| number = ML102070183
| number = ML102070183
| issue date = 07/26/2010
| issue date = 07/26/2010
| title = Waterford-2010-10-Draft Outline Comments
| title = 2010-10-Draft Outline Comments
| author name = Apger G W
| author name = Apger G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: Waterford 3 First Exam Date:October 4, 2010 (OP)
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: Waterford 3                               First Exam Date:   October 4, 2010 (OP)
Written Exam Outline (7-13-10) Comment Resolution 1 RO T2G1 System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected 2 RO T1G2 EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected 3 SRO T2G2 System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected      Administrative JPM Outline (7-12-10) Comment Resolution 1 Every exam has had an EP classification (back to 2006). Ensure this is unique when submitting the draft JPM. No action required. Note to facility only.
Written Exam Outline (7-13-10)
Control Room / In-Plant System JPM Outline (7-12-10) Comment Resolution 1 S1-Used on 2009 Exam (P) Comment only. No action required. 2 S4-Used on 2009 Exam (P) Comment only. No action required. 3 S6-Used on 2010 Re-take (P) Comment only. No action required. 4 P3-Modified from 2010 Retake JPM Comment only. No action required.     Simulator Scenario Outline Comments (7-13-10) Comment Resolution Sc1 A) Event 5 should be split out. The component malfunction is a  
Comment                                     Resolution RO T2G1                                   KA reselected 1  System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect.
RO T1G2                                    KA reselected 2   EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect.
SRO T2G2                                  KA reselected 3   System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect.
Administrative JPM Outline (7-12-10)
Comment                                     Resolution Every exam has had an EP classification No action required. Note to facility only.
(back to 2006). Ensure this is unique when submitting the draft JPM.
Control Room / In-Plant System JPM Outline (7-12-10)
Comment                                     Resolution 1   S1-Used on 2009 Exam (P)                   Comment only. No action required.
2   S4-Used on 2009 Exam (P)                   Comment only. No action required.
3   S6-Used on 2010 Re-take (P)               Comment only. No action required.
4   P3-Modified from 2010 Retake JPM           Comment only. No action required.
Simulator Scenario Outline Comments (7-13-10)
Comment                                     Resolution A) Event 5 should be split out. The SEE MARKUP pdf file.
component malfunction is a       Comments incorporated separate event.
Sc1 B) Events 8 and 9 are not events (component malfunctions). They are actions required by                                                      OBDI 202 - IOLE Process


separate event. B) Events 8 and 9 are not events (component malfunctions). They are actions required by SEE MARKUP pdf file. Comments incorporated Attachment 6  OBDI 202 - IOLE Process procedure for the 2 nd major event. One is a critical task. The  
procedure for the 2nd major event. One is a critical task. The other annotates the wrong generator.
 
C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT.
other annotates the wrong  
A) Post trip events are the same as     Did not use this in 2009.
 
scenario 2 on the 2009 exam as       Scenario OK as is.
generator. C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT.
well as the initial conditions.
Sc2 A) Post trip events are the same as scenario 2 on the 2009 exam as well as the initial conditions.
Swap out-of-service train and Sc2 faulted EDG. Change the starting power.
Swap out-of-service train and  
B) Missing horizontal borders between events 2,3 and 4,5.
 
A) Change this to start at the critical LOW POWER MODE 3 hold (1E-8 [Westinghouse             Events changed and comments incorporated parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold Sc3        at Mode 2 power.
faulted EDG. Change the starting power. B) Missing horizontal borders between events 2,3 and 4,5. Did not use this in 2009. Scenario OK as is.
B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1.
Sc3 A) Change this to start at the critical hold (1E-8 [Westinghouse parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold  
A) Can we let the condition in event   Comments incorporated 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6.
 
Sc4 B) Horizontal borders missing.
at Mode 2 power. B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1. LOW POWER MODE 3 Events changed and comments incorporated Sc4 A) Can we let the condition in event 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6. B) Horizontal borders missing.
C) Remove Spare from Op-test number. We dont know the spare until after validation.                                                         OBDI 202 - IOLE Process}}
C) Remove Spare from Op-test number. We don't know the spare until after validation. Comments incorporated}}

Latest revision as of 15:40, 13 November 2019

2010-10-Draft Outline Comments
ML102070183
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/26/2010
From: Apger G
Operations Branch IV
To:
Entergy Operations
References
50-382/10-302 50-382/10-302
Download: ML102070183 (2)


Text

DRAFT OUTLINE COMMENTS Facility: Waterford 3 First Exam Date: October 4, 2010 (OP)

Written Exam Outline (7-13-10)

Comment Resolution RO T2G1 KA reselected 1 System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect.

RO T1G2 KA reselected 2 EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect.

SRO T2G2 KA reselected 3 System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect.

Administrative JPM Outline (7-12-10)

Comment Resolution Every exam has had an EP classification No action required. Note to facility only.

1 (back to 2006). Ensure this is unique when submitting the draft JPM.

Control Room / In-Plant System JPM Outline (7-12-10)

Comment Resolution 1 S1-Used on 2009 Exam (P) Comment only. No action required.

2 S4-Used on 2009 Exam (P) Comment only. No action required.

3 S6-Used on 2010 Re-take (P) Comment only. No action required.

4 P3-Modified from 2010 Retake JPM Comment only. No action required.

Simulator Scenario Outline Comments (7-13-10)

Comment Resolution A) Event 5 should be split out. The SEE MARKUP pdf file.

component malfunction is a Comments incorporated separate event.

Sc1 B) Events 8 and 9 are not events (component malfunctions). They are actions required by OBDI 202 - IOLE Process

procedure for the 2nd major event. One is a critical task. The other annotates the wrong generator.

C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT.

A) Post trip events are the same as Did not use this in 2009.

scenario 2 on the 2009 exam as Scenario OK as is.

well as the initial conditions.

Swap out-of-service train and Sc2 faulted EDG. Change the starting power.

B) Missing horizontal borders between events 2,3 and 4,5.

A) Change this to start at the critical LOW POWER MODE 3 hold (1E-8 [Westinghouse Events changed and comments incorporated parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold Sc3 at Mode 2 power.

B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1.

A) Can we let the condition in event Comments incorporated 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6.

Sc4 B) Horizontal borders missing.

C) Remove Spare from Op-test number. We dont know the spare until after validation. OBDI 202 - IOLE Process