=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY | {{#Wiki_filter:ENT000344 | ||
REGION 475 ALLENDALE KING OF PRUSSIA. PENNSYLVANIA | Submitted: March 29, 2012 | ||
March 3, 2010 Mr. Joseph E. Pollock Site Vice President | UNITED STATES | ||
Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB Buchanan, NY 10511-0249 | NUCLEAR REGULATORY COMMISSION | ||
ANNUAL ASSESSMENT | REGION I | ||
LETTER -INDIAN POINT NUCLEAR GENERATING | 475 ALLENDALE ROAD | ||
UNITS 2 AND 3 (REPORTS 05000247/2010001 | KING OF PRUSSIA. PENNSYLVANIA 19406-1415 | ||
& 05000286/2010001) | March 3, 2010 | ||
Dear Mr. Pollock: On February 12, 2010. the NRC staff completed | Mr. Joseph E. Pollock | ||
its performance | Site Vice President | ||
review of Indian Point Nuclear Generating | Entergy Nuclear Operations, Inc. | ||
{Indian Point} Units 2 and 3. Our technical | Indian Point Energy Center | ||
staff reviewed performance | 450 Broadway, GSB | ||
Buchanan, NY 10511-0249 | |||
results from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment | SUBJECT: ANNUAL ASSESSMENT LETTER - INDIAN POINT NUCLEAR GENERATING | ||
of your safety performance | UNITS 2 AND 3 (REPORTS 05000247/2010001 & 05000286/2010001) | ||
during this period and our plans for future inspections | Dear Mr. Pollock: | ||
at your facility. | On February 12, 2010. the NRC staff completed its performance review of Indian Point Nuclear | ||
This performance | Generating {Indian Point} Units 2 and 3. Our technical staff reviewed performance indicators | ||
review and enclosed inspection | (Pis) for the most recent quarter and inspection results from January 1 through December 31, | ||
plan do not include security information. | 2009. The purpose of this letter is to inform you of our assessment of your safety performance | ||
during this period and our plans for future inspections at your facility. | |||
and marked as "Official | This performance review and enclosed inspection plan do not include security information. A | ||
Use Only -Security Information" will include the security cornerstone | separate letter designated and marked as "Official Use Only - Security Information" will include | ||
review and resultant | the security cornerstone review and resultant inspection plan. | ||
inspection | Overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety | ||
plan. Overall, Indian Point Units 2 and 3 operated in a manner that preserved | and fully met all cornerstone objectives, Plant performance at Unit 2 for the most recent | ||
public health and safety and fully met all cornerstone | quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee | ||
objectives, Plant performance | Response column of the NRC's Action Matrix based on all inspection findings being classified | ||
at Unit 2 for the most recent quarter, as well as for the first three quarters of the assessment | as having very low safety significance (Green) and an Pis indicating performance at a level | ||
cycle, was within the Licensee Response column of the NRC's Action Matrix based on all inspection | requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight | ||
findings being classified | process (ROP) baseline inspections at Unit 2. | ||
as having very low safety significance (Green) and an Pis indicating | Plant performance for the most recent quarter at Unit 3 was within the Regulatory Response | ||
performance | column of the NRC's Action Matrix, based on all inspection findings being classified as having | ||
at a level requiring | very low safety significance (Green) and one PI of low to moderate safety significance (White) in | ||
no additional | the Initiating Events cornerstone. Specifically, the Unit 3 "Unplanned Scrams per 7000 Critical | ||
NRC oversight (Green). Therefore, we plan to conduct reactor oversight | Hours" PI exceeded the GreenlWhite threshold of greater than three scrams per 7000 critical | ||
process (ROP) baseline inspections | hours in the third and fourth quarters of the assessment cycle. | ||
at Unit 2. Plant performance | On January 28. 2010, we were notified by your staff of your readiness for the NRC to conduct a | ||
for the most recent quarter at Unit 3 was within the Regulatory | supplemental inspection to review your actions taken to address the Unit 3 "Unplanned Scrams | ||
per 7000 Critical Hours" PI. Therefore, we plan to conduct a supplemental inspection using | |||
findings being classified | |||
as having very low safety significance (Green) and one PI of low to moderate safety significance (White) in the Initiating | J, Pollock 2 | ||
Events cornerstone. | Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic | ||
