| issue date = 08/26/2010
| issue date = 08/26/2010
| title = 2010 Fermi Initial License Examination - Operating Test Review Comments
| title = 2010 Fermi Initial License Examination - Operating Test Review Comments
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OPERATING TEST COMMENTS JPM COMMENTS  
{{#Wiki_filter:OPERATING TEST COMMENTS JPM COMMENTS
: 1. JPM No. 2010-301-AT-01R - Unable to setup simulator to support performance of MODE 5 Shiftly/Daily Surveillance  
: 1. JPM No. 2010-301-AT-01R - Unable to setup simulator to support performance of MODE 5 Shiftly/Daily Surveillance
: a. Changed from a MODE 5 to MODE 4 surveillance  
: a. Changed from a MODE 5 to MODE 4 surveillance
: b. Changed K/A from 2.1.44 to 2.1.18  
: b. Changed K/A from 2.1.44 to 2.1.18
: c. Changed task elements due to changes in MODE to include:  
: c. Changed task elements due to changes in MODE to include:
: i. Recording of Torus Water Level ii. Recording of RPV Flange Temperature iii. Identification abnormal indication for annunciator 3D57 iv. Identification of abnormal RHR configuration  
: i. Recording of Torus Water Level ii. Recording of RPV Flange Temperature iii. Identification abnormal indication for annunciator 3D57 iv. Identification of abnormal RHR configuration
: v. Identification of abnormal SRM indication  
: v. Identification of abnormal SRM indication
: 2. JPM No. 2010-301-AT-01S  
: 2. JPM No. 2010-301-AT-01S
: a. Changed K/A from 2.1.44 to 2.1.40 to reflect SRO nature of JPM  
: a. Changed K/A from 2.1.44 to 2.1.40 to reflect SRO nature of JPM
: b. Changed SRM verification step  
: b. Changed SRM verification step
: i. From 1 SRM below 3 cps to 2 SRMs below 3 cps ii. Included completed SRM signal to noise verification packages to be evaluated  
: i. From 1 SRM below 3 cps to 2 SRMs below 3 cps ii. Included completed SRM signal to noise verification packages to be evaluated
: c. Included Secondary Containment Differential Pressure Correction Tables as required material  
: c. Included Secondary Containment Differential Pressure Correction Tables as required material
: 3. JPM No. 2010-301-AT-02  
: 3. JPM No. 2010-301-AT-02
: a. Revised to allow use of IPCS including addition of appropriate cues  
: a. Revised to allow use of IPCS including addition of appropriate cues
: b. Revised to include data tables (information to be provided when requested); allows performance in classroom setting rather than in Simulator  
: b. Revised to include data tables (information to be provided when requested);
: 4. JPM No. 2010-301-AT-03S  
allows performance in classroom setting rather than in Simulator
: a. Changed task from "Assess Shutdown Risk" to "Evaluate a Temporary Change Notice" since procedure guidance for assessing risk was too generic to support a JPM.  
: 4. JPM No. 2010-301-AT-03S
: b. Replacement JPM from bank  
: a. Changed task from Assess Shutdown Risk to Evaluate a Temporary Change Notice since procedure guidance for assessing risk was too generic to support a JPM.
: 5. JPM No. 2010-301-AT-04R  
: b. Replacement JPM from bank
: a. Changed to RO only  
: 5. JPM No. 2010-301-AT-04R
: b. Revised required materials to include Mock Up RWP and Survey Map  
: a. Changed to RO only
: 6. JPM No. 2010-301-AT-04S  
: b. Revised required materials to include Mock Up RWP and Survey Map
: a. Added new SRO only JPM to Review and approve Discharge Permit  
: 6. JPM No. 2010-301-AT-04S
: b. Replacement JPM from bank  
: a. Added new SRO only JPM to Review and approve Discharge Permit
: 7. JPM No. 2010-301-AT-05S  
: b. Replacement JPM from bank
: a. Updated to reflect changes in procedure.  
: 7. JPM No. 2010-301-AT-05S
: 8. JPM No. 2010-301-CR-04  
: a. Updated to reflect changes in procedure.
: a. Included a recommended IC for setup  
: 8. JPM No. 2010-301-CR-04
: b. Added clarifying information to evaluator prompt and note  
: a. Included a recommended IC for setup
: 9. JPM No. 2010-301-CR-05  
: b. Added clarifying information to evaluator prompt and note
: a. Added step to setup to ensure that injection path is isolated  
: 9. JPM No. 2010-301-CR-05
: b. Added step to un-isolate injection path  
: a. Added step to setup to ensure that injection path is isolated
: c. Included preferred level band in evaluator notes.
: b. Added step to un-isolate injection path
: 10. JPM No. 2010-301-CR-07  
: c. Included preferred level band in evaluator notes.
: a. Added guidance for simulator operator to act as RO responsible for maintaining reactor period and ranging of IRMs  
: 10. JPM No. 2010-301-CR-07
: 11. JPM No. 2010-301-IP-02  
: a. Added guidance for simulator operator to act as RO responsible for maintaining reactor period and ranging of IRMs
: a. Changed valve number and fuse location to simplify access to panel  
: 11. JPM No. 2010-301-IP-02
: 12. JPM No. 2010-301-IP-03  
: a. Changed valve number and fuse location to simplify access to panel
: a. Added clarifying information for evaluator  
: 12. JPM No. 2010-301-IP-03
: b. Added missed step  
: a. Added clarifying information for evaluator
 
