W3F1-2011-0021, Response to Additional Requests for Additional Information (Rais) and Revision to Cyber Security Plan: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:This document contains security-related information  To Be withheld from public disclosure per 10 CFR 2.390.
{{#Wiki_filter:Entergy Nuclear South Entergy Operations, Inc.
When separated from Attachments 1, 4, and 6 this document is decontrolled.
17265 River Road Killona, LA 70057-3093 Tel 504 739 6660 Fax 504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 Attachments Contain Information To Be Withheld from Public Disclosure per 10CFR 2.390.
 
W3F1-2011-0021 April 4, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Attachments Contain Information To Be Withheld from Public Disclosure per 10CFR 2.390.
W3F1-2011-0021  
 
April 4, 2011  
 
U.S. Nuclear Regulatory Commission  
 
Attn: Document Control Desk  
 
Washington, DC 20555  


==SUBJECT:==
==SUBJECT:==
Response to Additional Requests for Additional Information (RAIs) and Revision to the Waterford 3 Cyber Security Plan Waterford Steam Electric Station, Unit 3 (Waterford 3)  
Response to Additional Requests for Additional Information (RAIs) and Revision to the Waterford 3 Cyber Security Plan Waterford Steam Electric Station, Unit 3 (Waterford 3)
 
Docket No. 50-382 License No. NPF-38
Docket No. 50-382  
 
License No. NPF-38  


==References:==
==References:==
: 1. Entergy letter to NRC, License Amendment Request - Cyber Security Plan Withdrawal and Re-submittal , dated July 15, 2010, ML102000415 2. Entergy letter to NRC, Revision of Commitment to Supplement the Cyber Security Plan Regarding Balance-of-Plant Systems , dated November 30, 2010, ML103350177 3. Letter from Richard P. Correia (NRC) to Chris Earls (NEI) Concerning Scope of Systems, dated January 5, 2011 4. Letter from Entergy to NRC, Response to RAI on the Waterford 3 Cyber Security Plan , dated February 15, 2011, ML110470182 5. Email from NRC to Entergy, RAI on License Amendment Request, Cyber Security Plan , dated February 23, 2011, ML110540734 6. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Clarification to NEI 08-09, Revision 6 Regarding Records Retention , dated February 28, 2011 7. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Template for the Cyber Security Plan Implementation Schedule , dated February 28, 2011 8. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Cyber Security Plan Generic RAI on Records Retention , dated March 1, 2011 9. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Template for the Cyber Security Plan Implementation Schedule , dated March 1, 2011 Entergy Nuclear South Entergy Operations, Inc.  
: 1. Entergy letter to NRC, License Amendment Request - Cyber Security Plan Withdrawal and Re-submittal, dated July 15, 2010, ML102000415
: 2. Entergy letter to NRC, Revision of Commitment to Supplement the Cyber Security Plan Regarding Balance-of-Plant Systems, dated November 30, 2010, ML103350177
: 3. Letter from Richard P. Correia (NRC) to Chris Earls (NEI) Concerning Scope of Systems, dated January 5, 2011
: 4. Letter from Entergy to NRC, Response to RAI on the Waterford 3 Cyber Security Plan, dated February 15, 2011, ML110470182
: 5. Email from NRC to Entergy, RAI on License Amendment Request, Cyber Security Plan, dated February 23, 2011, ML110540734
: 6. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Clarification to NEI 08-09, Revision 6 Regarding Records Retention, dated February 28, 2011
: 7. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Template for the Cyber Security Plan Implementation Schedule, dated February 28, 2011
: 8. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Cyber Security Plan Generic RAI on Records Retention, dated March 1, 2011
: 9. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Template for the Cyber Security Plan Implementation Schedule, dated March 1, 2011 This document contains security-related information To Be withheld from public disclosure per 10 CFR 2.390.
When separated from Attachments 1, 4, and 6 this document is decontrolled.


17265 River Road
W3F1-2011-0021 Page 2 of 3
 
Killona, LA 70057-3093
 
Tel    504 739 6660
 
Fax  504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 W3F1-2011-0021 Page 2 of 3  


==Dear Sir or Madam:==
==Dear Sir or Madam:==


In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for an amendment to  
In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for an amendment to the operating license for Waterford 3, requesting NRC approval of the Waterford 3 Cyber Security Plan. In accordance with Reference 4, Entergy is revising Sections 2.1 Scope and Purpose and 4.3 Defense-In-Depth Protective Strategies, to address clarifications with respect to data diodes/air gaps and emergency plan/preparedness as described in the request for additional information (RAI) responses. Subsequent to the submittal of these RAI responses, the NRC issued additional generic RAIs on the Waterford 3 Cyber Security Plan via Reference 5. Entergys response to these RAIs is provided in Attachment 1. contains proposed marked-up the operating license page for the Physical Protection license condition for Waterford 3 to include the Waterford 3 Cyber Security Plan. contains the proposed revised operating license page. The marked-up page in  and the revised page in Attachment 3 replace, in their entirety, the pages previously submitted in Reference 1. provides a revised copy of the Waterford 3 Cyber Security Plan, Revision 0, which incorporates changes to Sections 2.1 Scope and Purpose, 4.3 Defense-In-Depth Protective Strategies, and 4.13 Document Control and Records Retention and Handling.
 
