{{#Wiki_filter:From: Sent: To: Cc:  
{{#Wiki_filter:NYS000197 Submitted: December 16, 2011 From:             Burroni, Richard J Sent:             Tuesday, August 12, 2008 5:40PM To:               Lee, Robert C <RLee7@entergy.com>; Azevedo, Nelson F
                    <nazeved@entergy.com>; Orlando, Thomas <TOrland@entergy.com>
Cc:                 Caputo, Charles <ccapu90@entergy.com>; Mayer, Donald M
                    <dmayer 1@entergy. com>


==Subject:==
==Subject:==
Burroni, Richard J Tuesday, August 12, 2008 5:40PM Lee, Robert C <RLee7@entergy.com>;
RE: J Pollock review Friday-ISE R-7 Recommendation After reading Bob's latest trip report (EPRI Buried Pipe Issues Group (BPI G) meeting Jacksonville, FL. July 22-23, 2008), its clear to me that we have no existing technology that could determine the "health" of our buried piping without the use of excavation. We need to get started on this, especially if we want some data by years end.
Azevedo, Nelson F <nazeved@entergy.com>;
RB From: Lee, Robert C Sent: Friday, August 08, 2008 2:17 PM To: Azevedo, Nelson F; Burroni, Richard J; Orlando, Thomas
Orlando, Thomas <TOrland@entergy.com>
Caputo, Charles <ccapu90@entergy.com>;
Mayer, Donald M <dmayer 1 @entergy.
com> RE: J Pollock review Friday-ISE R-7 Recommendation After reading Bob's latest trip report (EPRI Buried Pipe Issues Group (BPI G) meeting Jacksonville, FL. July 22-23, 2008), its clear to me that we have no existing technology that could determine the "health" of our buried piping without the use of excavation.
We need to get started on this, especially if we want some data by years end. RB From: Lee, Robert C Sent: Friday, August 08, 2008 2:17 PM To: Azevedo, Nelson F; Burroni, Richard J; Orlando, Thomas  


==Subject:==
==Subject:==
FW: J Pollock review Friday-ISE R-7 Recommendation FYI -See attached EXCEL doc for what Charlie Caputo and I put together for buried pipe for Don Mayer to review with Joe Pollock. Also, Charlie Caputo is co-ordinating meeting next week with the lawyer(s) for preliminary meeting regards ISE Report response.
FW: J Pollock review Friday-ISE R-7 Recommendation FYI -See attached EXCEL doc for what Charlie Caputo and I put together for buried pipe for Don Mayer to review with Joe Pollock.
Buried pipe is to be discussed on Wed. Bob From: Caputo, Charles Sent: Thursday, August 07, 2008 3:48 PM To: Mayer, Donald M Cc: Lee, Robert C; Curry, John J  
Also, Charlie Caputo is co-ordinating meeting next week with the lawyer(s) for preliminary meeting regards ISE Report response.
Buried pipe is to be discussed on Wed.
Bob From: Caputo, Charles Sent: Thursday, August 07, 2008 3:48 PM To: Mayer, Donald M Cc: Lee, Robert C; Curry, John J


==Subject:==
==Subject:==
FW: J Pollock review Friday-ISE R-7 Recommendation Don, see attached.
FW: J Pollock review Friday-ISE R-7 Recommendation Don, see attached.
PS John Curry may have some other comments From: Caputo, Charles Sent: Thursday, August 07, 2008 3:47 PM To: Curry, John J  
PS John Curry may have some other comments From: Caputo, Charles Sent: Thursday, August 07, 2008 3:47 PM To: Curry, John J


==Subject:==
==Subject:==
RE: J Pollock review Friday-ISE R-7 Recommendation See attached From: Curry, John J Sent: Wednesday, August 06, 2008 3:35 PM To: Caputo, Charles  
RE: J Pollock review Friday-ISE R-7 Recommendation See attached From: Curry, John J Sent: Wednesday, August 06, 2008 3:35 PM To: Caputo, Charles


==Subject:==
==Subject:==
FW: J Pollock review Friday-ISE IPEC00091093 IPEC00091 093 We are listed for Buried Piping.??
FW: J Pollock review Friday-ISE IPEC00091093 IPEC00091 093
From: Mayer, Donald M Sent: Wednesday, August 06, 2008 2:18 PM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W  
 
