passed.
However, as explained in paragraph D.3.c of Examination Standard (ES) 501 in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, we will not issue one license until you certify in writing that he has acquired all of the training and experience for which he was previously granted a waiver.  


contains the individual results ES-303-1 and 303-2, "Operator License Examination Report," for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appr opriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license app lications (i.e., NRC Form 398).
R. J. Reiner Jr.                             Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
 
Sincerely,
is a copy of the licenses.   
                                            /RA/
 
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-219 License No. DPR-16
R. J. Reiner Jr.     Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.  
 
Sincerely,       /RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety  
 
Docket No. 050-219 License No. DPR-16  


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
Mr. Michael J. Massaro, Vice President


cc w/licenses:
R. J. Reiner, Jr.                                     Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Mr. Michael J. Massaro, Vice President R. J. Reiner, Jr.  
Sincerely,
 
                                                      /RA/
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.  
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-219 License No. DPR-16
 
Sincerely,       /RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety  
 
Docket No. 050-219 License No. DPR-16  


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
 
Mr. Michael J. Massaro, Vice President Distribution w/o enclosures:
cc w/licenses:
Master Exam File SUNSI Review Complete:            slh           (Reviewer=s Initials)
Mr. Michael J. Massaro, Vice President  
ADAMS PKG: ML092470040                                                   ADAMS NO.: ML101760513 DOCUMENT NAME:
 
G:\DRS\Operations Branch\DANTONIO\Exam 10-OC May 10 (U01771)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.
Distribution w/o enclosures:
OFFICE               RI/DRS/OB             RI/DRS/OB                 RI/DRS/OB NAME                 CBixler/CB             JDAntonio/JD             SLHansell/SL DATE                 06/10/10               06/ 10 /10               06/10 /10 OFFICIAL RECORD COPY}}
Master Exam File
 
SUNSI Review Complete:            slh               (Reviewer
=s Initials) ADAMS PKG: ML092470040     ADAMS NO.: ML101760513 DOCUMENT NAME:   G:\DRS\Operations Branch\DANTONIO\Exam 10-OC May 10 (U01771)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public. OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CBixler/CB JD'Antonio
/JD SLHansell/
SL DATE 06/10/10 06/ 10 /10 06/10 /10   OFFICIAL RECORD COPY}}

Latest revision as of 17:42, 13 November 2019

NRC Operator Licensing Initial Exam Results, Oyster Creek Generating Station, Unit 1
ML101760513
Person / Time
Site: Oyster Creek
Issue date: 06/10/2010
From: Hansell S
Operations Branch I
To: Reiner R
Exelon Generation Co, Exelon Nuclear
Hansell S
Shared Package
ML092470040 List:
References
TAC U01771
Download: ML101760513 (3)


Text

June 10, 2010 Mr. Robert J. Reiner Jr.

Training Director Exelon Nuclear Oyster Creek Nuclear Generating Station Route 9 South P.O. Box 388 Forked River, NJ 08731

Subject:

NRC Operator Licensing Initial Exam Results Oyster Creek Generating Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Reiner:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on May 26, 2010, and the walk-through (overall) and/or simulator operating tests administered May 17 to May 24, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, fourteen individuals who took the examination passed. However, as explained in paragraph D.3.c of Examination Standard (ES) 501 in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, we will not issue one license until you certify in writing that he has acquired all of the training and experience for which he was previously granted a waiver. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.

R. J. Reiner Jr. Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-219 License No. DPR-16

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Michael J. Massaro, Vice President

R. J. Reiner, Jr. Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-219 License No. DPR-16

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Michael J. Massaro, Vice President Distribution w/o enclosures:

Master Exam File SUNSI Review Complete: slh (Reviewer=s Initials)

ADAMS PKG: ML092470040 ADAMS NO.: ML101760513 DOCUMENT NAME:

G:\DRS\Operations Branch\DANTONIO\Exam 10-OC May 10 (U01771)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CB JDAntonio/JD SLHansell/SL DATE 06/10/10 06/ 10 /10 06/10 /10 OFFICIAL RECORD COPY