ML12137A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:May 15, 2012 David A. Repka, Esq.
{{#Wiki_filter:May 15, 2012 David A. Repka, Esq.                                  Diane Curran, Esq.
Tyson Smith, Esq.
Tyson Smith, Esq.                                     Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco                                           1726 M Street NW Winston & Strawn LLP                                   Washington, DC 20036 101 California Street                                 Suite 600 San Francisco, CA 94111-5802                           E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Docket Nos. 50-275-LR and 50-323-LR
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.
Harmon, Curran, Spielberg, and Eisenberg


1726 M Street NW Washington, DC 20036 Suite 600 E-mail: dcurran@harmoncurran.com In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2
==Dear Parties:==
) Docket Nos. 5 0-275-LR and 5 0-323-LR 


==Dear Parties:==
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 20 10, the Staff will monthly provid e the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336
Attached is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).
. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff.
Respectfully submitted,
Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index. Attac hed is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).                 Respectfully submitted,           /signed (electronically) by/
                                                              /signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff
Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Elaine M. Keegan}}
:
Affidavit of Elaine M. Keegan}}

Revision as of 03:29, 12 November 2019

2012/05/15 - Diablo Canyon - May Hearing File Update
ML12137A024
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/15/2012
From: Subin L
NRC/OGC
To: Curran D, Repka D, Sisco C, Tanya Smith, Zamek J
Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, Pacific Gas & Electric Co, San Luis Obispo Mothers for Peace, Winston & Strawn, LLP
SECY RAS
References
50-275-LR, 50-323-LR
Download: ML12137A024 (3)


Text

May 15, 2012 David A. Repka, Esq. Diane Curran, Esq.

Tyson Smith, Esq. Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco 1726 M Street NW Winston & Strawn LLP Washington, DC 20036 101 California Street Suite 600 San Francisco, CA 94111-5802 E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.

Attached is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Elaine M. Keegan