We are listed for Buried Piping.??
From: Mayer, Donald M Sent: Wednesday, August 06, 2008 2:18 PM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W


==Subject:==
==Subject:==
RE: J Pollock review Friday-ISE The excel file is attached (as discussed below. Unfortunately IT can not set up a share service for shared edits quickly. So each person edit and save the file and send it back to me. I will print out your sections for the meeting with Joe and then I'll have clerical help pull all the info into one file. From: Mayer, Donald M Sent: Wednesday, August 06, 2008 9:55AM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W  
RE: J Pollock review Friday-ISE The excel file is attached (as discussed below. Unfortunately IT can not set up a share service for shared edits quickly. So each person edit and save the file and send it back to me. I will print out your sections for the meeting with Joe and then I'll have clerical help pull all the info into one file.
From: Mayer, Donald M Sent: Wednesday, August 06, 2008 9:55AM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W


==Subject:==
==Subject:==
J Pollock review Friday-ISE Guys-1 will be reviewing your work products with Joe Pollock on Friday 8/8. Bob Waloplpe is assembling a spreadsheet that has each individual recommendation listed with its page reference etc. Bob will be sending that to you early this afternoon and the output of your summary papers needs to be placed in the spreadsheet.
J Pollock review Friday-ISE Guys-1will be reviewing your work products with Joe Pollock on Friday 8/8. Bob Waloplpe is assembling a spreadsheet that has each individual recommendation listed with its page reference etc. Bob will be sending that to you early this afternoon and the output of your summary papers needs to be placed in the spreadsheet. Simply add rows for each option related to each recommendation you will provide data on. See below. A quick triage of what we can provide Joe is worthwhile. NOTE: I still expcet to get your one page summaries for review with Joe as part of the matrix review.
Simply add rows for each option related to each recommendation you will provide data on. See below. A quick triage of what we can provide Joe is worthwhile.
Fred Marcusen - in discussion with Dan G, the current asset management planning for security address much but NOT all of the ISE security recs. So we need to be clear and the cost est needs to reflect cost+ TBD or cost+est if you have one.
NOTE: I still expcet to get your one page summaries for review with Joe as part of the matrix review. Fred Marcusen -in discussion with Dan G, the current asset management planning for security address much but NOT all of the ISE security recs. So we need to be clear and the cost est needs to reflect cost+ TBD or cost+est if you have one. Mark-it is of course obvious that for many items we will not even have a conceptual cost available, but I know in some case we do (eg AMP). Depending on Joes thoughts on the response and that of Corp Execs we will likely need the assitance of an estimator to meet with small groups and get an idea of potential solutions and help develop initial conceptuals
Mark- it is of course obvious that for many items we will not even have a conceptual cost available, but I know in some case we do (eg AMP). Depending on Joes thoughts on the response and that of Corp Execs we will likely need the assitance of an estimator to meet with small groups and get an idea of potential solutions and help develop initial conceptuals (+I-50% or more). Please give soome thought to expertise you may be able to bring in to assist as a consultant.
(+I-50% or more). Please give soome thought to expertise you may be able to bring in to assist as a consultant.
For example: Rehab Putnam building/real estate is -xxx$/sq/ft, IT infrastructure is y$ (from IT),
For example: Rehab Putnam building/real estate is -xxx$/sq/ft, IT infrastructure is y$ (from IT), new midas software and training for site and counties is z$ Option 1 x million 6moths Basis-this has Rehabilitate after AE been evaluated new EOF publishes plans in 2005$ as an option at that time Option 2 Rehab 1.5 million and Basis facility in 1year Putnam or Dutchess County outside 2 mile EPZ IPEC00091094 IPEC00091 094 Option 3 Build a new EOF with a throne for Brian Sullivan From: Mayer, Donald M 18 months 3.5 million Sent: Monday, August 04, 2008 5:04PM basis To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan Weaver, Daria; Curry, John J; Elliott, Kevin P; Caputo, Charles  
new midas software and training for site and counties is z$
Option 1               x million 6moths   Basis- this has Rehabilitate           after AE           been evaluated new EOF               publishes plans   in 2005$ as an option at that time Option 2 Rehab         1.5 million and   Basis facility in             1year Putnam or Dutchess County outside 2 mile EPZ IPEC00091094 IPEC00091 094
 
Option 3                 18 months            basis Build a new             3.5 million EOF with a throne for Brian Sullivan From: Mayer, Donald M Sent: Monday, August 04, 2008 5:04PM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan Weaver, Daria; Curry, John J; Elliott, Kevin P; Caputo, Charles


==Subject:==
==Subject:==
FW: ISE Summary Guys-1 want to give you more time to develop your responses to my request of today. To that end: 1. by Thursday 8/7 give me your initial/preliminary assessment as follows a. Rec # and Page # and Rec Title (the attached word document lists recommendation  
FW: ISE Summary Guys-1 want to give you more time to develop your responses to my request of today. To that end:
#sand page ffs and titles for most, the email below explains the codes used) b. Your best understanding of the scope of the solution-this should be concise but with enough detail so it is clear what we would expect as a final deliverable for each recommendation  
: 1. by Thursday 8/7 give me your initial/preliminary assessment as follows
.. c. What you recommend as an answer to the recommendation-ie how to implement a solution, including options as appropriate
: a. Rec # and Page # and Rec Title (the attached word document lists recommendation #sand page ffs and titles for most, the email below explains the codes used)
: i. For example for EOF facility 3 example options are : 1. improve existing facility, 2. build new facility from ground up, 3. purchase a commercial building and modify to suit. Cost and schedule estimates for each. d. Your best estimate of a duration to accomplish each rec assuming funding is in place e.g. 1 month, 3 months, 6 Months, 1 year or 2 years or 2+ e. Conceptual cost estmate, for example we have a 2006 estimate to paint the VC stacks of x$Million, conceptual only-risk factors include etc i. Note-it is critical that you each provide the basis for your cost estimates (ie prior conceptual, industry benchmark, presently in the asset mngt plan, industry experience et)c 2. by Wednesday 8/13 of the following week formalize your draft and provide it via email. 3. You guys will be designated as "SMEs" providing input-these are conceptual-first cut numbers only and further scope definition and refinement will be necessary as we move forward. Certainly do not low ball the estimates($, scope or time). From: Walpole, Robert W Sent: Thursday, July 31, 2008 5:14PM To: Pollock, Joseph E; Vitale, Anthony J.; Mayer, Donald M; Orlando, Thomas Cc: Donnelly, John M; Sullivan, Brian A; Gagnon, Daniel W  
: b. Your best understanding of the scope of the solution- this should be concise but with enough detail so it is clear what we would expect as a final deliverable for each recommendation ..
: c. What you recommend as an answer to the recommendation- ie how to implement a solution, including options as appropriate
: i. For example for EOF facility 3 example options are : 1.
improve existing facility, 2. build new facility from ground up, 3. purchase a commercial building and modify to suit. Cost and schedule estimates for each.
: d. Your best estimate of a duration to accomplish each rec assuming funding is in place e.g. 1 month, 3 months, 6 Months, 1 year or 2 years or 2+
: e. Conceptual cost estmate, for example we have a 2006 estimate to paint the VC stacks of x$Million, conceptual only- risk factors include etc
: i. Note- it is critical that you each provide the basis for your cost estimates (ie prior conceptual, industry benchmark, presently in the asset mngt plan, industry experience et)c
: 2. by Wednesday 8/13 of the following week formalize your draft and provide it via email.
: 3. You guys will be designated as "SMEs" providing input- these are conceptual- first cut numbers only and further scope definition and refinement will be necessary as we move forward. Certainly do not low ball the estimates($, scope or time).
From: Walpole, Robert W Sent: Thursday, July 31, 2008 5:14PM To: Pollock, Joseph E; Vitale, Anthony J.; Mayer, Donald M; Orlando, Thomas Cc: Donnelly, John M; Sullivan, Brian A; Gagnon, Daniel W


==Subject:==
==Subject:==
ISE Summary Attached please find a summary document of the ISE report. The first part of the attached report repeats the 42 recommendations and 16 observations that the ISE had in their report. The second part of the report is a summary by section which attempts to identify Actions that we need to take, IPEC00091095 IPEC00091 095 Inaccuracies in the report, or items that may be inflammatory when they are read or quoted. The following is a key to the attached report: R-Recommendation taken from the ISE report 0-Observation taken from the ISE report P -Potential Inflammatory statement I-Inaccurate A-Action required to be performed.
ISE Summary Attached please find a summary document of the ISE report.
The first part of the attached report repeats the 42 recommendations and 16 observations that the ISE had in their report.
The second part of the report is a summary by section which attempts to identify Actions that we need to take, IPEC00091095 IPEC00091 095
 
