ML110750091

From kanterella
Jump to navigation Jump to search
Diablo Canyon - March Hearing File Update
ML110750091
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/15/2011
From: Subin L
NRC/OGC
To: Curran D, Repka D, Zamek J
Atomic Safety and Licensing Board Panel
Subin, Lloyd B., 415-1988
References
50-275-LR, 50-323-LR, RAS QQ-9
Download: ML110750091 (8)


Text

March 15, 2011 David A. Repka, Esq. Diane Curran, Esq.

Tyson Smith, Esq. Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco 1726 M Street NW Winston & Strawn LLP Washington, DC 20036 101 California Street Suite 600 San Francisco, CA 94111-5802 E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff is providing the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. The index contains the ADAMS accession number, date, and title of each item so as to make the item readily retrievable from the agencys website, www.nrc.gov, using the ADAMS Find function in accordance with 10 C.F.R. § 2.1203. Also attached is the Affidavit of Andrew L. Stuyvenberg, as required by 10 C.F.R. § 2.336(c).

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff

Enclosures:

Attachment 1: Hearing File Index Attachment 2: Affidavit of Andrew L Stuyvenberg

March 15, 2011 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards September 15, 2010, Memorandum, and Section 2.1203(a), the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff letter dated March 15, 2011, have been served upon the following by the Electronic Information Exchange, this 15th day of March, 2011:

Administrative Judge Office of Commission Appellate Alex S. Karlin, Chair Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Mail Stop - O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov E-mail: ask2@nrc.gov Administrative Judge Office of the Secretary Nicholas G. Trikouros Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov E-mail: ngt@nrc.gov Administrative Judge David A. Repka, Esq.

Paul B. Abramson Tyson Smith, Esq.

Atomic Safety and Licensing Board Panel Carlos Sisco Mail Stop - T-3 F23 Winston & Strawn LLP U.S. Nuclear Regulatory Commission 101 California Street Washington, DC 20555-0001 San Francisco, CA 94111-5802 E-mail: pba@nrc.gov E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com

Jill ZamEk, Esq. Diane Curran, Esq.

San Luis Obispo Mothers for Peace Harmon, Curran, Spielberg, and Eisenberg 1123 Flora Road 1726 M Street NW Arroyo Grande, CA 93420 Suite 600 E-mail: jzk@charter.net Washington, DC 20036 E-mail: dcurran@harmoncurran.com

/signed (electronically) by/

Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: March 15, 2011

Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index Update - March 15, 2011 ADAMS Accession ADAMS Package Nos.

ID No. No. Document Date (If Applicable) Title 06-0001 ML110590394 9/20/2010 2010/09/20 Diablo Canyon LR - RE: DCPP Regional Inspection Notifications 2010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit 06-0002 ML110590386 9/21/2010 Meeting Roster 9/16/2010 2010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit 06-0003 ML110590393 9/21/2010 Meeting Roster 9/16/2010 06-0004 ML110590373 9/21/2010 2010/09/21 Diablo Canyon LR - RE: Documents Request 2010/10/13 Diablo Canyon LR - RE: Diesel Engine Jacket Cooling Water 06-0005 ML110590359 10/13/2010 Pumps (128-2) 06-0006 ML110590349 10/27/2010 2010/10/27 Diablo Canyon LR - RE: Regional Inspection Spreadsheet 06-0007 ML110590310 10/28/2010 2010/10/28 Diablo Canyon LR - Doc List Docs needed & Civil Question 06-0008 ML110590289 10/29/2010 2010/10/29 Diablo Canyon LR - RE: Doc List Docs needed & Civil Question 06-0009 ML110590288 10/31/2010 2010/10/31 Diablo Canyon LR - Last Set of files needed electronically 06-0010 ML110590287 11/9/2010 2010/11/09 Diablo Canyon LR - RE: Regional Inspection Spreadsheet 2010/11/10 Diablo Canyon LR - RE: One time inspection - basis for sampling 06-0011 ML110590268 11/10/2010 size and criteria 06-0012 ML110590280 11/10/2010 2010/11/10 Diablo Canyon LR - RE: SAPN 50341879 (Regulator Material) 06-0013 ML110590245 11/15/2010 2010/11/15 Diablo Canyon LR - RE: Two simple questions 06-0014 ML110590258 11/15/2010 2010/11/15 Diablo Canyon LR - Two simple questions 2010/12/21 Diablo Canyon LR - FW: Information request - Diablo Canyon -

06-0015 ML110620527 12/21/2010 Neutron noise 2011/01/21 Diablo Canyon LR - RE: Information request - Diablo Canyon -

06-0016 ML110620532 1/21/2011 Neutron noise 2011/02/16 Diablo Canyon LR - RE: SAP Notifications and Compressed air 06-0017 ML110590232 2/16/2011 system drawing 06-0018 ML110470447 2/16/2011 2011/02/16 Diablo Canyon LR - Schedule Update 06-0019 ML110480873 2/17/2011 2011/02/17 Diablo Canyon LR - Schedule change letter is signed. . .

Page 1 of 2

Attachment 1 - Diablo Canyon License Renewal Hearing File and Manadatory Disclosures Hearing File Index Update - March 15, 2011 2011/02/18 Diablo Canyon LR - FW: Diablo Canyon: REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 06-0020 ML110560107 2/18/2011 AND 2, LICENSE RENEWAL APPLICATION 2011/02/23 Diablo Canyon LR - RE: NRC review schedule for Diablo Canyon 06-0021 ML110560142 2/23/2011 re-licensing 2011/03/03 Diablo Canyon LR - SER Input 3.0.3.2.14 Event Driven RAI 06-0022 ML110690123 3/3/2011 Reposne Inaccessible Cable.doc 2011/03/04 Diablo Canyon LR - Endangered Species Consultation with Fish 06-0023 ML110630099 3/4/2011 and Wildlife Service re: License Renewal 06-0024 ML110680576 3/9/2011 2011/03/09 Diablo Canyon LR - Diablo License Renewal follow up question.

06-0025 ML110730779 3/14/2011 2011/03/14 Diablo Canyon LR - Draft Telecon Summary Page 2 of 2

In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR NRC Staff Transmittal Letter dated March 15, 2011 Attachment 2 Affidavit of Nathaniel B. Ferrer

March 1S, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR

)

(Diablo Canyon Nuclear Power Plant )

Units 1 and 2)

AFFIDAVIT OF NATHANIEL B. FERRER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Nathaniel B. Ferrer, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of March 1S, 2011.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

~--=~-----

Nathaniel B. Ferrer Executed in Rockville, Maryland this 1Sth day of March, 2011