Specifically, the Unit 3 "Unplanned | Performance Area," beginning on April 19, 2010, This inspection is conducted to provide | ||
Scrams per 7000 Critical Hours" PI exceeded the GreenlWhite | assurance that the root causes and contributing causes of risk significant performance issues | ||
threshold | are understood, the extent of condition is identified, and the corrective actions are sufficient to | ||
of greater than three scrams per 7000 critical hours in the third and fourth quarters of the assessment | prevent recurrence. | ||
cycle. On January 28. 2010, we were notified by your staff of your readiness | In addition to the baseline inspection program at Units 2 and 3, and the supplemental inspection | ||
for the NRC to conduct a supplemental | at Unit 3, we plan to conduct independent spent fuel storage installation inspections. | ||
inspection | With regard to the replacement Alert and Notification System (ANS), we plan to monitor your | ||
to review your actions taken to address the Unit 3 "Unplanned | performance through the Alert and Notification System PI and through baseline inspections. | ||
Specifically. our inspection plan includes focused problem identification and resolution baseline | |||
inspections to review your corrective actions related to the replacement ANS test results from | |||
December 2009. Additionally. the NRC plans to continue to monitor your activities related to | |||
J, Pollock 2 Inspection | final review and approval of the replacement ANS by the Federal Emergency Management | ||
Procedure | Agency. | ||
95001, "Inspection | During this assessment period, the NRC staff continued augmented oversight of your activities | ||
for One or Two White Inputs in a Strategic | related to on-site groundwater contamination in accordance with the ROP Deviation | ||
Performance | Memorandum in effect for calendar year 2009 [ADAMS Ref. ML083590057]1. A team of NRC | ||
Area," beginning | inspectors conducted an onsite inspection in August and September 2009. to review your | ||
on April 19, 2010, This inspection | activities associated with characterization and mitigation of onsite groundwater contamination. | ||
is conducted | Based on the inspection results documented in an inspection report dated October 19, 2009, | ||
to provide assurance | [ADAMS Ref. ML092920121] and NRC's monitoring of sampling activities and independent | ||
that the root causes and contributing | testing of groundwater samples, the NRC concluded that you have satisfied the closure | ||
causes of risk significant | requirements detailed in the Deviation Memorandum regarding the establishment, | ||
performance | implementation, and maintenance of an effective groundwater program to provide continued | ||
radiological monitoring of the groundwater conditions at the Indian Point Energy Center (lPEC). | |||
is identified, and the corrective | Therefore, we plan to implement normal baseline inspections to assess your implementation of | ||
actions are sufficient | the groundwater monitoring program at IPEC. | ||
The enclosed inspection plan details the baseline inspections, less those related to physical | |||
In addition to the baseline inspection | protection. scheduled through June 30, 2011. The inspection plan is provided to allow for the | ||
program at Units 2 and 3, and the supplemental | resolution of any scheduling conflicts and personnel availability issues well in advance of | ||
inspection | inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and | ||
at Unit 3, we plan to conduct independent | continuous nature. The inspections in the last six months of the inspection plan are tentative | ||
spent fuel storage installation | and may be revised at the mid-cycle safety performance review. | ||
inspections. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
With regard to the replacement | enclosure will be made available electronically for public inspection in the NRC Public | ||
Alert and Notification | Document Room or from the Publicly Available Records (PARS) component of NRC's document | ||
System (ANS), we plan to monitor your performance | system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | ||
through the Alert and Notification | rm/adams.html (the Public Electronic Reading Room). | ||
System PI and through baseline inspections. | 1 DeSignation in parentheses refers to ADAMS Accession Number. Documents referencedln this letter are publicly | ||
Specifically. | available using the Accession Number in ADAMS. | ||
our inspection | |||
plan includes focused problem identification | J. Pollock 3 | ||
and resolution | If circumstances arise which cause us to change this inspection plan, we will contact you to | ||
