ML112010414: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/21/2011 | | issue date = 07/21/2011 | ||
| title = Staff Review of Braidwood Nuclear Power Plant Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation | | title = Staff Review of Braidwood Nuclear Power Plant Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation | ||
| author name = Wastler S | | author name = Wastler S | ||
| author affiliation = NRC/NSIR/DSP/DDMS/MWISB | | author affiliation = NRC/NSIR/DSP/DDMS/MWISB | ||
| addressee name = Benner E | | addressee name = Benner E | ||
| addressee affiliation = NRC/NMSS/SFST/LID/RIOB | | addressee affiliation = NRC/NMSS/SFST/LID/RIOB | ||
| docket = 05000456, 05000457, 07200073 | | docket = 05000456, 05000457, 07200073 | ||
Line 14: | Line 14: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:July 21, 2011 MEMORANDUM TO: Eric Benner, Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Chief /RA/ | |||
Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response | |||
==SUBJECT:== | |||
STAFF REVIEW OF THE BRAIDWOOD NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On June 22, 2011, a Security Inspection conducted by Eugenio Bonano, Health Physicist, Region III, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the Braidwood Nuclear Power Plant has successfully met the objectives outlined in the U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP 81311). The Inspection Report numbers for this report are 050004564/2011405, 050004574/2011405, and 00073/2011401. | |||
Based on staffs review of the Braidwood Physical Security Plan (PSP), we determined the Braidwood PSP (Rev. 10) has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, and the Additional Security Measures imposed by NRC Order EA-2010-050, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Braidwood Station ISFSI, dated June 9, 2010. | |||
CONTACT: Jeff Riley, NSIR/DSP 301-415-6996 Doug Garner, NSIR/DSP 301-415-6786 | |||
ML112010414 OFFICE: NSIR/DSP/MWISB NSIR/DSP/MWISB NSIR/DSP/MWISB NAME: JRiley DGarner SWastler DATE: 7/15/2011 7/15/2011 7/21/2011}} |
Latest revision as of 17:15, 12 November 2019
ML112010414 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 07/21/2011 |
From: | Wastler S NRC/NSIR/DSP/DDMS/MWISB |
To: | Eric Benner NRC/NMSS/SFST/LID/RIOB |
Riley, Jeffrey, NSIR/DSP | |
References | |
IR-11-401, IR-11-405 | |
Download: ML112010414 (2) | |
Text
July 21, 2011 MEMORANDUM TO: Eric Benner, Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Chief /RA/
Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF THE BRAIDWOOD NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On June 22, 2011, a Security Inspection conducted by Eugenio Bonano, Health Physicist, Region III, verified that the Independent Spent Fuel Storage Installation (ISFSI) located at the Braidwood Nuclear Power Plant has successfully met the objectives outlined in the U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP 81311). The Inspection Report numbers for this report are 050004564/2011405, 050004574/2011405, and 00073/2011401.
Based on staffs review of the Braidwood Physical Security Plan (PSP), we determined the Braidwood PSP (Rev. 10) has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, and the Additional Security Measures imposed by NRC Order EA-2010-050, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Braidwood Station ISFSI, dated June 9, 2010.
CONTACT: Jeff Riley, NSIR/DSP 301-415-6996 Doug Garner, NSIR/DSP 301-415-6786
ML112010414 OFFICE: NSIR/DSP/MWISB NSIR/DSP/MWISB NSIR/DSP/MWISB NAME: JRiley DGarner SWastler DATE: 7/15/2011 7/15/2011 7/21/2011