Inaccuracies in the report, or items that may be inflammatory when they are read or quoted.
The following is a key to the attached report:
R- Recommendation taken from the ISE report 0- Observation taken from the ISE report P - Potential Inflammatory statement I- Inaccurate A- Action required to be performed.
We have included a page number so that you can refer back to the report to see where the statement was extracted.
We have included a page number so that you can refer back to the report to see where the statement was extracted.
If you need specific details or data to address a particular issue, please let me know. Bob Walpole Manager, Licensing-IPEC (914) 734 -671 0 (work) (914) 760 -2019 (cell) IPEC00091096 IPEC00091 096}}
If you need specific details or data to address a particular issue, please let me know.
Bob Walpole Manager, Licensing- IPEC (914) 734 - 671 0 (work)
(914) 760 - 2019 (cell)
IPEC00091096 IPEC00091 096}}

Latest revision as of 11:43, 12 November 2019

New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit NYS000197, Email, Burroni, Richard J (Entergy) to Lee, Robert C; Azevedo, Nelson F; Orlando, Caputo, Charles; Mayer, Donald M, J Pollock Review Friday-ISE R-7 Recommendation
ML11353A029
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/12/2008
From: Burroni R
Entergy Corp
To: Azevedo N, Richard Lee, Orlando T
Entergy Corp, Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21567, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML11353A029 (4)


Text

NYS000197 Submitted: December 16, 2011 From: Burroni, Richard J Sent: Tuesday, August 12, 2008 5:40PM To: Lee, Robert C <RLee7@entergy.com>; Azevedo, Nelson F

<nazeved@entergy.com>; Orlando, Thomas <TOrland@entergy.com>

Cc: Caputo, Charles <ccapu90@entergy.com>; Mayer, Donald M

<dmayer 1@entergy. com>

Subject:

RE: J Pollock review Friday-ISE R-7 Recommendation After reading Bob's latest trip report (EPRI Buried Pipe Issues Group (BPI G) meeting Jacksonville, FL. July 22-23, 2008), its clear to me that we have no existing technology that could determine the "health" of our buried piping without the use of excavation. We need to get started on this, especially if we want some data by years end.

RB From: Lee, Robert C Sent: Friday, August 08, 2008 2:17 PM To: Azevedo, Nelson F; Burroni, Richard J; Orlando, Thomas

Subject:

FW: J Pollock review Friday-ISE R-7 Recommendation FYI -See attached EXCEL doc for what Charlie Caputo and I put together for buried pipe for Don Mayer to review with Joe Pollock.

Also, Charlie Caputo is co-ordinating meeting next week with the lawyer(s) for preliminary meeting regards ISE Report response.

Buried pipe is to be discussed on Wed.

Bob From: Caputo, Charles Sent: Thursday, August 07, 2008 3:48 PM To: Mayer, Donald M Cc: Lee, Robert C; Curry, John J

Subject:

FW: J Pollock review Friday-ISE R-7 Recommendation Don, see attached.

PS John Curry may have some other comments From: Caputo, Charles Sent: Thursday, August 07, 2008 3:47 PM To: Curry, John J

Subject:

RE: J Pollock review Friday-ISE R-7 Recommendation See attached From: Curry, John J Sent: Wednesday, August 06, 2008 3:35 PM To: Caputo, Charles

Subject:

FW: J Pollock review Friday-ISE IPEC00091093 IPEC00091 093

We are listed for Buried Piping.??

From: Mayer, Donald M Sent: Wednesday, August 06, 2008 2:18 PM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W

Subject:

RE: J Pollock review Friday-ISE The excel file is attached (as discussed below. Unfortunately IT can not set up a share service for shared edits quickly. So each person edit and save the file and send it back to me. I will print out your sections for the meeting with Joe and then I'll have clerical help pull all the info into one file.