discuss the change as soon as possible. Please contact Mel Gray at 610-337-5209 with any | |||
to review your corrective | questions you may have regarding this letter or the inspection plan. | ||
actions related to the replacement | Director, Division of Reactor Projects | ||
ANS test results from December 2009. Additionally. | Docket Nos. 50-247 and 50-286 | ||
the NRC plans to continue to monitor your activities | License No. DPR-26 and DPR-64 | ||
related to final review and approval of the replacement | Enclosures: Indian Point Nuclear Generating Unit ~! and Unit 3 Inspection/Activity Plans | ||
ANS by the Federal Emergency | cc w/encl: Distribution via ListServ | ||
Management | |||
Agency. During this assessment | J. Pollock 3 | ||
period, the NRC staff continued | If circumstances arise which cause us to change this inspection plan. we will contact you to | ||
augmented | discuss the change as soon as possible. Please contact Mel Gray at 610-337~5209 with any | ||
oversight | questions you may have regarding this letter or the inspection plan. | ||
of your activities | Sincerely, | ||
related to on-site groundwater | IRA! | ||
contamination | David C. Lew | ||
in accordance | Director, Division of Reactor Projects | ||
with the ROP Deviation | Docket Nos. 50-247 and 50-286 | ||
Memorandum | License No. DPR-26 and DPR-64 | ||
in effect for calendar year 2009 [ADAMS Ref. ML083590057]1. | Enclosures: Indian Point Nuclear Generating Unit 2 and Unit 3 Inspection/Activity Plans | ||
A team of NRC inspectors | Distribution wfencl: | ||
conducted | S. Collins, RA (R10RAMAIL RESOURCE) P. Cataldo, DRP, SRI | ||
an onsite inspection | M. Dapas, DRA (R10RAMAIL RESOURCE) M. Halter, DRP, RI | ||
in August and September | D. Lew, DRP (R1DRPMAIL RESOURCE) D. Hochmuth, DRP | ||
2009. to review your activities | J. Clifford, DRP (R1DRPMAIL RESOURCE) RidsNrrPMlndianPoint Resource | ||
associated | D. Roberts, DRS (R1DRSMail Resource) RidsNrrDorlLpl1-1 Resource | ||
with characterization | P. Wilson, DRS (R1DRSMaii Resource) ROPreport Resource@nrc.gov | ||
and mitigation | L. Trocine, RI OEDO DRS Branch Chiefs (6) | ||
of onsite groundwater | M. Gray, DRP L. Scholl, DRS | ||
contamination. | B. Bickett, DRP D. Silk, DRS | ||
Based on the inspection | S. McCarver, DRP J. Trapp, DRS | ||
results documented | M. Osborn, DRP D. Screnci, PAO | ||
in an inspection | E. Keighley, DRP N. Sheehan, PAO | ||
report dated October 19, 2009, [ADAMS Ref. ML092920121] | B. Haagensen, Acting SRI R. Barkley, ORA | ||
and NRC's monitoring | A. Ayegbusi, DRP, RI | ||
of sampling activities | SUNSI Review Complete: __B=B___,(Reviewer's Initials) ML 100620868 | ||
and independent | DOCUMENT NAME: G;\DRP\BRANCHZ\ROP\ROP 10\Annual Assessment Letters\lPEC 2010 Annual | ||
testing of groundwater | Assessment LetterR4.doc | ||
samples, the NRC concluded | After declaring this document "An Official Agency Record" it will be released to the Public. | ||
that you have satisfied | To receive a copy of this document, Indicate in the box: "C" =Copy without attachment/enclosure | ||
the closure requirements | "E" ;;:: Copy with atta ch ment/encI osure 'N"= | ||
detailed in the Deviation | ' No copy | ||
Memorandum | OFFICE RIIDRP I RIIDRP I RlfDRP J I 1 | ||
regarding | NAME BBickettiBB MGraylMXG DLew/DCL | ||
the establishment, implementation, and maintenance | I DATE 02/24/2010 0212412010 03/03/2010 | ||
of an effective | OFFICIAL RECORD COpy | ||
groundwater | |||
program to provide continued | Page 1 of2 Indian Point | ||
radiological | 0212412010 11:02:07 Inspection / Activity Plan | ||
monitoring | Report 22 | ||
of the groundwater | 01/0112010 - 06/30/2011 | ||
conditions | Planned Dates | ||
at the Indian Point Energy Center (lPEC). Therefore, we plan to implement | Start End Title | ||
normal baseline inspections | TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 | ||
to assess your implementation | 2 0112512010 0112912010 IP 7111105T Fire Protection [Triennia~ | ||
2 02/08/2010 02112/2010 IP 71111051 Fire Protection [Triennial] | |||
monitoring | 7/12EXAM - U21NITIAL OPERATOR LICENSING EXAM 4 | ||
program at IPEC. The enclosed inspection | 2 0611412010 06/1812010 U01787 FY10 - INDIAN POINT U2 INITIAL OPERATOR LICENSING EXAM | ||
plan details the baseline inspections, less those related to physical protection. | 2 07/1212010 07/23/2010 U01787 FY10 - INDIAN POINT U2 INITIAL OPERATOR LICENSING EXAM | ||
scheduled | 71124 - UNIT 2 OUTAGE HP INSP-ACCESSIALARAlAlR | ||
through June 30, 2011. The inspection | 2 03115/2010 03/1912010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
