| number = ML11209B829
| number = ML11209B829
| issue date = 07/28/2011
| issue date = 07/28/2011
| title = Project - Notification of Inspection (NRC Inspection Report 05000499-11-005 & 05000498-11-005) and Request for Information
| title = Notification of Inspection (NRC Inspection Report 05000499-11-005 & 05000498-11-005) and Request for Information
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000498/2011005]]
See also: [[see also::IR 05000498/2011005]]


=Text=
=Text=
{{#Wiki_filter:Mr. Halpin
{{#Wiki_filter:Mr. Halpin
    July 28, 2011
                                                UNITED STATES
  Mr. Edward D. Halpin
                                NUCLEAR REGULATORY COMMISSION
President and
                                                  REGI ON I V
Chief Executive Officer
                                        612 EAST LAMAR BLVD, SUITE 400
STP Nuclear Operating Company
                                        ARLINGTON, TEXAS 76011-4125
P.O. Box 289
                                            July 28, 2011
Wadsworth, TX
Mr. Edward D. Halpin
  77483  SUBJECT: SOUTH TEXAS PROJECT
President and
- NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT
Chief Executive Officer
050498;050499/2011005) AND REQUEST FOR INFORMATION
STP Nuclear Operating Company
  Dear Mr.Halpin:
P.O. Box 289
From September 12 through September 16 , inspectors
Wadsworth, TX 77483
from the Nuclear Regulatory Commission's
SUBJECT:       SOUTH TEXAS PROJECT - NOTIFICATION OF INSPECTION (NRC
(NRC) Region
                INSPECTION REPORT 050498;050499/2011005) AND REQUEST FOR
IV office will perform the baseline biennial requalification
                INFORMATION
inspection at South Texas Project Unit 1 and Unit 2
Dear Mr.Halpin:
using NRC Inspection
From September 12 through September 16, inspectors from the Nuclear Regulatory
Procedure 71111.11B, "Licensed Operator Requalification Program.Experience has shown that this inspection is  
Commissions (NRC) Region IV office will perform the baseline biennial requalification
a resource intensive inspection both for the NRC inspectors
inspection at South Texas Project Unit 1 and Unit 2 using NRC Inspection
and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Sectio
Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown
n A of the enclosure) identifies
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.
information to be provided one week prior to the
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
onsite inspection week to ensure that the inspectors
we have enclosed a request for documents needed for this inspection. These documents have
are adequately prepared. The second group (Section
been divided into two groups. The first group (Section A of the enclosure) identifies information
B of the enclosure) identifies the information that the inspectors
to be provided one week prior to the onsite inspection week to ensure that the inspectors are
will need upon
adequately prepared. The second group (Section B of the enclosure) identifies the information
arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
that the inspectors will need upon arrival at the site. It is important that all of these documents
  We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mrs. Robyn Savage
are up to date and complete in order to minimize the number of additional documents requested
of your licensing
during the preparation and/or the onsite portions of the inspection.
organization.
We have discussed the schedule for these inspection activities with your staff and understand
  Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector
that our regulatory contact for this inspection will be Mrs. Robyn Savage of your licensing
Kelly Clayton at (817) 860
organization. Our inspection dates are subject to change based on your updated schedule of
-8216 (Kelly.clayton@nrc.gov
examination activities. If there are any questions about this inspection or the material
) or Steve Garchow
requested, please contact the lead inspector Kelly Clayton at (817) 860-8216
at (817) 276-4426 (Steve.garchow@nrc.gov
(Kelly.clayton@nrc.gov) or Steve Garchow at (817) 276-4426 (Steve.garchow@nrc.gov ).
). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44
This letter does not contain new or amended information collection requirements subject to the
U.S.C. 3501 et seq.).
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
  Existing information collection requirements were approved by the Office of Management and Budget, control number
requirements were approved by the Office of Management and Budget, control number 3150-
3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 12 EAST LAMAR BLVD
 
