| number = ML120650807
| number = ML120650807
| issue date = 03/23/2012
| issue date = 03/23/2012
| title = Callaway Plant, Unit 1 - Correction to Amendment No. 204 to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (Ees) Actuation Instrumentation (TAC No. ME5173)
| title = Correction to Amendment No. 204 to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation
| author name = Thadani M C
| author name = Thadani M
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 5
| page count = 5
| project = TAC:ME5173
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
==SUBJECT:==
CALLAWAY PLANT, UNIT 1 - CORRECTION OF AMENDMENT NO. 204 RE:
REVISION OF TECHNICAL SPECIFICATION 3.3.8, "EMERGENCY EXHAUST SYSTEM (EES) ACTUATION INSTRUMENTATION" (TAC NO. ME5173)
==Dear Mr. Heflin:==
On December 30, 2011 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML113340041), the U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the Amendment No. 204 to Facility Operating License No. NPF-30, for the Callaway Plant, Unit 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 10,2010, as supplemented by letters dated June 16, October 27, and December 13, 2011 (ADAMS Accession Nos. ML103470204, ML111680233, ML113010383, and ML113480060, respectively).
The amendment added new Surveillance Requirement (SR) 3.3.8.6, to TS 3.3.8, "Emergency Exhaust System (EES) Actuation Instrumentation." The new SR requires the performance of response time testing on the portion of the EES required to isolate the normal fuel building ventilation exhaust flow path and initiate the fuel building ventilation isolation signal mode of operation. The amendment also revised TS Table 3.3.8-1, "EES Actuation Instrumentation," to state that the new SR 3.3.8.6 applies to automatic actuation Function 2, Automatic Actuation Logic and Actuation Relays (BOP ESFAS), and Function 3, Fuel Building Exhaust Radiation Gaseous. In addition, the specified frequency of new SR 3.3.8.6 would be relocated and controlled in accordance with the licensee's Surveillance Frequency Control Program.
By e-mail datedJanuary19.2012(ADAMSAccessionNo.ML120670119). the licensee informed the NRC staff that Amendment No. 204 did not include the revised implementation schedule as requested in the licensee's supplement dated June 16, 2011. In that letter, the licensee revised its original request for implementation within 90 days with the following exception:
Since SR 3.3.8.6 is a new Surveillance Requirement the first required performance will come due by the end of the first surveillance interval that begins or is in effect on the date of implementation of this amendment. (ThiS is similar to the License Condition applied to new Surveillance Requirements added by License Amendment 133 for the ITS Conversion.) As such, if the license Clmendment is issued pr'or to
A. Heflin                                        -2 October 1, 2011, SR 3.3.8.6 will first be met during Refuel 18. If the license amendment is issued after October 1, 2011, SR 3.3.8.6 will first be met during Refuel 19 (spring 2013).
Failure to consider the above exception in Issuance of Amendment No. 204 was an administrative error on the part of the NRC. This error does not change the staff's conclusions regarding Amendment No. 204. The implementation date for Amendment No. 204 is revised for revised SR 3.3.8.6 to be first met during Refuel 19 (Spring 2013). Enclosed is a corrected page 2 of the amendment letter, with the correction denoted by a vertical bar Please discard the associated page 2 from the previous amendment letter and replace it with the enclosed page.
If you have any questions, please call me at (301-415-1476 or by electronic mail at mohan. thadani@nrc.gov.
Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
==Enclosure:==
Revised amendment letter page 2 cc w/encl: Distribution via Listserv
ENCLOSURE AMENDMENT NO. 204 DATED DECEMBER 30, 2011 REVISED AMENDMENT LETTER PAGE 2
                                                - 2
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:
(2)    Technical Specifications and Environmental Protection Plan*
The Technical Specifications contained in Appendix A, as revised through Amendment No. 204 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: 3. The amendment is effective on the date of NRC issuance, and is to be implemented by the refueling outage 19 scheduled for spring of 2013.
FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
==Attachment:==
Changes to the Facility Operating License No. NPF-30 and Technical Specifications Date of Issuance: December 30, 2011
A. Heflin                                      -2 October 1,2011, SR 3.3.8.6 will first be met during Refuel 18. If the license amendment is issued after October 1, 2011, SR 3.3.8.6 will first be met during Refuel 19 (spring 2013).
Failure to consider the above exception in Issuance of Amendment No. 204 was an administrative error on the part of the NRC. This error does not change the staffs conclusions regarding Amendment No. 204. The implementation date for Amendment No. 204 is revised for revised SR 3.3.8.6 to be first met during Refuel 19 (Spring 2013). Enclosed is a corrected page 2 of the amendment letter, with the correction denoted by a vertical bar Please discard the associated page 2 from the previous amendment letter and replace it with the enclosed page.
If you have any questions, please call me at (301-415-1476 or by electronic mail at mohan.thadani@nrc.gov.
Sincerely, IRN Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
==Enclosure:==
Revised amendment letter page 2 cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                                                RidsNrrDssStsb Resource LPLIV Reading                                        RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource                        RidsNrrPMCallaway Resource RidsNrrDeEicb Resource                                RidsOgcRp Resource RidsNrrDorlDpr Resource                              RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource                              LBenton, NRR/DRNMDB RidsNrrDraAadb Resource ADAMS Accession No. ML120650807 E NRR/LPL4/PM                RlLPL4/LA          NRR/LPL4/BC          NRR/LPL4/PM
                                      ----------~~------------+-----------~I MThadani                                  MMarkley              MThadani 3/7/12                                    3/23/12              3/23/12 OFFICIAL RECORD COpy}}