plan is provided to allow for the resolution | 2 03115/2010 03/1912010 IP 71124.02 Occupational ALARA Planning and Controls | ||
of any scheduling | 2 03/15/2010 03119/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation | ||
conflicts | PIR - ANS CORRECTIVE ACTION FOLLOW-UP | ||
and personnel | 2 03/1512010 03/19/2010 IF 71152*Reviews In-depth Reviews | ||
availability | 7111108P - U2 INSERVICE INSPECTION 1 | ||
issues well in advance of inspector | 2 03115/2010 0312612010 IP 7111108P Inservlce Inspectlon Activities* PWR | ||
arrival onsite. Routine resident inspections | TI-172 - U2 TI2515/172 DISSIMILAR METAL WELDS | ||
are not listed due to their ongoing and continuous | 2 03/1512010 0312612010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds | ||
nature. The inspections | 711528 -PI&R 4 | ||
in the last six months of the inspection plan | 2 05/0312010 05/07/2010 IP 711526 1dentification and Resolutlon of Problems | ||
are tentative | 2 05/1712010 05/2112010 IP 711528 Identification and Resolution of Problems | ||
and may be revised at the mid-cycle | 71124 - HP INSP -DOSEIREMPIISFSI 1 | ||
safety performance | 2 06128/2010 07/0212010 IP 60855 Operation Of An ISFSI | ||
review. In accordance | 2 0612812010 0710212010 IP 71124.04 Occupational Dose Assessment | ||
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure | 2 06/28/2010 0710212010 IP 71124.07 Public Radiation Safety | ||
will be made available | 71111118 * REQUAL INSP (IP2) WITH P/F RESULTS 3 | ||
electronically | 2 09t27/2010 10/0112010 IP 71111118 Licensed Operator Requalification Program | ||
for public inspection | EPEX - EP EXERCISE EVALUATION 4 | ||
in the NRC Public Document Room or from the Publicly Available | 2 09/13f2010 09/1712010 IP 7111401 Exercise Evaluation | ||
Records (PARS) component | 2 09/13/2010 09/1712010 IP 7111404 Emergency Action level and Emergency Plan Changes | ||
of NRC's document system (ADAMS). ADAMS is accessible | 2 09/13/2010 09/1712010 IP 71151-EP01 Dril1lExercise Perfomnance | ||
from the NRC Web site at | 2 09/1312010 09t17/20i0 IP 71151*EP02 ERO Drill Participation | ||
rm/adams.html (the Public Electronic | 2 09/13/2010 09/17f2010 IF 71151-EP03 Alert 8. Notification System | ||
Reading Room). 1 DeSignation | 71124 - OCC HP INSPECTION*ALARAIACCESSIPI | ||
in parentheses | 2 1210612010 12/1012010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
refers to ADAMS Accession | 2 12106(2010 1211012010 IP 71124.02 Occupational ALARA Planning and Controls | ||
Number. Documents | 2 12/06(2010 12110/2010 IP 71151-OROl Occupational Exposure Control Effectiveness | ||
referencedln | is report does not Include INPO and OUTAGE activities. | ||
this letter are publicly available | This report shows only on-site and announced inspection procedures. | ||
using the Accession | . | ||
Number in ADAMS. | -....... -~---------~ | ||
J. Pollock 3 If circumstances | |||
arise which cause us to change this inspection | Page 2 of2 Indian Point | ||
plan, we will contact you to discuss the change as soon as possible. | 0212412010 11:02:07 Inspection 1Activity Plan | ||
Please contact Mel Gray at 610-337-5209 | Report 22 | ||
with any questions | 01/01/2010 - 06130/2011 | ||
you may have regarding | Planned Dates | ||
this letter or the inspection | Start End Title | ||
plan. Director, Division of Reactor Projects Docket Nos. 50-247 and License No. DPR-26 and Enclosures: | 71124 - OCC HP INSPECTION-ALARAIACCESS/PI 1 | ||
Indian Point Nuclear Generating | 2 12/0612010 12110/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent | ||
Unit and Unit 3 Inspection/Activity cc w/encl: Distribution | 71124 - HP INSP-INSTRUMENTS 1 | ||
2 01/1012011 01/14/2011 IP 71124.05 Radiation Monitoring Instrumentation | |||
J. Pollock 3 If circumstances | TI-177 - MANAGING GAS ACCUMULATION IN ECCS | ||
arise which cause us to change this inspection | 2 01/10/2011 01/14/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System | ||
plan. we will contact you to discuss the change as soon as possible. Please | 71124 - HP INSP-ACCESS 1 | ||
contact Mel Gray at | 2 0312112011 03/25/2011 IF 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
with any questions | 71124 - HP INSP-RAO WASTE & ISFSI 1 | ||
you may have regarding | 2 0611312011 0611712011 IP 60855 Operation Of An ISFSI | ||
this letter or the inspection | 2 06/1312011 06'17/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation | ||
plan. Sincerely, IRA! David C. Lew Director, Division of Reactor Projects Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64 Enclosures: | his report does not Include INPO and OUTAGE activities. | ||
Indian Point Nuclear Generating | This report shows only on-site and announced inspection procedures. | ||