: b. Added missed step SCENARIO COMMENTS
SCENARIO COMMENTS  
: 1. Scenario 1
: 1. Scenario 1  
: a. Eliminated reactivity manipulation to shorten scenario run time
: a. Eliminated reactivity manipulation to shorten scenario run time  
: b. Increased delay time for sticking IRM to provide a more noticeable indication of failure.
: b. Increased delay time for sticking IRM to provide a more noticeable indication of failure. c. Included additional role play messages for communicator  
: c. Included additional role play messages for communicator
: d. Added clarification that applicants may isolate RCIC before auto isolation signal is actuated  
: d. Added clarification that applicants may isolate RCIC before auto isolation signal is actuated
: e. Added clarifying note for CRD Flow transmitter failure  
: e. Added clarifying note for CRD Flow transmitter failure
: f. Added clarifying not related to exiting ATWS EOP power leg to SCRAM AOP  
: f. Added clarifying not related to exiting ATWS EOP power leg to SCRAM AOP
: g. Changed mechanical vacuum pump failure from a credited component failure to simply an observation of failure  
: g. Changed mechanical vacuum pump failure from a credited component failure to simply an observation of failure
: 2. Scenario 2  
: 2. Scenario 2
: a. Changed RR Pump trip event type from Reactivity Manipulation to Component malfunction due to insufficient time between initiation of malfunction and automatic trip of pump.  
: a. Changed RR Pump trip event type from Reactivity Manipulation to Component malfunction due to insufficient time between initiation of malfunction and automatic trip of pump.
: b. Added Role-Play communications  
: b. Added Role-Play communications
: c. Revised Bypass Valve Test expected actions to include both procedurally allowed methods for reclosing valve.  
: c. Revised Bypass Valve Test expected actions to include both procedurally allowed methods for reclosing valve.
: d. Revised expected TS actions for failed accumulator to provide more detail  
: d. Revised expected TS actions for failed accumulator to provide more detail
: e. Added expectation for insertion of CRAM array in response to RR Pump Trip  
: e. Added expectation for insertion of CRAM array in response to RR Pump Trip
: f. Revised response actions for Feed Pump suction strainer clogging to include possibility that applicants may trip pump rather than perform a controlled shutdown of pump (power already low enough to support single pump operation due to RR pump trip response)  
: f. Revised response actions for Feed Pump suction strainer clogging to include possibility that applicants may trip pump rather than perform a controlled shutdown of pump (power already low enough to support single pump operation due to RR pump trip response)
: 3. Scenario 3  
: 3. Scenario 3
: a. Changed CW system rupture event ty pe from "Major" to "Component" failure.  
: a. Changed CW system rupture event type from Major to Component failure.
: b. Revised severity of SBFW Injection valve failure to permit some injection to ensure that response to small break LOCA is driven by containment parameters  
: b. Revised severity of SBFW Injection valve failure to permit some injection to ensure that response to small break LOCA is driven by containment parameters and not RPV parameters
 
: c. Eliminated RCIC malfunction and changed HPCI failure from a credited malfunction to recognition of failure.
and not RPV parameters  
: d. Added Role-Play communications
: c. Eliminated RCIC malfunction and changed HPCI failure from a credited malfunction to recognition of failure.  
: e. Changed stator water cooling malfunction from TCV failure to HX fouling
: d. Added Role-Play communications  
: e. Changed stator water cooling malfunction from TCV failure to HX fouling  
: f. Added clarifying information where needed.}}
: f. Added clarifying information where needed.}}