, S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4125 
request for information or an information collection requirement unless the requesting document
  - 1 - Enclosure request for information or an information collection requirement
displays a currently valid Office of Management and Budget control number.
unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
  In accordance with 10
enclosure will be available electronically for public inspection in the NRC Public Document
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html
Room or from the Publicly Available Records (PARS) component of NRCs document
(the Public Electronic Reading Room).
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
  Sincerely,   /RA/
rm/adams.html (the Public Electronic Reading Room).
Mark S. Haire, Chief Operations Branch  
                                                        Sincerely,
  Division of Reactor Safety
                                                        /RA/
  Docket s:   50-498 and 50
                                                        Mark S. Haire, Chief
-499 Licenses: NPF
                                                        Operations Branch
-76 and NPF
                                                        Division of Reactor Safety
-80 Enclosure:
Dockets: 50-498 and 50-499
Inservice Inspection Document Request Distribution via ListServ for South Texas Project
Licenses: NPF-76 and NPF-80
 
Enclosure:
 
Inservice Inspection Document Request
  - 2 - Enclosure Electronic distribution by RIV:
Distribution via ListServ for South Texas Project
Regional Administrator (Elmo.Collins@nrc.gov
                                            -1-                                     Enclosure
Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov
 
Acting DRP Deputy Director (Jeff.Clark@nrc.gov
Electronic distribution by RIV:
DRS Director (Anton.Vegel@nrc.gov
Regional Administrator (Elmo.Collins@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Robert.Caldwell@nrc.gov
Deputy Regional Administrator (Art.Howell@nrc.gov)
Senior Resident Inspector (John.Dixon@nrc.gov
DRP Director (Kriss.Kennedy@nrc.gov)
Resident Inspector (Binesh.Tharakan@nrc.gov
Acting DRP Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov
DRS Director (Anton.Vegel@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov
DRS Deputy Director (Tom.Blount@nrc.gov)
Project Engineer, DRP/A (Christopher.Henderson@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov
Acting DRS Deputy Director (Robert.Caldwell@nrc.gov)
) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Balwant.Singal@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov
Senior Resident Inspector (John.Dixon@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource  
Resident Inspector (Binesh.Tharakan@nrc.gov)
 
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Christopher.Henderson@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
ROPreports
  Only inspection reports to the following:
Only inspection reports to the following:
RIV/ETA: OEDO
RIV/ETA: OEDO (John.McHale@nrc.gov)
(John.McHale@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)       S:\DRS\REPORTS\Reports Draft
DRS/TSB STA (Dale.Powers@nrc.gov)
\ST 2011005 RFI LTR                               MLXXXXXXXXXX
S:\DRS\REPORTS\Reports Draft\ST 2011005 RFI LTR                       MLXXXXXXXXXX
  ADAMS  No  Yes  SUNSI Review Complete
  ADAMS         No Yes  SUNSI Review Complete                   Reviewer Initials: KDC
Reviewer Initials: KDC
  Category B.1       Publicly Available             Non-sensitive
  Category B.1
Category A         Non-publicly Available         Sensitive
  Publicly Available
SOE: OB               C: OB
  Non-sensitive Category A
KClayton             SGarchow for
  Non-publicly Available
                      MHaire
  Sensitive SOE: OB C: OB   KClayton SGarchow for  
7/25/2011             7/28/2011
MHaire   7/25/2011 7/28/2011   OFFICIAL RECORD COPY  
OFFICIAL RECORD COPY                     -2-      T=Telephone       E=E-mail Enclosure
T=Telephone           E=E
                                                                                      F=Fax
-mail       F=Fax
 