Unit 2 and Unit 3 Inspection/Activity | |||
Page 1 012 Indian Point 3 | |||
wfencl: S. Collins, RA (R10RAMAIL | 0212412010 13:06:06 Inspection I Activity Plan | ||
RESOURCE) | Report 22 | ||
P. Cataldo, DRP, SRI M. Dapas, DRA (R10RAMAIL | 01/01/2010 - 0613012011 | ||
RESOURCE) | Planned Oates | ||
M. Halter, DRP, RI D. Lew, DRP (R1DRPMAIL | Start End I Insoection Activitv I' Title | ||
RESOURCE) | TRI FIRE - IP3 PORTIONS OF THE TR( FIRE | ||
D. Hochmuth, DRP J. Clifford, DRP (R1DRPMAIL | 3 01/25/2010 0112912010 IP 71111051 Fire Protection [Triennial] | ||
RESOURCE) | 71124 - HP OUTAGE INSPECTION | ||
RidsNrrPMlndianPoint | 3 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
PIR - ANS CORRECTIVE ACTION FOLLOW-UP 1 | |||
Resource) | 3 03/15/2010 03/1912010 IP 71152-Reviews In-{jepit1 Reviews | ||
RidsNrrDorlLpl1-1 | 71124 - HP OUTAGE INSPECTION 1 | ||
3 0312212010 0312612010 IP 71124.02 Occupational AlARA Planning and Controls | |||
Resource) | 3 03122/2010 0312612010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation | ||
ROPreport | 95001 - 95001 SUPPLEMENTAL INSPECTION 2 | ||
Resource@nrc.gov | 3 0411912010 0412312010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area | ||
L. Trocine, RI OEDO DRS Branch Chiefs (6) M. Gray, DRP L. Scholl, DRS B. Bickett, DRP D. Silk, DRS S. McCarver, DRP J. Trapp, DRS M. Osborn, DRP D. Screnci, PAO E. Keighley, DRP N. Sheehan, PAO B. Haagensen, Acting SRI R. Barkley, ORA A. Ayegbusi, DRP, RI SUNSI Review Complete: | 10/04EXM - U31NITIAL OPERATOR LICENSING EXAM 5 | ||
__B=B___,(Reviewer's | 3 0910612010 09/10/2010 U01789 FY11 -INDIAN POINT U3 INITIAL OPERATOR LICENSING EXAM | ||
Initials) | 3 10/04/2010 10/15/2010 U01789 FYi1 - INDIAN POINT U3 INITIAL OPERATOR LICENSING EXAM | ||
ML 100620868 | 71124 - HP- DOSE I REMP IISFSI 1 | ||
DOCUMENT NAME: G;\DRP\BRANCHZ\ROP\ROP | 3 0612812010 07/0212010 IP 71124.04 Occupational Dose Assessment | ||
10\Annual | 3 0612812010 07/0212010 IP 71124.07 Public Radiation Safety | ||
Assessment | EP EX - EP EXERCISE EVAlUAT!ON 4 | ||
Letters\lPEC | 3 0911312010 09/1712010 IP 7111401 Exercise Evaluation | ||
2010 Annual Assessment | 3 09113/2010 09/17/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes | ||
LetterR4.doc | 3 0911312010 09/1712010 IP 71151-EP01 DrilllExercise Performance | ||
After declaring | 3 0911312010 09/1712010 IP 71151*EP02 ERO Drill Participation | ||
this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, Indicate in the box: "C" =Copy without attachment/enclosure | 3 09/13/2010 0911712010 IP 71151-EP03 Alert & Notification System | ||
;;:: | CDBI - COMPONENT DESIGN BASES INSPECTION 6 | ||
MGraylMXG | 3 10104/2010 10/0812010 IP 7111121 Component Design Bases Inspection | ||
DLew/DCL I DATE 02/24/2010 | 3 10/1812010 10/29/2010 IP 7111121 Component Design Bases Inspection | ||
0212412010 | 71124 - HP-ACCESS/ALARAIPI VERIFICATION | ||
03/03/2010 | 3 1210612010 1211012010 IP 71124.01 Radiological Hazard Assessmerlt and Exposure Controls | ||
OFFICIAL RECORD COpy | 3 1210612010 12110/2010 IP 71124.02 Occupational Al.ARA Planning and Controls | ||
Page 1 of2 0212412010 | 3 1210612010 1211012010 IP 71151*0R01 Occupational Exposure Control Effectiveness | ||
3 1210612010 1211012010 IP 71151-PR01 RETS/ODCM Radiological Effluent | |||
71124 - HP INSTRUMENTS 1 | |||
3 01/10/2011 01/14/2011 IP 71124.05 Radiation Monitoring Instrumentation | |||
TI*177 * MANAGING GAS ACCUMULATION IN ECCS 2 | |||
3 01/1012011 01114/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System | |||
his report does not include INPQ and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 012 Indian Point 3 | |||
0212412010 13:08:08 Inspection I Activity Plan | |||
Report 22 | |||
01/01/2010 * 06/3012011 | |||
Planned Dates | |||
Start End Title | |||
7111108P * U3 INSERVICE INSPECTION 1 | |||
03/ | 3 03(1412011 03/25/2011 IP 7111108P Inservice Inspection ActlvlUes - PWR | ||
03115/2010 | 71124 - HP ACCESS | ||
3 0312112011 0312512011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
03/ | TRI fiRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 | ||
3 0510912011 05/1312011 IP 7111105T Fire Protection [Trienniaij | |||
3 05123/2011 05/27/2011 IP 7111105T Fire Protection [TriennlaO | |||
71124 - HP- RAD WASTE IISFSI | |||
3 06/1312011 06/1712011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage, and Transportation | |||
his report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
/ | |||
- | |||
IP | |||
IP 71124.01 Radiological | |||
Hazard Assessment | |||
and Exposure Controls IP 71124.02 Occupational | |||
ALARA Planning and Controls | |||
1 | |||
IP 71124. | |||
IP | |||
IP 71124. | |||
and | |||
