ML12180A452: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12180A452
| number = ML12180A452
| issue date = 06/28/2012
| issue date = 06/28/2012
| title = Fort Calhoun Station - Notification of NRC Retake Operator Licensing Examination 05000285/2012302
| title = Notification of NRC Retake Operator Licensing Examination 05000285/2012302
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Bannister D J
| addressee name = Bannister D
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
| license number = DPR-040
| license number = DPR-040
| contact person = vlm/Steely C D
| contact person = vlm/Steely C
| case reference number = 50-285/OL-12-302
| case reference number = 50-285/OL-12-302
| document type = Letter, License-Operator, Part 55 Examination Related Material
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000285/2012302]]
See also: [[see also::IR 05000285/2012302]]


=Text=
=Text=
{{#Wiki_filter:June 28, 2012   David J. Bannister, Vice President     and Chief Nuclear Officer  
{{#Wiki_filter:UNITE D S TATE S
Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000285/2012302   Dear Mr. Bannister: In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012. As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power  
                                                      RE G IO N I V
Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  
                                                1600 EAST LAMAR BLVD
To meet the above schedule, it will be necessary for your staff to furnish the examination outline by July 13, 2012. The written examination and reference materials identified in Attachment 3 to ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and tests before they are submitted to the NRC  
                                          AR L INGTON , TEXAS 7 60 11 - 4511
for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.   In order to conduct the requested written examinations, it will be necessary for your staff to  
                                          June 28, 2012
provide adequate space and accommodations in accordance with ES-402.   Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
David J. Bannister, Vice President
D. Bannister - 2 -  To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
  and Chief Nuclear Officer
examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch
Omaha Public Power District
(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
Fort Calhoun Station FC-2-4
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  Thank you for your cooperation in this matter.  Mr. Giebelhausen has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159.        Sincerely,        /RA/ 
P.O. Box 550
      Mark S. Haire, Chief Operations Branch      Division of Reactor Safety  Docket:  50-285 License:  DPR-40
Fort Calhoun, NE 68023-0550
Distribution made electronically to Fort Calhoun   
SUBJECT:       FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR
D. Bannister - 3 -  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov)  Deputy Regional Administrator (Art.Howell@nrc.gov)  DRP Director (Kriss.Kennedy@nrc.gov)  DRP Deputy Director (Troy.Pruett@nrc.gov)  Acting DRS Director (Tom.Blount@nrc.gov)  Acting DRS Deputy Director (Patrick.Louden@nrc.gov)  Senior Resident Inspector (John.Kirkland@nrc.gov)  Resident Inspector (Jacob.Wingebach@nrc.gov)  Branch Chief, DRP/F (Jeff.Clark@nrc.gov)  Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)  Project Engineer, DRP/F (Chris.Smith@nrc.gov)  FCS Administrative Assistant (Berni.Madison@nrc.gov)  Public Affairs Officer (Victor.Dricks@nrc.gov)  Public Affairs Officer (Lara.Uselding@nrc.gov)  Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)  Project Manager (Lynnea.Wilkins@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  Regional Counsel (Karla.Fuller@nrc.gov)  Technical Support Assistant (Loretta.Williams@nrc.gov)  Congressional Affairs Officer (Jenny.Weil@nrc.gov)  OEMail Resource  RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)  DRS/TSB STA (Dale.Powers@nrc.gov)      R:\_REACTOR\FC\2012\FC 2012302 retake exam-cds.docx ADAMS Accession No.: ML12180A452 ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  CDS    Publicly Available  Non-Sensitive    Non-publicly Available  Sensitive OE: DRS/OB C: DRS/C OB  CDS MSH  /RA/ /RA/  06/20/2012 06/22/2012  OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax 
                LICENSING EXAMINATION 05000285/2012302
Dear Mr. Bannister:
In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager
Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made
for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outline
by July 13, 2012. The written examination and reference materials identified in Attachment 3 to
ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code
of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the outline, examination, and tests before they are submitted to the NRC
for review and approval. All materials shall be complete and ready-to-use. We request that any
personal, proprietary, sensitive unclassified, or safeguards information in your response be
contained in a separate enclosure and appropriately marked. Any delay in receiving the
required examination and reference materials, or the submittal of inadequate or incomplete
materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations are being administered.


D. Bannister                                  -2-
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments
regarding this burden estimate or any other aspect of these information collections, including
suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch
(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Giebelhausen has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself
at 817-200-1159.
                                                Sincerely,
                                                /RA/
                                                Mark S. Haire, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket: 50-285
License: DPR-40
Distribution made electronically to Fort Calhoun
ML12180A452
ADAMS:        No    6 Yes        6 SUNSI Review Complete        Reviewer Initials: CDS
                                  6 Publicly Available          6 Non-Sensitive
                                    Non-publicly Available        Sensitive
OE: DRS/OB              C: DRS/C OB
CDS                    MSH
/RA/                    /RA/
06/20/2012              06/22/2012
}}
}}

Latest revision as of 01:29, 12 November 2019

Notification of NRC Retake Operator Licensing Examination 05000285/2012302
ML12180A452
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/28/2012
From: Mark Haire
Operations Branch IV
To: Bannister D
Omaha Public Power District
vlm/Steely C
References
50-285/OL-12-302
Download: ML12180A452 (3)


See also: IR 05000285/2012302

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

June 28, 2012

David J. Bannister, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR

LICENSING EXAMINATION 05000285/2012302

Dear Mr. Bannister:

In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager

Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made

for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outline

by July 13, 2012. The written examination and reference materials identified in Attachment 3 to

ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code

of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility

licensee shall approve the outline, examination, and tests before they are submitted to the NRC

for review and approval. All materials shall be complete and ready-to-use. We request that any

personal, proprietary, sensitive unclassified, or safeguards information in your response be

contained in a separate enclosure and appropriately marked. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations are being administered.

D. Bannister -2-

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments

regarding this burden estimate or any other aspect of these information collections, including

suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch

(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Giebelhausen has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself

at 817-200-1159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Distribution made electronically to Fort Calhoun

ML12180A452

ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials: CDS

6 Publicly Available 6 Non-Sensitive

Non-publicly Available Sensitive

OE: DRS/OB C: DRS/C OB

CDS MSH

/RA/ /RA/

06/20/2012 06/22/2012