 
              BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
  - 1 - Enclosure  BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
From: Kelly Clayton
  From: Kelly Clayton
        Senior Operations Engineer, NRC RIV
Senior Operations Engineer, NRC RIV
        817-860-8216
817-860-8216 To: Tim Hurley
To:     Tim Hurley
Requal Supervisor, STP 361-972-8568
        Requal Supervisor, STP
Subj: Information Request to Support September 12
        361-972-8568
-16, Licensed Operator Requalification Program Inspection (IP 71111.11B)
Subj: Information Request to Support September 12-16, Licensed Operator Requalification
  A. The following information is requested in order to support inspection preparation activities. These
        Program Inspection (IP 71111.11B)
items are listed by section as they appear in the inspection module (ie 2.02, 2.04, etc). Requested materials should be sent either electronically or hardcopy in order to arrive at the Region IV office no later than September 6, 2011.  Electronically: To
A. The following information is requested in order to support inspection preparation
: Kelly.Clayton@nrc.gov
    activities. These items are listed by section as they appear in the inspection module
(lead inspector
    (ie 2.02, 2.04, etc). Requested materials should be sent either electronically or
Cc: Steve.Garchow@nrc.gov
    hardcopy in order to arrive at the Region IV office no later than September 6, 2011.
(inspector
    *   Electronically: To: Kelly.Clayton@nrc.gov (lead inspector)
)   Hardcopy to:
                        Cc: Steve.Garchow@nrc.gov (inspector)
US Nuclear Regulatory Commission, Region IV
    *   Hardcopy to: US Nuclear Regulatory Commission, Region IV
612 E. Lamar Blvd, Suite 4
                        612 E. Lamar Blvd, Suite 400
00 Arlington, TX 76011
                        Arlington, TX 76011
ATTN: Kelly Clayton
                        ATTN: Kelly Clayton
  02.03: Facility Operating History
    02.03: Facility Operating History
  List of LER's since last biennial requal inspection (BRQ)
        * List of LERs since last biennial requal inspection (BRQ)
  List of CR's since last biennial requal inspection
        *  List of CRs since last biennial requal inspection
  02.04: Licensee Requal Exam
    02.04: Licensee Requal Exams / 02.09: Written Exam and Op Test Results
/ 02.09: Written Exam and Op Test Results Current requalification cycle written examinations (SRO & RO) and results
        * Current requalification cycle written examinations (SRO & RO) and results
  Current requalification cycle operating tests (SRO & RO) and results through August 26, 2011.  Current requalification cycle examination methodology (sample plan)
        *  Current requalification cycle operating tests (SRO & RO) and results through August
  All portions of the UFSAR that identify operator response times
            26, 2011.
  02.05: Licensee Admin of Requal Exams
        *   Current requalification cycle examination methodology (sample plan)
  Schedule of operating tests (JPMs & scenarios) for week of September 12.
        *  All portions of the UFSAR that identify operator response times
 
    02.05: Licensee Admin of Requal Exams
  - 2 - Enclosure Operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given week of September 12.
        * Schedule of operating tests (JPMs & scenarios) for week of September 12.
   List of licensed operators (SRO & RO) by crew (operating & staff)
                                              -1-                                   Enclosure
   Training and Operations Department organization charts (with qualified LOR evaluators identified)
 
   All procedures that describe conduct of simulator training
  *  Operating tests (JPMs & scenarios) (password protected and provide separately via
   All Procedures used to test, operate, and maintain the simulator
      telephone at later date) to be given week of September 12.
   All Procedures that describe examination security, including guidelines on overlap  
   List of licensed operators (SRO & RO) by crew (operating & staff)
between examinations in current exam cycle tests and prior year examinations
   Training and Operations Department organization charts (with qualified LOR
   List of all examination security problems since last BRQ
      evaluators identified)
inspection
   All procedures that describe conduct of simulator training
  02.06: Licensee Feedback System
   All Procedures used to test, operate, and maintain the simulator
  Procedures that identify process for revising and maintaining LO continuing training program up to date
   All Procedures that describe examination security, including guidelines on overlap
   List of outstanding LOR program changes
      between examinations in current exam cycle tests and prior year examinations
   List of plant events and industry operating experience incorporated into LOR program since last BRQ
   List of all examination security problems since last BRQ inspection
   Audits and/or self
02.06: Licensee Feedback System
-assessment reports addressing the licensed operator requalification training program
  * Procedures that identify process for revising and maintaining LO continuing training
  02.07: Licensee Remedial Training Program
      program up to date
  List of remedial training conducted or planned since last requal exams (includes  
   List of outstanding LOR program changes
training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam cycle)  Remediation plans (lesson plans, reference materials, and attendance documentation)
   List of plant events and industry operating experience incorporated into LOR
  02.08: Conformance with Operator License Conditions
      program since last BRQ
  All Procedures and Program documentation for maintaining active operator licenses and ensuring medical fitness of licensed operators
   Audits and/or self-assessment reports addressing the licensed operator
   All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since last BRQ
      requalification training program
 
02.07: Licensee Remedial Training Program
 
  * List of remedial training conducted or planned since last requal exams (includes
   - 3 - Enclosure 02.11: Conformance with Simulator Requirements
      training provided to operators to enable passing requal exams and training provided
  For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages and shall be complete with test  
      to correct generic or individual weaknesses observed during previous requal exam
procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write
      cycle)
-up for any differences beyond the ANSI 3.5 standard requirements. The team lead should pick samples from the list in the ANSI 3.5 standard as deemed appropriate for the inspection. A few examples are listed  
  *   Remediation plans (lesson plans, reference materials, and attendance
below: o Transient test 1, Manual Rx trip  
      documentation)
o Transient test 6, Main turbine trip (max power level with no immediate reactor trip). o Steady State tests for 50 percent power and 100 percent power
02.08: Conformance with Operator License Conditions
  All Simulator Management and Configuration Procedures.
  * All Procedures and Program documentation for maintaining active operator licenses
  Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between August 2009 and August 2011.   Malfunction Tests for Stuck open PORV and Main Feed Line Break. If these are included in an SBT package then the review of that package would be acceptable.
      and ensuring medical fitness of licensed operators
  MTC and IRW tests as part of
   All Procedures and associated documentation that supports reactivation of any
primary parameters tested in order to
      SRO/RO license (operating or staff crew) since last BRQ
verify core physics parameters. The applicable reference graphs from the Plant physics data book (electronic or other means as available) should
                                        -2-                                      Enclosure
also be included as well as the test procedures used and the acceptance criteria with results for the
 
se two samples.   B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to
   02.11: Conformance with Simulator Requirements
the inspection team, either electronically or hardcopy, upon site arrival on September 12, 2011.
      * For the following cases, send the most recent transient test packages, which may be
  02.04: Licensee Requal Exam
          electronic or in paper single test packages and shall be complete with test
/ 02.09: Written Exam and Op Test Results
          procedures for each test, the acceptance criteria, and results. For each transient test,
  All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after  
          the reference chart should be included or an equivalent subject matter expert review
onsite week
          versus the simulator results with a write-up for any differences beyond the ANSI 3.5
  02.08: Conformance with Operator License Conditions
          standard requirements. The team lead should pick samples from the list in the ANSI
  Access to licensed operators' records (operating and staff crews)
          3.5 standard as deemed appropriate for the inspection. A few examples are listed
  Access to licensed operators' training attendance records
          below:
   Access to licensed operators' medical records
          o Transient test 1, Manual Rx trip
  02.11: Conformance
          o Transient test 6, Main turbine trip (max power level with no immediate reactor
with Simulator Requirements
                  trip).
  Simulator discrepancies (DR's) from August 2009 and August 2011. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.
          o Steady State tests for 50 percent power and 100 percent power
 
      *  All Simulator Management and Configuration Procedures.
  - 4 - Enclosure Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).
      *  Simulator Discrepancy Report summary list for all open DRs. For closed DRs,
  Documentation that validates current models, including the thermal
          summary list for those items closed between August 2009 and August 2011.
-hydraulics and neutronics models, to the actual plant.  
      *  Malfunction Tests for Stuck open PORV and Main Feed Line Break. If these are
  All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)
          included in an SBT package then the review of that package would be acceptable.
  Summary list of modifications from August 2009 and August 2011
      *  MTC and IRW tests as part of primary parameters tested in order to verify core
Plant Modifications (both hardware and software) completed on the Simulator by due date from August 2009 and August 2011
          physics parameters. The applicable reference graphs from the Plant physics data
Simulator Differences Lesson plan used in training (current to August 30, 2011
          book (electronic or other means as available) should also be included as well as the
).   The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write
          test procedures used and the acceptance criteria with results for these two samples.
-up for any differences beyond the ANSI standard requirements.
B. The following information is requested in order to support the onsite inspection
  All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and  
  activities. Requested materials should be available to the inspection team, either
the acceptance criteria with results.
  electronically or hardcopy, upon site arrival on September 12, 2011.
  All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.
  02.04: Licensee Requal Exams / 02.09: Written Exam and Op Test Results
  Current copy of ANSI 3.5 standard you are committed to for Simulator testing.
      * All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after
 
          onsite week
02.1X: Corrective Actions related to Operator errors
  02.08: Conformance with Operator License Conditions
All condition reports related to operator actions/errors in control
      * Access to licensed operators records (operating and staff crews)
room
      *  Access to licensed operators training attendance records
      *   Access to licensed operators medical records
  02.11: Conformance with Simulator Requirements
      * Simulator discrepancies (DRs) from August 2009 and August 2011. This should
          include all open DRs and DRs that have been closed, including the
          documentation/justification for closure.
                                            -3-                                       Enclosure
 
    * Acceptance test documentation, including hardware and software model revisions at
      the time of acceptance (as available).
    * Documentation that validates current models, including the thermal-hydraulics and
      neutronics models, to the actual plant.
    * All current model deficiencies, including FSAR vs Design differences in the simulator
      (any documentation on this)
    *  Summary list of modifications from August 2009 and August 2011.
    *  Plant Modifications (both hardware and software) completed on the Simulator by due
        date from August 2009 and August 2011.
    *  Simulator Differences Lesson plan used in training (current to August 30, 2011).
    *  The complete book of all Simulator annual performance test packages (usually in a
        single book, but may be electronic or in single test packages), complete with all
        transient tests, steady state tests, and malfunction tests. This should also include the
        test procedures for each test, the acceptance criteria, and results. For each transient
        test, the reference chart should be included or an equivalent subject matter expert
        review versus the simulator results with a write-up for any differences beyond the
        ANSI standard requirements.
    *  All test packages used to verify core physics parameters (such as MTC, IRW). The
        applicable reference graphs from the Plant physics data book (electronic or other
        means as available) should also be included as well as the test procedures used and
        the acceptance criteria with results.
    *  All Simulator test, configuration management, and related documents available in the
        room for inspectors to review. This includes training needs analysis packages,
        simulator review committee meeting minutes, etc.
    *  Current copy of ANSI 3.5 standard you are committed to for Simulator testing.
02.1X: Corrective Actions related to Operator errors
All condition reports related to operator actions/errors in control room
                                        -4-                                        Enclosure
}}
}}

Latest revision as of 17:56, 12 November 2019

Notification of Inspection (NRC Inspection Report 05000499-11-005 & 05000498-11-005) and Request for Information
ML11209B829
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/28/2011
From: Mark Haire
Operations Branch IV
To: Halpin E
South Texas
References
IR-11-005
Download: ML11209B829 (7)


See also: IR 05000498/2011005

Text

Mr. Halpin

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

July 28, 2011

Mr. Edward D. Halpin

President and

Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 050498;050499/2011005) AND REQUEST FOR

INFORMATION

Dear Mr.Halpin:

From September 12 through September 16, inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at South Texas Project Unit 1 and Unit 2 using NRC Inspection

Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have

been divided into two groups. The first group (Section A of the enclosure) identifies information

to be provided one week prior to the onsite inspection week to ensure that the inspectors are

adequately prepared. The second group (Section B of the enclosure) identifies the information

that the inspectors will need upon arrival at the site. It is important that all of these documents

are up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mrs. Robyn Savage of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector Kelly Clayton at (817) 860-8216

(Kelly.clayton@nrc.gov) or Steve Garchow at (817) 276-4426 (Steve.garchow@nrc.gov ).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-498 and 50-499

Licenses: NPF-76 and NPF-80

Enclosure:

Inservice Inspection Document Request

Distribution via ListServ for South Texas Project

-1- Enclosure

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Jeff.Clark@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Robert.Caldwell@nrc.gov)

Senior Resident Inspector (John.Dixon@nrc.gov)

Resident Inspector (Binesh.Tharakan@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Christopher.Henderson@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

Only inspection reports to the following:

RIV/ETA: OEDO (John.McHale@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

S:\DRS\REPORTS\Reports Draft\ST 2011005 RFI LTR MLXXXXXXXXXX

ADAMS No Yes SUNSI Review Complete Reviewer Initials: KDC

Category B.1 Publicly Available Non-sensitive

Category A Non-publicly Available Sensitive

SOE: OB C: OB

KClayton SGarchow for

MHaire

7/25/2011 7/28/2011

OFFICIAL RECORD COPY -2- T=Telephone E=E-mail Enclosure

F=Fax

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: Kelly Clayton

Senior Operations Engineer, NRC RIV

817-860-8216

To: Tim Hurley

Requal Supervisor, STP

361-972-8568

Subj: Information Request to Support September 12-16, Licensed Operator Requalification

Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than September 6, 2011.

  • Electronically: To: Kelly.Clayton@nrc.gov (lead inspector)

Cc: Steve.Garchow@nrc.gov (inspector)

  • Hardcopy to: US Nuclear Regulatory Commission, Region IV

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011

ATTN: Kelly Clayton

02.03: Facility Operating History

  • List of LERs since last biennial requal inspection (BRQ)
  • List of CRs since last biennial requal inspection

02.04: Licensee Requal Exams / 02.09: Written Exam and Op Test Results

  • Current requalification cycle written examinations (SRO & RO) and results
  • Current requalification cycle operating tests (SRO & RO) and results through August

26, 2011.

  • Current requalification cycle examination methodology (sample plan)
  • All portions of the UFSAR that identify operator response times

02.05: Licensee Admin of Requal Exams

  • Schedule of operating tests (JPMs & scenarios) for week of September 12.

-1- Enclosure

  • Operating tests (JPMs & scenarios) (password protected and provide separately via

telephone at later date) to be given week of September 12.

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • All procedures that describe conduct of simulator training
  • All Procedures used to test, operate, and maintain the simulator
  • All Procedures that describe examination security, including guidelines on overlap

between examinations in current exam cycle tests and prior year examinations

  • List of all examination security problems since last BRQ inspection

02.06: Licensee Feedback System

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requal exams (includes

training provided to operators to enable passing requal exams and training provided

to correct generic or individual weaknesses observed during previous requal exam

cycle)

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses

and ensuring medical fitness of licensed operators

  • All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since last BRQ

-2- Enclosure

02.11: Conformance with Simulator Requirements

  • For the following cases, send the most recent transient test packages, which may be

electronic or in paper single test packages and shall be complete with test

procedures for each test, the acceptance criteria, and results. For each transient test,

the reference chart should be included or an equivalent subject matter expert review

versus the simulator results with a write-up for any differences beyond the ANSI 3.5

standard requirements. The team lead should pick samples from the list in the ANSI

3.5 standard as deemed appropriate for the inspection. A few examples are listed

below:

o Transient test 1, Manual Rx trip

o Transient test 6, Main turbine trip (max power level with no immediate reactor

trip).

o Steady State tests for 50 percent power and 100 percent power

  • All Simulator Management and Configuration Procedures.
  • Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between August 2009 and August 2011.

  • Malfunction Tests for Stuck open PORV and Main Feed Line Break. If these are

included in an SBT package then the review of that package would be acceptable.

  • MTC and IRW tests as part of primary parameters tested in order to verify core

physics parameters. The applicable reference graphs from the Plant physics data

book (electronic or other means as available) should also be included as well as the

test procedures used and the acceptance criteria with results for these two samples.

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on September 12, 2011.

02.04: Licensee Requal Exams / 02.09: Written Exam and Op Test Results

  • All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week

02.08: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

02.11: Conformance with Simulator Requirements

  • Simulator discrepancies (DRs) from August 2009 and August 2011. This should

include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

-3- Enclosure

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

  • All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

  • Summary list of modifications from August 2009 and August 2011.
  • Plant Modifications (both hardware and software) completed on the Simulator by due

date from August 2009 and August 2011.

  • Simulator Differences Lesson plan used in training (current to August 30, 2011).
  • The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI standard requirements.

  • All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

  • All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.1X: Corrective Actions related to Operator errors

All condition reports related to operator actions/errors in control room

-4- Enclosure