No other technical changes have been made to the Waterford 3 Cyber Security Plan. The enclosed Waterford 3 Cyber Security Plan replaces, in its entirety, the Waterford 3 Cyber Security Plan previously submitted in Reference 1. The changes discussed in this letter are clarifying or administrative and do not impact the conclusions of the no significant hazards consideration determination previously provided in Reference 1.
the operating license for Waterford 3, requesting NRC approval of the Waterford 3 Cyber Security Plan. In accordance with Reference 4, Entergy is revising Sections 2.1 "Scope and Purpose" and 4.3 "Defense-In-Depth Protective Strategies," to address clarifications with  
Entergy requests that Attachments 1, 4, and 6 which contain security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.
 
The revised commitments contained in this submittal are summarized in Attachment 5.
respect to data diodes/air gaps and emergency plan/preparedness as described in the  
Should you have any questions concerning this letter, or require additional information, please contact William Steelman, Licensing Manager, at (504) 739-6685.
 
request for additional information (RAI) responses. Subsequent to the submittal of these RAI  
 
responses, the NRC issued additional generic RAIs on the Waterford 3 Cyber Security Plan via Reference 5. Entergy's response to these RAIs is provided in Attachment 1.  
 
contains proposed marked-up the operating license page for the Physical  


Protection license condition for Waterford 3 to include the Waterford 3 Cyber Security Plan.
W3FI-201 1-0021 Page 3of3 I declare under penalty of perjury that the foregoing is true and correct. Executed on April 4, 2011.
Attachment 3 contains the proposed revised operating license page. The marked-up page in and the revised page in Attachment 3 replace, in their entirety, the pages
Sincerely, 4
 
JAK/4DW Attachments: 1. Response to Requests for Additional Information (contains SRI)
previously submitted in Reference 1.
: 2. Proposed Waterford 3 Operating License Change (mark-up)
 
: 3. Revised Waterford 3 Operating License Page
provides a revised copy of the Waterford 3 Cyber Security Plan , Revision 0, which incorporates changes to Sections 2.1 "Scope and Purpose," 4.3 "Defense-In-Depth
: 4. Cyber Security Plan Implementation Schedule (contains SRI)
 
: 5. List of Regulatory Commitments
Protective Strategies," and 4.13 "Document Control and Records Retention and Handling." 
: 6. Revised Waterford 3 Cyber Security Plan (contains SRI) cc:     Mr. Elmo E. Collins, Jr.
 
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance Emergency and Radiological Services Division P. 0. Box 4312 Baton Rouge, LA 70821-4312 Ji.WiIeyLA.gov}}
No other technical changes have been made to the Waterford 3 Cyber Security Plan. The enclosed Waterford 3 Cyber Security Plan replaces, in its entirety, the Waterford 3 Cyber Security Plan previously submitted in Reference 1. The changes discussed in this letter are clarifying or administrative and do not impact the conclusions of the no significant hazards
 
consideration determination previously provided in Reference 1.
 
Entergy requests that Attachments 1, 4, and 6 which contain security-related
 
information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.
 
The revised commitments contained in this submittal are summarized in Attachment 5. 
 
Should you have any questions concerning this letter, or require additional information, please contact William Steelman, Licensing Manager, at (504) 739-6685.
W3FI-201 1-0021 Page 3of3 I declare under penalty of perjury that the foregoing is true and correct.Executed on April 4, 2011.Sincerely, 4 JAK/4DW Attachments:
1.Response to Requests for Additional Information (contains SRI)2.Proposed Waterford 3 Operating License Change (mark-up)3.Revised Waterford 3 Operating License Page 4.Cyber Security Plan Implementation Schedule (contains SRI)5.List of Regulatory Commitments 6.Revised Waterford 3 Cyber Security Plan (contains SRI)cc: Mr.Elmo E.Collins, Jr.Regional Administrator U.S.Nuclear Regulatory Commission Region IV 612 E.Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O.Box 822 Killona, LA 70066-0751 U.S.Nuclear Regulatory Commission Attn: Mr.N.Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance Emergency and Radiological Services Division P.0.Box 4312 Baton Rouge, LA 70821-4312 Ji.WiIeyLA.gov}}

Latest revision as of 02:17, 13 November 2019

Response to Additional Requests for Additional Information (Rais) and Revision to Cyber Security Plan
ML110950122
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/04/2011
From: Kowalewski J
Entergy Nuclear Operations, Entergy Nuclear South
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML110950119 List:
References
W3F1-2011-0021
Download: ML110950122 (3)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504 739 6660 Fax 504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 Attachments Contain Information To Be Withheld from Public Disclosure per 10CFR 2.390.

W3F1-2011-0021 April 4, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Response to Additional Requests for Additional Information (RAIs) and Revision to the Waterford 3 Cyber Security Plan Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

References:

1. Entergy letter to NRC, License Amendment Request - Cyber Security Plan Withdrawal and Re-submittal, dated July 15, 2010, ML102000415
2. Entergy letter to NRC, Revision of Commitment to Supplement the Cyber Security Plan Regarding Balance-of-Plant Systems, dated November 30, 2010, ML103350177
3. Letter from Richard P. Correia (NRC) to Chris Earls (NEI) Concerning Scope of Systems, dated January 5, 2011
4. Letter from Entergy to NRC, Response to RAI on the Waterford 3 Cyber Security Plan, dated February 15, 2011, ML110470182
5. Email from NRC to Entergy, RAI on License Amendment Request, Cyber Security Plan, dated February 23, 2011, ML110540734
6. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Clarification to NEI 08-09, Revision 6 Regarding Records Retention, dated February 28, 2011
7. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Template for the Cyber Security Plan Implementation Schedule, dated February 28, 2011
8. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Cyber Security Plan Generic RAI on Records Retention, dated March 1, 2011
9. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Template for the Cyber Security Plan Implementation Schedule, dated March 1, 2011 This document contains security-related information To Be withheld from public disclosure per 10 CFR 2.390.

When separated from Attachments 1, 4, and 6 this document is decontrolled.

W3F1-2011-0021 Page 2 of 3

Dear Sir or Madam:

In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for an amendment to the operating license for Waterford 3, requesting NRC approval of the Waterford 3 Cyber Security Plan. In accordance with Reference 4, Entergy is revising Sections 2.1 Scope and Purpose and 4.3 Defense-In-Depth Protective Strategies, to address clarifications with respect to data diodes/air gaps and emergency plan/preparedness as described in the request for additional information (RAI) responses. Subsequent to the submittal of these RAI responses, the NRC issued additional generic RAIs on the Waterford 3 Cyber Security Plan via Reference 5. Entergys response to these RAIs is provided in Attachment 1. contains proposed marked-up the operating license page for the Physical Protection license condition for Waterford 3 to include the Waterford 3 Cyber Security Plan. contains the proposed revised operating license page. The marked-up page in and the revised page in Attachment 3 replace, in their entirety, the pages previously submitted in Reference 1. provides a revised copy of the Waterford 3 Cyber Security Plan, Revision 0, which incorporates changes to Sections 2.1 Scope and Purpose, 4.3 Defense-In-Depth Protective Strategies, and 4.13 Document Control and Records Retention and Handling.

No other technical changes have been made to the Waterford 3 Cyber Security Plan. The enclosed Waterford 3 Cyber Security Plan replaces, in its entirety, the Waterford 3 Cyber Security Plan previously submitted in Reference 1. The changes discussed in this letter are clarifying or administrative and do not impact the conclusions of the no significant hazards consideration determination previously provided in Reference 1.

Entergy requests that Attachments 1, 4, and 6 which contain security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

The revised commitments contained in this submittal are summarized in Attachment 5.

Should you have any questions concerning this letter, or require additional information, please contact William Steelman, Licensing Manager, at (504) 739-6685.

W3FI-201 1-0021 Page 3of3 I declare under penalty of perjury that the foregoing is true and correct. Executed on April 4, 2011.

Sincerely, 4

JAK/4DW Attachments: 1. Response to Requests for Additional Information (contains SRI)

2. Proposed Waterford 3 Operating License Change (mark-up)
3. Revised Waterford 3 Operating License Page
4. Cyber Security Plan Implementation Schedule (contains SRI)
5. List of Regulatory Commitments
6. Revised Waterford 3 Cyber Security Plan (contains SRI) cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance Emergency and Radiological Services Division P. 0. Box 4312 Baton Rouge, LA 70821-4312 Ji.WiIeyLA.gov