{{#Wiki_filter:Public Meeting with Nuclear Regulatory Commission and Tennessee Valley AuthorityJune 20, 2011 Inspection Program ElementsPreviouslyCompletedinspections Allegations Historical Open items(VIO,NCV,IFI..)
{{#Wiki_filter:Public Meeting with Nuclear Regulatory Commission and Tennessee Valley Authority June 20, 2011 Enclosure 3
Inspection Program GenericCommunicationsNew Orre-work CAPs/SPs Licensing issues Status of Inspection Program*Over 500 construction inspection items in the Inspection Planning and Scheduling (IP&S) *Completed inspections for 79IP&S itemsMhIP&Siidbddiil
 
*M any ot h er IP&S i tems i nspecte d , b ut a ddi t i ona l effort required to close the item*Completed inspections for 2 CAPs, 5 CAP sub-issues and 4 SPs Status of Inspection Program*Many of the 500 IP&S items are historical that TVA previously addressed; Close-out inspection involves verifying proper resolution  
Inspection Program Elements Historical Open items Previously (VIO,NCV,IFI..)
*StartedPreOperationaltestinginspections(IMC
Completed                              Allegations inspections Inspection Generic                Program                 Licensing Communications                                      issues New Or              CAPs/SPs re-work
*Started Pre-Operational testing inspections (IMC 2513); these inspections will increase as TVA completes construction on more safety systems}}
 
Status of Inspection Program
* Over 500 construction inspection items in the Inspection Planning and Scheduling (IP&S)
* Completed inspections for 79 IP&S items
* Many M       other h IP&S iitems iinspected, d b but additional ddi i   l effort required to close the item
* Completed inspections for 2 CAPs, 5 CAP sub-issues and 4 SPs
 
Status of Inspection Program
* Many of the 500 IP&S items are historical that TVA previously addressed; Close-out inspection involves verifying proper resolution
* Started Pre-Operational Pre Operational testing inspections (IMC 2513); these inspections will increase as TVA completes construction on more safety systems}}

Latest revision as of 18:00, 12 November 2019

Enclosure 3, 06/20/2011 Public Meeting with Nuclear Regulatory Commission and Tennessee Valley Authority
ML111810550
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/20/2011
From:
NRC/RGN-II
To:
References
Download: ML111810550 (4)


Text

Public Meeting with Nuclear Regulatory Commission and Tennessee Valley Authority June 20, 2011 Enclosure 3

Inspection Program Elements Historical Open items Previously (VIO,NCV,IFI..)

Completed Allegations inspections Inspection Generic Program Licensing Communications issues New Or CAPs/SPs re-work

Status of Inspection Program

  • Over 500 construction inspection items in the Inspection Planning and Scheduling (IP&S)
  • Completed inspections for 79 IP&S items
  • Many M other h IP&S iitems iinspected, d b but additional ddi i l effort required to close the item
  • Completed inspections for 2 CAPs, 5 CAP sub-issues and 4 SPs

Status of Inspection Program

  • Many of the 500 IP&S items are historical that TVA previously addressed; Close-out inspection involves verifying proper resolution
  • Started Pre-Operational Pre Operational testing inspections (IMC 2513); these inspections will increase as TVA completes construction on more safety systems