From: Mayer, Donald M Sent: Wednesday, August 06, 2008 9:55AM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan, Brian A; Curry, John J; Elliott, Kevin P Cc: Walpole, Robert W

Subject:

J Pollock review Friday-ISE Guys-1will be reviewing your work products with Joe Pollock on Friday 8/8. Bob Waloplpe is assembling a spreadsheet that has each individual recommendation listed with its page reference etc. Bob will be sending that to you early this afternoon and the output of your summary papers needs to be placed in the spreadsheet. Simply add rows for each option related to each recommendation you will provide data on. See below. A quick triage of what we can provide Joe is worthwhile. NOTE: I still expcet to get your one page summaries for review with Joe as part of the matrix review.

Fred Marcusen - in discussion with Dan G, the current asset management planning for security address much but NOT all of the ISE security recs. So we need to be clear and the cost est needs to reflect cost+ TBD or cost+est if you have one.

Mark- it is of course obvious that for many items we will not even have a conceptual cost available, but I know in some case we do (eg AMP). Depending on Joes thoughts on the response and that of Corp Execs we will likely need the assitance of an estimator to meet with small groups and get an idea of potential solutions and help develop initial conceptuals (+I-50% or more). Please give soome thought to expertise you may be able to bring in to assist as a consultant.

For example: Rehab Putnam building/real estate is -xxx$/sq/ft, IT infrastructure is y$ (from IT),

new midas software and training for site and counties is z$

Option 1 x million 6moths Basis- this has Rehabilitate after AE been evaluated new EOF publishes plans in 2005$ as an option at that time Option 2 Rehab 1.5 million and Basis facility in 1year Putnam or Dutchess County outside 2 mile EPZ IPEC00091094 IPEC00091 094

Option 3 18 months basis Build a new 3.5 million EOF with a throne for Brian Sullivan From: Mayer, Donald M Sent: Monday, August 04, 2008 5:04PM To: Runion, William (Mark); Gagnon, Daniel W; Marcussen, Fred; Sullivan Weaver, Daria; Curry, John J; Elliott, Kevin P; Caputo, Charles

Subject:

FW: ISE Summary Guys-1 want to give you more time to develop your responses to my request of today. To that end:

1. by Thursday 8/7 give me your initial/preliminary assessment as follows
a. Rec # and Page # and Rec Title (the attached word document lists recommendation #sand page ffs and titles for most, the email below explains the codes used)
b. Your best understanding of the scope of the solution- this should be concise but with enough detail so it is clear what we would expect as a final deliverable for each recommendation ..
c. What you recommend as an answer to the recommendation- ie how to implement a solution, including options as appropriate
i. For example for EOF facility 3 example options are : 1.

improve existing facility, 2. build new facility from ground up, 3. purchase a commercial building and modify to suit. Cost and schedule estimates for each.

d. Your best estimate of a duration to accomplish each rec assuming funding is in place e.g. 1 month, 3 months, 6 Months, 1 year or 2 years or 2+
e. Conceptual cost estmate, for example we have a 2006 estimate to paint the VC stacks of x$Million, conceptual only- risk factors include etc
i. Note- it is critical that you each provide the basis for your cost estimates (ie prior conceptual, industry benchmark, presently in the asset mngt plan, industry experience et)c
2. by Wednesday 8/13 of the following week formalize your draft and provide it via email.
3. You guys will be designated as "SMEs" providing input- these are conceptual- first cut numbers only and further scope definition and refinement will be necessary as we move forward. Certainly do not low ball the estimates($, scope or time).

From: Walpole, Robert W Sent: Thursday, July 31, 2008 5:14PM To: Pollock, Joseph E; Vitale, Anthony J.; Mayer, Donald M; Orlando, Thomas Cc: Donnelly, John M; Sullivan, Brian A; Gagnon, Daniel W

Subject:

ISE Summary Attached please find a summary document of the ISE report.

The first part of the attached report repeats the 42 recommendations and 16 observations that the ISE had in their report.

The second part of the report is a summary by section which attempts to identify Actions that we need to take, IPEC00091095 IPEC00091 095

Inaccuracies in the report, or items that may be inflammatory when they are read or quoted.

The following is a key to the attached report:

R- Recommendation taken from the ISE report 0- Observation taken from the ISE report P - Potential Inflammatory statement I- Inaccurate A- Action required to be performed.

We have included a page number so that you can refer back to the report to see where the statement was extracted.

If you need specific details or data to address a particular issue, please let me know.

Bob Walpole Manager, Licensing- IPEC (914) 734 - 671 0 (work)

(914) 760 - 2019 (cell)

IPEC00091096 IPEC00091 096