This report shows only on-site and announced | |||
inspection | |||
procedures. | |||
1 | |||
- | |||
Planned | |||
IP 71124. | |||
IP 71124. | |||
- | |||
1 | |||
13 | |||
- | |||
IP | |||
3 | |||
IP | |||
Hazard | |||
and Exposure Controls | |||
IP | |||
IP | |||
3 | |||
IP | |||
3 | |||
IP | |||
IP | |||
inspection | |||
}} | }} |
Latest revision as of 05:52, 12 November 2019
ML12089A601 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/03/2010 |
From: | David Lew Division Reactor Projects I |
To: | Joseph E Pollock Entergy Nuclear Operations |
SECY RAS | |
Shared Package | |
ML12089A599 | List: |
References | |
RAS 22132, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR, IR-10-001 | |
Download: ML12089A601 (8) | |
See also: IR 05000247/2010001
Text
{{#Wiki_filter:ENT000344
Submitted: March 29, 2012 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PENNSYLVANIA 19406-1415 March 3, 2010 Mr. Joseph E. Pollock Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB Buchanan, NY 10511-0249 SUBJECT: ANNUAL ASSESSMENT LETTER - INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORTS 05000247/2010001 & 05000286/2010001) Dear Mr. Pollock: On February 12, 2010. the NRC staff completed its performance review of Indian Point Nuclear Generating {Indian Point} Units 2 and 3. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance
during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives, Plant performance at Unit 2 for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and an Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at Unit 2. Plant performance for the most recent quarter at Unit 3 was within the Regulatory Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and one PI of low to moderate safety significance (White) in the Initiating Events cornerstone. Specifically, the Unit 3 "Unplanned Scrams per 7000 Critical Hours" PI exceeded the GreenlWhite threshold of greater than three scrams per 7000 critical hours in the third and fourth quarters of the assessment cycle. On January 28. 2010, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review your actions taken to address the Unit 3 "Unplanned Scrams per 7000 Critical Hours" PI. Therefore, we plan to conduct a supplemental inspection using
J, Pollock 2 Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," beginning on April 19, 2010, This inspection is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence. In addition to the baseline inspection program at Units 2 and 3, and the supplemental inspection at Unit 3, we plan to conduct independent spent fuel storage installation inspections. With regard to the replacement Alert and Notification System (ANS), we plan to monitor your performance through the Alert and Notification System PI and through baseline inspections. Specifically. our inspection plan includes focused problem identification and resolution baseline inspections to review your corrective actions related to the replacement ANS test results from December 2009. Additionally. the NRC plans to continue to monitor your activities related to final review and approval of the replacement ANS by the Federal Emergency Management Agency. During this assessment period, the NRC staff continued augmented oversight of your activities related to on-site groundwater contamination in accordance with the ROP Deviation Memorandum in effect for calendar year 2009 [ADAMS Ref. ML083590057]1. A team of NRC
inspectors conducted an onsite inspection in August and September 2009. to review your activities associated with characterization and mitigation of onsite groundwater contamination.
Based on the inspection results documented in an inspection report dated October 19, 2009, [ADAMS Ref. ML092920121] and NRC's monitoring of sampling activities and independent
testing of groundwater samples, the NRC concluded that you have satisfied the closure requirements detailed in the Deviation Memorandum regarding the establishment, implementation, and maintenance of an effective groundwater program to provide continued radiological monitoring of the groundwater conditions at the Indian Point Energy Center (lPEC). Therefore, we plan to implement normal baseline inspections to assess your implementation of the groundwater monitoring program at IPEC. The enclosed inspection plan details the baseline inspections, less those related to physical protection. scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the mid-cycle safety performance review. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room). 1 DeSignation in parentheses refers to ADAMS Accession Number. Documents referencedln this letter are publicly available using the Accession Number in ADAMS.