Latest revision as of 05:50, 13 November 2019

2010 Fermi Initial License Examination - Operating Test Review Comments
ML110050116
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/26/2010
From: David Reeser
Operations Branch III
To:
Detroit Edison
References
50-341/10-301
Download: ML110050116 (2)


Text

OPERATING TEST COMMENTS JPM COMMENTS

1. JPM No. 2010-301-AT-01R - Unable to setup simulator to support performance of MODE 5 Shiftly/Daily Surveillance
a. Changed from a MODE 5 to MODE 4 surveillance
b. Changed K/A from 2.1.44 to 2.1.18
c. Changed task elements due to changes in MODE to include:
i. Recording of Torus Water Level ii. Recording of RPV Flange Temperature iii. Identification abnormal indication for annunciator 3D57 iv. Identification of abnormal RHR configuration
v. Identification of abnormal SRM indication
2. JPM No. 2010-301-AT-01S
a. Changed K/A from 2.1.44 to 2.1.40 to reflect SRO nature of JPM
b. Changed SRM verification step
i. From 1 SRM below 3 cps to 2 SRMs below 3 cps ii. Included completed SRM signal to noise verification packages to be evaluated
c. Included Secondary Containment Differential Pressure Correction Tables as required material
3. JPM No. 2010-301-AT-02
a. Revised to allow use of IPCS including addition of appropriate cues
b. Revised to include data tables (information to be provided when requested);

allows performance in classroom setting rather than in Simulator

4. JPM No. 2010-301-AT-03S
a. Changed task from Assess Shutdown Risk to Evaluate a Temporary Change Notice since procedure guidance for assessing risk was too generic to support a JPM.
b. Replacement JPM from bank
5. JPM No. 2010-301-AT-04R
a. Changed to RO only
b. Revised required materials to include Mock Up RWP and Survey Map
6. JPM No. 2010-301-AT-04S
a. Added new SRO only JPM to Review and approve Discharge Permit
b. Replacement JPM from bank
7. JPM No. 2010-301-AT-05S
a. Updated to reflect changes in procedure.
8. JPM No. 2010-301-CR-04
a. Included a recommended IC for setup
b. Added clarifying information to evaluator prompt and note
9. JPM No. 2010-301-CR-05
a. Added step to setup to ensure that injection path is isolated
b. Added step to un-isolate injection path
c. Included preferred level band in evaluator notes.
10. JPM No. 2010-301-CR-07
a. Added guidance for simulator operator to act as RO responsible for maintaining reactor period and ranging of IRMs
11. JPM No. 2010-301-IP-02
a. Changed valve number and fuse location to simplify access to panel
12. JPM No. 2010-301-IP-03
a. Added clarifying information for evaluator
b. Added missed step SCENARIO COMMENTS
1. Scenario 1
a. Eliminated reactivity manipulation to shorten scenario run time
b. Increased delay time for sticking IRM to provide a more noticeable indication of failure.
c. Included additional role play messages for communicator
d. Added clarification that applicants may isolate RCIC before auto isolation signal is actuated
e. Added clarifying note for CRD Flow transmitter failure
f. Added clarifying not related to exiting ATWS EOP power leg to SCRAM AOP
g. Changed mechanical vacuum pump failure from a credited component failure to simply an observation of failure
2. Scenario 2
a. Changed RR Pump trip event type from Reactivity Manipulation to Component malfunction due to insufficient time between initiation of malfunction and automatic trip of pump.
b. Added Role-Play communications
c. Revised Bypass Valve Test expected actions to include both procedurally allowed methods for reclosing valve.
d. Revised expected TS actions for failed accumulator to provide more detail
e. Added expectation for insertion of CRAM array in response to RR Pump Trip
f. Revised response actions for Feed Pump suction strainer clogging to include possibility that applicants may trip pump rather than perform a controlled shutdown of pump (power already low enough to support single pump operation due to RR pump trip response)
3. Scenario 3
a. Changed CW system rupture event type from Major to Component failure.
b. Revised severity of SBFW Injection valve failure to permit some injection to ensure that response to small break LOCA is driven by containment parameters and not RPV parameters
c. Eliminated RCIC malfunction and changed HPCI failure from a credited malfunction to recognition of failure.
d. Added Role-Play communications
e. Changed stator water cooling malfunction from TCV failure to HX fouling
f. Added clarifying information where needed.