Latest revision as of 08:14, 12 November 2019

Correction to Amendment No. 204 to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation
ML120650807
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/23/2012
From: Thadani M
Plant Licensing Branch IV
To: Heflin A
Union Electric Co
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME5173
Download: ML120650807 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - CORRECTION OF AMENDMENT NO. 204 RE:

REVISION OF TECHNICAL SPECIFICATION 3.3.8, "EMERGENCY EXHAUST SYSTEM (EES) ACTUATION INSTRUMENTATION" (TAC NO. ME5173)

Dear Mr. Heflin:

On December 30, 2011 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML113340041), the U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the Amendment No. 204 to Facility Operating License No. NPF-30, for the Callaway Plant, Unit 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 10,2010, as supplemented by letters dated June 16, October 27, and December 13, 2011 (ADAMS Accession Nos. ML103470204, ML111680233, ML113010383, and ML113480060, respectively).

The amendment added new Surveillance Requirement (SR) 3.3.8.6, to TS 3.3.8, "Emergency Exhaust System (EES) Actuation Instrumentation." The new SR requires the performance of response time testing on the portion of the EES required to isolate the normal fuel building ventilation exhaust flow path and initiate the fuel building ventilation isolation signal mode of operation. The amendment also revised TS Table 3.3.8-1, "EES Actuation Instrumentation," to state that the new SR 3.3.8.6 applies to automatic actuation Function 2, Automatic Actuation Logic and Actuation Relays (BOP ESFAS), and Function 3, Fuel Building Exhaust Radiation Gaseous. In addition, the specified frequency of new SR 3.3.8.6 would be relocated and controlled in accordance with the licensee's Surveillance Frequency Control Program.

By e-mail datedJanuary19.2012(ADAMSAccessionNo.ML120670119). the licensee informed the NRC staff that Amendment No. 204 did not include the revised implementation schedule as requested in the licensee's supplement dated June 16, 2011. In that letter, the licensee revised its original request for implementation within 90 days with the following exception:

Since SR 3.3.8.6 is a new Surveillance Requirement the first required performance will come due by the end of the first surveillance interval that begins or is in effect on the date of implementation of this amendment. (ThiS is similar to the License Condition applied to new Surveillance Requirements added by License Amendment 133 for the ITS Conversion.) As such, if the license Clmendment is issued pr'or to

A. Heflin -2 October 1, 2011, SR 3.3.8.6 will first be met during Refuel 18. If the license amendment is issued after October 1, 2011, SR 3.3.8.6 will first be met during Refuel 19 (spring 2013).

Failure to consider the above exception in Issuance of Amendment No. 204 was an administrative error on the part of the NRC. This error does not change the staff's conclusions regarding Amendment No. 204. The implementation date for Amendment No. 204 is revised for revised SR 3.3.8.6 to be first met during Refuel 19 (Spring 2013). Enclosed is a corrected page 2 of the amendment letter, with the correction denoted by a vertical bar Please discard the associated page 2 from the previous amendment letter and replace it with the enclosed page.

If you have any questions, please call me at (301-415-1476 or by electronic mail at mohan. thadani@nrc.gov.

Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

Revised amendment letter page 2 cc w/encl: Distribution via Listserv

ENCLOSURE AMENDMENT NO. 204 DATED DECEMBER 30, 2011 REVISED AMENDMENT LETTER PAGE 2

- 2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan*

The Technical Specifications contained in Appendix A, as revised through Amendment No. 204 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. The amendment is effective on the date of NRC issuance, and is to be implemented by the refueling outage 19 scheduled for spring of 2013.

FOR THE NUCLEAR REGULATORY COMMISSION Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-30 and Technical Specifications Date of Issuance: December 30, 2011

A. Heflin -2 October 1,2011, SR 3.3.8.6 will first be met during Refuel 18. If the license amendment is issued after October 1, 2011, SR 3.3.8.6 will first be met during Refuel 19 (spring 2013).

Failure to consider the above exception in Issuance of Amendment No. 204 was an administrative error on the part of the NRC. This error does not change the staffs conclusions regarding Amendment No. 204. The implementation date for Amendment No. 204 is revised for revised SR 3.3.8.6 to be first met during Refuel 19 (Spring 2013). Enclosed is a corrected page 2 of the amendment letter, with the correction denoted by a vertical bar Please discard the associated page 2 from the previous amendment letter and replace it with the enclosed page.

If you have any questions, please call me at (301-415-1476 or by electronic mail at mohan.thadani@nrc.gov.

Sincerely, IRN Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

Revised amendment letter page 2 cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDssStsb Resource LPLIV Reading RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMCallaway Resource RidsNrrDeEicb Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource LBenton, NRR/DRNMDB RidsNrrDraAadb Resource ADAMS Accession No. ML120650807 E NRR/LPL4/PM RlLPL4/LA NRR/LPL4/BC NRR/LPL4/PM


~~------------+-----------~I MThadani MMarkley MThadani 3/7/12 3/23/12 3/23/12 OFFICIAL RECORD COpy