J. Pollock 3 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Director, Division of Reactor Projects
Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64 Enclosures: Indian Point Nuclear Generating Unit ~! and Unit 3 Inspection/Activity Plans cc w/encl: Distribution via ListServ
J. Pollock 3 If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact Mel Gray at 610-337~5209 with any questions you may have regarding this letter or the inspection plan. Sincerely, IRA! David C. Lew Director, Division of Reactor Projects Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64 Enclosures: Indian Point Nuclear Generating Unit 2 and Unit 3 Inspection/Activity Plans Distribution wfencl: S. Collins, RA (R10RAMAIL RESOURCE) P. Cataldo, DRP, SRI M. Dapas, DRA (R10RAMAIL RESOURCE) M. Halter, DRP, RI D. Lew, DRP (R1DRPMAIL RESOURCE) D. Hochmuth, DRP J. Clifford, DRP (R1DRPMAIL RESOURCE) RidsNrrPMlndianPoint Resource D. Roberts, DRS (R1DRSMail Resource) RidsNrrDorlLpl1-1 Resource P. Wilson, DRS (R1DRSMaii Resource) ROPreport Resource@nrc.gov L. Trocine, RI OEDO DRS Branch Chiefs (6) M. Gray, DRP L. Scholl, DRS B. Bickett, DRP D. Silk, DRS S. McCarver, DRP J. Trapp, DRS M. Osborn, DRP D. Screnci, PAO E. Keighley, DRP N. Sheehan, PAO B. Haagensen, Acting SRI R. Barkley, ORA A. Ayegbusi, DRP, RI SUNSI Review Complete: __B=B___,(Reviewer's Initials) ML 100620868 DOCUMENT NAME: G;\DRP\BRANCHZ\ROP\ROP 10\Annual Assessment Letters\lPEC 2010 Annual Assessment LetterR4.doc After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, Indicate in the box: "C" =Copy without attachment/enclosure "E" ;;:: Copy with atta ch ment/encI osure 'N"= ' No copy OFFICE RIIDRP I RIIDRP I RlfDRP J I 1 NAME BBickettiBB MGraylMXG DLew/DCL
I DATE 02/24/2010 0212412010 03/03/2010
OFFICIAL RECORD COpy
Page 1 of2 Indian Point 0212412010 11:02:07 Inspection / Activity Plan Report 22
01/0112010 - 06/30/2011 Planned Dates Start End Title TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 2 0112512010 0112912010 IP 7111105T Fire Protection [Triennia~ 2 02/08/2010 02112/2010 IP 71111051 Fire Protection [Triennial] 7/12EXAM - U21NITIAL OPERATOR LICENSING EXAM 4 2 0611412010 06/1812010 U01787 FY10 - INDIAN POINT U2 INITIAL OPERATOR LICENSING EXAM 2 07/1212010 07/23/2010 U01787 FY10 - INDIAN POINT U2 INITIAL OPERATOR LICENSING EXAM 71124 - UNIT 2 OUTAGE HP INSP-ACCESSIALARAlAlR 2 03115/2010 03/1912010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03115/2010 03/1912010 IP 71124.02 Occupational ALARA Planning and Controls 2 03/15/2010 03119/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation PIR - ANS CORRECTIVE ACTION FOLLOW-UP 2 03/1512010 03/19/2010 IF 71152*Reviews In-depth Reviews 7111108P - U2 INSERVICE INSPECTION 1 2 03115/2010 0312612010 IP 7111108P Inservlce Inspectlon Activities* PWR TI-172 - U2 TI2515/172 DISSIMILAR METAL WELDS 2 03/1512010 0312612010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 711528 -PI&R 4 2 05/0312010 05/07/2010 IP 711526 1dentification and Resolutlon of Problems 2 05/1712010 05/2112010 IP 711528 Identification and Resolution of Problems 71124 - HP INSP -DOSEIREMPIISFSI 1 2 06128/2010 07/0212010 IP 60855 Operation Of An ISFSI 2 0612812010 0710212010 IP 71124.04 Occupational Dose Assessment 2 06/28/2010 0710212010 IP 71124.07 Public Radiation Safety 71111118 * REQUAL INSP (IP2) WITH P/F RESULTS 3 2 09t27/2010 10/0112010 IP 71111118 Licensed Operator Requalification Program EPEX - EP EXERCISE EVALUATION 4 2 09/13f2010 09/1712010 IP 7111401 Exercise Evaluation 2 09/13/2010 09/1712010 IP 7111404 Emergency Action level and Emergency Plan Changes 2 09/13/2010 09/1712010 IP 71151-EP01 Dril1lExercise Perfomnance 2 09/1312010 09t17/20i0 IP 71151*EP02 ERO Drill Participation 2 09/13/2010 09/17f2010 IF 71151-EP03 Alert 8. Notification System 71124 - OCC HP INSPECTION*ALARAIACCESSIPI 2 1210612010 12/1012010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 12106(2010 1211012010 IP 71124.02 Occupational ALARA Planning and Controls 2 12/06(2010 12110/2010 IP 71151-OROl Occupational Exposure Control Effectiveness is report does not Include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. . -....... -~---------~
Page 2 of2 Indian Point 0212412010 11:02:07 Inspection 1Activity Plan Report 22
01/01/2010 - 06130/2011 Planned Dates Start End Title 71124 - OCC HP INSPECTION-ALARAIACCESS/PI 1 2 12/0612010 12110/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent 71124 - HP INSP-INSTRUMENTS 1 2 01/1012011 01/14/2011 IP 71124.05 Radiation Monitoring Instrumentation TI-177 - MANAGING GAS ACCUMULATION IN ECCS 2 01/10/2011 01/14/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 - HP INSP-ACCESS 1 2 0312112011 03/25/2011 IF 71124.01 Radiological Hazard Assessment and Exposure Controls 71124 - HP INSP-RAO WASTE & ISFSI 1 2 0611312011 0611712011 IP 60855 Operation Of An ISFSI 2 06/1312011 06'17/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation his report does not Include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 1 012 Indian Point 3 0212412010 13:06:06 Inspection I Activity Plan Report 22
01/01/2010 - 0613012011 Planned Oates Start End I Insoection Activitv I' Title TRI FIRE - IP3 PORTIONS OF THE TR( FIRE 3 01/25/2010 0112912010 IP 71111051 Fire Protection [Triennial] 71124 - HP OUTAGE INSPECTION 3 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls PIR - ANS CORRECTIVE ACTION FOLLOW-UP 1 3 03/15/2010 03/1912010 IP 71152-Reviews In-{jepit1 Reviews 71124 - HP OUTAGE INSPECTION 1 3 0312212010 0312612010 IP 71124.02 Occupational AlARA Planning and Controls 3 03122/2010 0312612010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 95001 - 95001 SUPPLEMENTAL INSPECTION 2 3 0411912010 0412312010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 10/04EXM - U31NITIAL OPERATOR LICENSING EXAM 5 3 0910612010 09/10/2010 U01789 FY11 -INDIAN POINT U3 INITIAL OPERATOR LICENSING EXAM 3 10/04/2010 10/15/2010 U01789 FYi1 - INDIAN POINT U3 INITIAL OPERATOR LICENSING EXAM 71124 - HP- DOSE I REMP IISFSI 1 3 0612812010 07/0212010 IP 71124.04 Occupational Dose Assessment 3 0612812010 07/0212010 IP 71124.07 Public Radiation Safety EP EX - EP EXERCISE EVAlUAT!ON 4 3 0911312010 09/1712010 IP 7111401 Exercise Evaluation 3 09113/2010 09/17/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 0911312010 09/1712010 IP 71151-EP01 DrilllExercise Performance 3 0911312010 09/1712010 IP 71151*EP02 ERO Drill Participation 3 09/13/2010 0911712010 IP 71151-EP03 Alert & Notification System CDBI - COMPONENT DESIGN BASES INSPECTION 6 3 10104/2010 10/0812010 IP 7111121 Component Design Bases Inspection 3 10/1812010 10/29/2010 IP 7111121 Component Design Bases Inspection 71124 - HP-ACCESS/ALARAIPI VERIFICATION 3 1210612010 1211012010 IP 71124.01 Radiological Hazard Assessmerlt and Exposure Controls 3 1210612010 12110/2010 IP 71124.02 Occupational Al.ARA Planning and Controls 3 1210612010 1211012010 IP 71151*0R01 Occupational Exposure Control Effectiveness 3 1210612010 1211012010 IP 71151-PR01 RETS/ODCM Radiological Effluent 71124 - HP INSTRUMENTS 1 3 01/10/2011 01/14/2011 IP 71124.05 Radiation Monitoring Instrumentation TI*177 * MANAGING GAS ACCUMULATION IN ECCS 2 3 01/1012011 01114/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System his report does not include INPQ and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 012 Indian Point 3 0212412010 13:08:08 Inspection I Activity Plan Report 22
01/01/2010 * 06/3012011 Planned Dates Start End Title 7111108P * U3 INSERVICE INSPECTION 1 3 03(1412011 03/25/2011 IP 7111108P Inservice Inspection ActlvlUes - PWR 71124 - HP ACCESS 3 0312112011 0312512011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls TRI fiRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 3 0510912011 05/1312011 IP 7111105T Fire Protection [Trienniaij 3 05123/2011 05/27/2011 IP 7111105T Fire Protection [TriennlaO 71124 - HP- RAD WASTE IISFSI 3 06/1312011 06/1712011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage, and Transportation his report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}