| {{#Wiki_filter:0 FPL. APR 2 0 2011 POWERING TODAY.EMPOWERING TOMORROW.0 L-201 1-146 US Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Florida Power & Light Company Turkey Point Unit 4 Docket No. 50-251 | | {{#Wiki_filter:0FPL. |
| | POWERING TODAY. |
| | APR 2 0 2011 EMPOWERING TOMORROW.0 L-201 1-146 US Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Florida Power & Light Company Turkey Point Unit 4 Docket No. 50-251 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Plan for Revision of Previously Submitted Information for Generic Letter 2004-02 | | Plan for Revision of Previously Submitted Information for Generic Letter 2004-02 |
|
| |
|
| ==References:== | | ==References:== |
| | (1) Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated September 13, 2004 (ML042360586) |
| | (2) Updated Supplemental Response to NRC Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated August 11, 2008 (ML082380244) |
| | (3) Staff Requirements Memorandum (SRM) SECY- 10-0113 - "Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance." |
| | The NRC requested, via Reference 1, that licensees perform an evaluation of the emergency core cooling system (ECCS) and containment spray system (CSS) recirculation functions based on the identified potential susceptibility of sump screens to debris blockage during design basis accidents requiring recirculation. This concern is also identified by the NRC as Generic Safety Issue 191 (GSI-19 1). |
| | Subsequent to the issuance of Reference 1, Florida Power & Light Company (FPL) has taken significant actions to minimize the potential for recirculation sump blockage such as installing a vastly enlarged strainer system (an increase from 63ft2 to -3,600 ft2 ) and implementing additional compensatory measures including improvements in Emergency Operating Procedures and Operator training. By letter dated August 11, 2008 (Reference 2), FPL provided analysis and testing results for Unit 4 based on the best available information at the time which FPL believed to be sufficient for closure of GSI- 191 at Turkey Point. |
| | an FPL Group company |
|
| |
|
| (1) Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated September 13, 2004 (ML042360586)
| | L-2011-146 Page 2 of 2 However, continuing interaction between NRC Staff and the industry, including FPL, has resulted in a consensus understanding that further work remains before the industry and Staff reach agreement on a path forward for final resolution of the issues raised in Reference 1. Consequently, the Commission, by way of Reference 3, challenged the industry to complete additional testing and analyses in 2011 to support development of resolution plans by mid-year 2012. |
| (2) Updated Supplemental Response to NRC Generic Letter 2004-02,"Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated August 11, 2008 (ML082380244)
| | FPL continues to work with industry to seek final resolution of GSI-191 and is participating in testing and analyses initiatives pursuant to Reference 3. |
| (3) Staff Requirements Memorandum (SRM) SECY- 10-0113 -"Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance." The NRC requested, via Reference 1, that licensees perform an evaluation of the emergency core cooling system (ECCS) and containment spray system (CSS)recirculation functions based on the identified potential susceptibility of sump screens to debris blockage during design basis accidents requiring recirculation.
| | As discussed with Mr. Jason Paige and other members of the NRC staff April 6, 2011 detailed validation work inside the containment of Turkey Point Unit 4 during the current refueling outage identified fibrous insulation materials that are different from the materials used as inputs to the previous testing and analyses results which were submitted in Reference 2. FPL has completed an evaluation of this discovery and has determined that there remains reasonable assurance the emergency core cooling system (ECCS) is capable of providing long term core cooling and that the specified safety function is expected to perform as designed, tested, and maintained. This determination is documented in FPL's corrective action program. |
| This concern is also identified by the NRC as Generic Safety Issue 191 (GSI-19 1).Subsequent to the issuance of Reference 1, Florida Power & Light Company (FPL) has taken significant actions to minimize the potential for recirculation sump blockage such as installing a vastly enlarged strainer system (an increase from 63ft 2 to -3,600 ft 2) and implementing additional compensatory measures including improvements in Emergency Operating Procedures and Operator training.
| | FPL will develop a path forward for Turkey Point Unit 4 consistent with the schedule and results of industry testing and analyses (Reference 3). The path forward will incorporate plant-specific considerations including the evaluation and analyses of insulation types, quantities and locations and, as applicable, plans for insulation mitigation and strainer testing. Once these efforts are completed, FPL will amend its August 11, 2008 submittal to reflect this revised consensus approach. |
| By letter dated August 11, 2008 (Reference 2), FPL provided analysis and testing results for Unit 4 based on the best available information at the time which FPL believed to be sufficient for closure of GSI- 191 at Turkey Point.an FPL Group company L-2011-146 Page 2 of 2 However, continuing interaction between NRC Staff and the industry, including FPL, has resulted in a consensus understanding that further work remains before the industry and Staff reach agreement on a path forward for final resolution of the issues raised in Reference
| | Should you have any questions regarding this submittal, please contact Mr. Robert J. |
| : 1. Consequently, the Commission, by way of Reference 3, challenged the industry to complete additional testing and analyses in 2011 to support development of resolution plans by mid-year 2012.FPL continues to work with industry to seek final resolution of GSI-191 and is participating in testing and analyses initiatives pursuant to Reference 3.As discussed with Mr. Jason Paige and other members of the NRC staff April 6, 2011 detailed validation work inside the containment of Turkey Point Unit 4 during the current refueling outage identified fibrous insulation materials that are different from the materials used as inputs to the previous testing and analyses results which were submitted in Reference
| | Tomonto, Licensing Manager, at (305) 246-7327. |
| : 2. FPL has completed an evaluation of this discovery and has determined that there remains reasonable assurance the emergency core cooling system (ECCS) is capable of providing long term core cooling and that the specified safety function is expected to perform as designed, tested, and maintained.
| | Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant}} |
| This determination is documented in FPL's corrective action program.FPL will develop a path forward for Turkey Point Unit 4 consistent with the schedule and results of industry testing and analyses (Reference 3). The path forward will incorporate plant-specific considerations including the evaluation and analyses of insulation types, quantities and locations and, as applicable, plans for insulation mitigation and strainer testing. Once these efforts are completed, FPL will amend its August 11, 2008 submittal to reflect this revised consensus approach.Should you have any questions regarding this submittal, please contact Mr. Robert J.Tomonto, Licensing Manager, at (305) 246-7327.Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant}} | |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
0FPL.
POWERING TODAY.
APR 2 0 2011 EMPOWERING TOMORROW.0 L-201 1-146 US Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Florida Power & Light Company Turkey Point Unit 4 Docket No. 50-251
Subject:
Plan for Revision of Previously Submitted Information for Generic Letter 2004-02
References:
(1) Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated September 13, 2004 (ML042360586)
(2) Updated Supplemental Response to NRC Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," dated August 11, 2008 (ML082380244)
(3) Staff Requirements Memorandum (SRM) SECY- 10-0113 - "Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance."
The NRC requested, via Reference 1, that licensees perform an evaluation of the emergency core cooling system (ECCS) and containment spray system (CSS) recirculation functions based on the identified potential susceptibility of sump screens to debris blockage during design basis accidents requiring recirculation. This concern is also identified by the NRC as Generic Safety Issue 191 (GSI-19 1).
Subsequent to the issuance of Reference 1, Florida Power & Light Company (FPL) has taken significant actions to minimize the potential for recirculation sump blockage such as installing a vastly enlarged strainer system (an increase from 63ft2 to -3,600 ft2 ) and implementing additional compensatory measures including improvements in Emergency Operating Procedures and Operator training. By letter dated August 11, 2008 (Reference 2), FPL provided analysis and testing results for Unit 4 based on the best available information at the time which FPL believed to be sufficient for closure of GSI- 191 at Turkey Point.
an FPL Group company
L-2011-146 Page 2 of 2 However, continuing interaction between NRC Staff and the industry, including FPL, has resulted in a consensus understanding that further work remains before the industry and Staff reach agreement on a path forward for final resolution of the issues raised in Reference 1. Consequently, the Commission, by way of Reference 3, challenged the industry to complete additional testing and analyses in 2011 to support development of resolution plans by mid-year 2012.
FPL continues to work with industry to seek final resolution of GSI-191 and is participating in testing and analyses initiatives pursuant to Reference 3.
As discussed with Mr. Jason Paige and other members of the NRC staff April 6, 2011 detailed validation work inside the containment of Turkey Point Unit 4 during the current refueling outage identified fibrous insulation materials that are different from the materials used as inputs to the previous testing and analyses results which were submitted in Reference 2. FPL has completed an evaluation of this discovery and has determined that there remains reasonable assurance the emergency core cooling system (ECCS) is capable of providing long term core cooling and that the specified safety function is expected to perform as designed, tested, and maintained. This determination is documented in FPL's corrective action program.
FPL will develop a path forward for Turkey Point Unit 4 consistent with the schedule and results of industry testing and analyses (Reference 3). The path forward will incorporate plant-specific considerations including the evaluation and analyses of insulation types, quantities and locations and, as applicable, plans for insulation mitigation and strainer testing. Once these efforts are completed, FPL will amend its August 11, 2008 submittal to reflect this revised consensus approach.
Should you have any questions regarding this submittal, please contact Mr. Robert J.
Tomonto, Licensing Manager, at (305) 246-7327.
Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant